# 01816_15042026_1630_2025 ANNUAL REPORT
> Source: `01816_15042026_1630_2025 ANNUAL REPORT.pdf`
> Pages: 363
> Converted: 2026-04-27T17:48:18
---
# 中國廣核電力股份有限公司
# CGN Power Co., Ltd.*
(A joint stock company incorporated in the People’s Republic of China with limited liability)
**H Share Stock Code:** 1816
**A Share Stock Code:** 003816
# Energy that Connects
# Sustainability that Lasts
## 2025 Annual Report
\* For identification purpose only
---
# Contents
## Business at a Glance for the Year
| Topic | Page |
| :--- | :--- |
| 2025 Major Events | 1 |
| Key Data for 2025 | 2 |
| Business Model | 9 |
| **Chairman's Statement** | **10** |
| **President's Review** | **16** |
| **Shareholder Value** | **24** |
## Finance, Assets and Investments
| Topic | Page |
| :--- | :--- |
| Financial Performance and Analysis | 30 |
| Assets and Investments | 34 |
## Business Performance and Outlook
| Topic | Page |
| :--- | :--- |
| Industry Overview | 38 |
| Business Performance and Analysis | 40 |
| Future Outlook | 54 |
## Capitals
| Topic | Page |
| :--- | :--- |
| Production Capital | 58 |
| Intellectual Capital | 62 |
| Human Capital | 67 |
| Financial Capital | 77 |
| Environmental Capital | 83 |
| Social and Relationship Capital | 85 |
## Corporate Governance
| Topic | Page |
| :--- | :--- |
| Board of Directors and Senior Management | 94 |
| Corporate Governance Report | 101 |
| Directors' Report | 154 |
| Audit and Risk Management Committee Report | 172 |
| Remuneration Committee Report | 174 |
| Nomination Committee Report | 176 |
| Nuclear Safety Committee Report | 178 |
| Risk Management Report | 179 |
## Financial Report
| Topic | Page |
| :--- | :--- |
| Audit Report | 192 |
| Consolidated Balance Sheet | 197 |
| Balance Sheet of the Parent Company | 199 |
| Consolidated Income Statement | 201 |
| Income Statement of the Parent Company | 203 |
| Consolidated Cash Flow Statement | 204 |
| Cash Flow Statement of the Parent Company | 206 |
| Consolidated Statement of Changes in Shareholders' Equity | 207 |
| Statement of Changes in Shareholders' Equity of the Parent Company | 208 |
| Notes to the Financial Statements | 209 |
## Definitions
**352**
## Company Information
**357**
This 2025 Annual Report is the twelfth annual report of the Company since its listing. We continue to adopt the IIR as the major guideline for this Annual Report. In preparing this report, we have also followed the Environmental, Social and Governance Reporting Code of the Hong Kong Stock Exchange and referred to other relevant documents and guidelines such as "The Standards for Contents and Formats of Information Disclosure by Companies Publicly Offering Securities No. 2 – Contents and Formats of Annual Reports (Revision 2025)" of the CSRC as published in March 2025.
For continuous improvement of the quality of our annual reports, we welcome valuable advice on the contents and formats of this Annual Report. Please provide us your feedback by filling out the feedback form attached to this Annual Report.
Unless otherwise defined in this Annual Report, the terms used in this Annual Report shall have the same meanings as those defined in the 2024 Annual Report of the Company. This Annual Report has been prepared in Chinese and English respectively. In case of discrepancy, the Chinese version shall prevail.
On March 25, 2026, we have published the ESG Report separately to report to the community, the public, shareholders and all relevant parties on more ESG practices and achievements of the Company in 2025. For details, please refer to the 2025 ESG Report to be available on the website of the Hong Kong Stock Exchange at www.hkexnews.hk and the investors relationship column on our website at www.cgnp.com.cn.
---
# Business at a Glance for the Year
CGN Power was established on March 25, 2014, listed on the Main Board of the Hong Kong Stock Exchange on December 10, 2014, and listed on the SZSE on August 26, 2019.
CGN Power is the sole platform for nuclear power generation of CGNPC. We build, operate and manage nuclear power plants ("NPP(s)"), sell electricity generated by these NPPs, and organize to develop the design and research & development ("R&D") of NPPs.
Based on our principle of "Safety First, Quality Foremost, Pursuit of Excellence" and our work style focusing on "Strict Compliance, Prudent Decision-making, Detail-oriented and Fact-based Approach", we are committed to nuclear power-based electricity supply and services, to create the best benefits for our customers, shareholders, employees and society, and strive to become a world-class nuclear power supplier and service provider with international competitiveness.
## 2025 Major Events
### UNITS IN OPERATION
- The installed capacity of Daya Bay Unit 1 was approved to change from **984MW** to **1,026MW**
### ACQUISITIONS AND REFINANCING
- Acquired **5** companies from CGNPC
- The A Share Convertible Bonds of the Company were issued and listed
### UNITS UNDER CONSTRUCTION
- **4** units obtained project approval
- **6** units fully commenced construction Note: The units managed by the Group as entrusted by the controlling shareholder.
- **4** units achieved project milestone Note: The units managed by the Group as entrusted by the controlling shareholder.
- The expected dates of commencement of operation of Huizhou Unit 1 and Unit 2 were adjusted to the first half of 2026 and the second half of 2026
### CORPORATE GOVERNANCE
- The Supervisory Committee was abolished, and its duties and powers are exercised by the Audit and Risk Management Committee of the Board
- Changed executive Director, President and authorized representative
---
# Business at a Glance for the Year
## Key Data for 2025:
| Metric | Details / Value |
| :--- | :--- |
| **ON-GRID POWER GENERATION** | **232,648 Gwh** |
| - Controlling | 78.87% |
| - Non-controlling | 21.13% |
| **EMISSION REDUCTION CONTRIBUTION** | Reduction of standard coal consumption of approximately **21,496.69 ten thousand tons CO2** emission for on-grid power generation (including our associates) in 2025 |
| **GENERATING UNITS IN OPERATION** | **28** (in mainland China) |
| - Installed capacity | 31,838 MW |
| - Percentage | 52.17% |
| **GENERATING UNITS UNDER CONSTRUCTION** | **20 Note** Note: The number and installed capacity of the generating units under construction include the generating units approved and pending for FCD and the generating units managed by the Company as entrusted by the controlling shareholder of the Company. (in mainland China) |
| - Installed capacity | 24,222 MW |
| - Percentage | 37.26% |
---
| Metric | 2025 Value | Change from 2024 (restated) |
| :--- | :--- | :--- |
| **REVENUE** | RMB 75,696.6 million | decreasing by 4.1% |
| **DIVIDEND** (per Share) | RMB 0.086 (tax inclusive) | |
| **EARNINGS BEFORE INTEREST, TAX, DEPRECIATION AND AMORTIZATION (EBITDA)** | RMB 37,007.4 million | decreasing by 9.0% |
| **EARNINGS BEFORE INTEREST, TAX, DEPRECIATION AND AMORTIZATION (EBITDA)** (excluding the effect of non-recurring gains or losses) | RMB 36,281.3 million | decreasing by 10.6% |
| **NET PROFIT ATTRIBUTABLE TO SHAREHOLDERS OF THE PARENT COMPANY** | RMB 9,765.4 million | decreasing by 9.9% |
| **NET PROFIT ATTRIBUTABLE TO SHAREHOLDERS OF THE PARENT COMPANY** (excluding the effect of non-recurring gains or losses) | RMB 9,113.0 million | decreasing by 15.1% |
---
# Business at a Glance for the Year
## Financial Highlights
### Highlights of consolidated income statement
For the year ended December 31,
| | 2025 | 2024 Restated*** | 2023 Restated*** | 2022 Restated** | 2021 Restated* |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Operating revenue | 75,696,558,973.53 | 78,944,669,623.05 | 74,460,258,164.09 | 82,822,403,586.43 | 80,678,744,757.95 |
| Operating costs | 51,478,963,727.86 | 49,395,836,080.96 | 44,867,355,167.92 | 55,280,973,105.26 | 53,895,340,108.78 |
| Total profit | 18,602,715,153.37 | 21,627,616,828.29 | 20,451,248,820.54 | 18,700,132,726.93 | 18,165,985,817.29 |
| Net profit | 14,731,144,165.00 | 17,468,130,646.66 | 16,984,057,106.44 | 15,241,537,775.97 | 15,723,810,291.12 |
| Net profit attributable to shareholders of the parent company | 9,765,358,959.88 | 10,838,120,422.43 | 10,662,855,587.49 | 9,963,793,122.97 | 9,764,174,706.56 |
| Non-controlling interests | 4,965,785,205.12 | 6,630,010,224.23 | 6,321,201,518.95 | 5,277,744,653.00 | 5,959,635,584.56 |
### Highlights of consolidated balance sheet
As at December 31,
| | 2025 | 2024 Restated*** | 2023 Restated*** | 2022 Restated** | 2021 Restated* |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Total current assets | 77,891,455,021.68 | 72,711,369,859.36 | 74,390,540,059.52 | 70,504,910,095.09 | 67,966,150,830.45 |
| Total non-current assets | 427,764,663,042.23 | 398,821,228,641.90 | 376,495,336,119.11 | 338,511,007,620.51 | 332,071,669,746.55 |
| Total assets | 505,656,118,063.91 | 471,532,598,501.26 | 450,885,876,178.63 | 409,015,917,715.60 | 400,037,820,577.00 |
| Total current liabilities | 117,762,155,393.58 | 82,700,056,805.18 | 80,367,921,427.89 | 76,132,435,027.77 | 77,320,114,705.06 |
| Total non-current liabilities | 211,679,635,469.91 | 205,887,800,641.42 | 196,795,725,181.65 | 174,950,530,761.90 | 171,763,166,235.30 |
| Total liabilities | 329,441,790,863.49 | 288,587,857,446.60 | 277,163,646,609.54 | 251,082,965,789.67 | 249,083,280,940.36 |
| Total equity attributable to shareholders of the parent company | 123,188,474,073.11 | 128,585,130,656.30 | 120,385,515,118.45 | 107,026,303,523.98 | 100,941,837,380.17 |
| Non-controlling interests | 53,025,853,127.31 | 54,359,610,398.36 | 53,336,714,450.64 | 50,906,648,401.95 | 50,012,702,256.47 |
| Total shareholders' equity | 176,214,327,200.42 | 182,944,741,054.66 | 173,722,229,569.09 | 157,932,951,925.93 | 150,954,539,636.64 |
| Total liabilities and shareholders' equity | 505,656,118,063.91 | 471,532,598,501.26 | 450,885,876,178.63 | 409,015,917,715.60 | 400,037,820,577.00 |
\*: In 2022, the Group has implemented the relevant requirements and guidelines of the Accounting Standards for Business Enterprises promulgated by the Ministry of Finance in recent years, which mainly includes: requirement of the "accounting treatment for external sales of the fixed assets before reaching their intended use or the products or by-products produced during the R&D process of a company" and "determination of onerous contracts" in Interpretation No. 15 of the Accounting Standards for Business Enterprises (Cai Kuai [2021] No. 35) (《企業會計準則解釋第 15 號》(財會[2021]35 號)); and requirement of the "accounting treatment for income tax effects of dividends related to financial instruments classified as equity instruments of the issuer" and "accounting treatment for the change from cash-settled share-based payments to equity-settled share-based payments of a company" in Interpretation No. 16 of the Accounting Standards for Business Enterprises (Cai Kuai [2022] No. 31) (《企業會計準則解釋第 16 號》(財會[2022]31 號)). For details, please refer to Note (III) 31 to the financial statements of the 2022 Annual Report.
\*\*: In 2023, the Group has implemented the relevant requirements and guidelines of the Accounting Standards for Business Enterprises promulgated by the Ministry of Finance in recent years, which mainly includes: requirement of the "accounting treatment that the exemption of initial recognition shall not apply to the deferred income tax relating to assets and liabilities arising from a single transaction" in Interpretation No. 16 of the Accounting Standards for Business Enterprises (Cai Kuai [2022] No. 31) (《企業會計準則解釋第 16 號》(財會[2022]31 號)). For details, please refer to Note (III) 32 to the financial statements of the 2023 Annual Report.
\*\*\*: As the Company acquired a subsidiary under common control in 2025, the consolidated income statement for 2024 and 2023 and the consolidated balance sheet as at December 31, 2024 and December 31, 2023 of the Group have been restated.
---
# Major Subsidiaries, Associates and Joint Ventures as at December 31, 2025
## GNPJVC
**Interest: 75%**
GNPJVC is a Sino-foreign joint venture company established in the PRC on January 26, 1985 with 75% of its equity interests held by GNIC and the remaining 25% by HKNIC. GNPJVC owns Daya Bay NPP.
## Ling’ao Nuclear
**Interest: 100%**
Ling’ao Nuclear is a limited liability company established in the PRC on October 4, 1995 with 70% and 30% of its equity interests held by the Company and GNIC, respectively. Ling’ao Nuclear owns Ling’ao NPP.
## Lingdong Nuclear
**Interest: 93.88%**
Lingdong Nuclear is a limited liability company established in the PRC on September 15, 2004 with 25%, 30% and 45% of its equity interests held by the Company, GNIC and CGN Investment, respectively. Lingdong Nuclear owns Lingdong NPP.
## Yangjiang Nuclear
**Interest: 61.72%**
Yangjiang Nuclear is a limited liability company established in the PRC on February 23, 2005 with 34%, 25% and 7% of its equity interests held by the Company, GNIC and CGN Fund Phase I, respectively, and the remaining 17% and 17% by Guangdong Energy Group Co., Ltd. and CLP Nuclear Power (Yangjiang) Limited, respectively. Yangjiang Nuclear owns Yangjiang NPP.
## Ningde Nuclear
**Interest: 33.76%**
Ningde Nuclear is a limited liability company established in the PRC on March 23, 2006 with 46% of its equity interests held by CGN Ninghe Investment Co., Ltd. (中廣核寧核投資有限公司) and the remaining 44% and 10% by Datang International Power Generation Co., Ltd. (大唐國際發電股份有限公司) and Fujian Funeng Co., Ltd. (福建福能股份有限公司), respectively. Ningde Nuclear owns Ningde NPP.
## Hongyanhe Nuclear
**Interest: 38.88%**
Hongyanhe Nuclear is a limited liability company established in the PRC on August 28, 2006 with 45% of its equity interests held by CGN Investment, and the remaining 45% and 10% by State Power Investment Corporation Nuclear Energy Co., Ltd. (國電投核能有限公司) and Dalian State-owned Capital Management and Operation Co., Ltd. (大連市國有資本管理運營有限公司), respectively. Hongyanhe Nuclear owns Hongyanhe NPP. Hongyanhe Nuclear is an associate of the Company.
---
# Business at a Glance for the Year
### 7. Taishan Nuclear — 51%
**Taishan Nuclear** is a limited liability company established in the PRC on July 5, 2007 with 12.5% of its equity interests held by the Company, 10% by GNIC, 47.5% by Taishan Nuclear Power Industry Investment Co., Ltd. (台山核電產業投資有限公司), and the remaining 30% by EDF International and its subsidiary EDF (China) Holding Ltd. Taishan Nuclear owns Taishan NPP.
### 8. Lufeng Nuclear — 100%
**Lufeng Nuclear** is a limited liability company established in the PRC on February 20, 2008 and a wholly-owned subsidiary of the Company. Lufeng Nuclear owns Lufeng NPP.
### 9. Fangchenggang Nuclear — 36.6%
**Fangchenggang Nuclear** is a limited liability company established in the PRC on September 3, 2008 with 61% and 39% of its equity interests held by Guangxi Fangchenggang CGN Nuclear Power Industry Investment Co., Ltd. (廣西防城港中廣核核電產業投資有限公司) and Guangxi Fanghe Energy Investment Co., Ltd. (廣西防核能源投資有限公司), respectively. Fangchenggang Nuclear owns Fangchenggang NPP.
### 10. Taishan Second Nuclear — 100%
**Taishan Second Nuclear** is a limited liability company established in the PRC on January 13, 2011 and a wholly-owned subsidiary of the Company. Taishan Second Nuclear owns Taishan Phase II Project.
### 11. Huizhou Nuclear — 82%
**Huizhou Nuclear** is a limited liability company established in the PRC on September 16, 2013 with 82% of its equity interests held by the Company and 18% by China Datang Nuclear Power Investment Co., Ltd. (中國大唐集團核電投資有限公司). Huizhou Nuclear owns Huizhou NPP.
### 12. Zhanjiang Nuclear — 100%
**Zhanjiang Nuclear** is a limited liability company established in the PRC on November 13, 2015 and a wholly-owned subsidiary of the Company.
---
### 13. Ningde Second Nuclear
**51%**
Ningde Second Nuclear is a limited liability company established in the PRC on December 9, 2016 with 51% of its equity interests held by GNIC and the remaining 39% and 10% by China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) and Fujian Funeng Co., Ltd. (福建福能股份有限公司), respectively. Ningde Second Nuclear owns Ningde Phase II Project. Ningde Second Nuclear is a joint venture of the Company.
### 14. Zhaoyuan Nuclear
**100%**
Zhaoyuan Nuclear is a limited liability company established in the PRC on September 10, 2020 and a wholly-owned subsidiary of the Company. Zhaoyuan Nuclear owns Zhaoyuan NPP.
### 15. Fangchenggang Third Nuclear
**61.00%**
Fangchenggang Third Nuclear is a limited liability company established in the PRC on July 15, 2022 with 61% of its equity interests held by the Company and 39% by Guangxi Energy Group Co., Ltd. (廣西能源集團有限公司). Fangchenggang Third Nuclear owns Fangchenggang Phase III Project.
### 16. Huizhou Second Nuclear
**100%**
Huizhou Second Nuclear is a limited liability company established in the PRC on September 16, 2023 and a wholly-owned subsidiary of the Company. Huizhou Second Nuclear owns Huizhou Phase II Project.
### 17. Huizhou Third Nuclear
**100%**
Huizhou Third Nuclear is a limited liability company established in the PRC on February 16, 2025 and a wholly-owned subsidiary of the Company. Huizhou Third Nuclear owns Huizhou Phase III Project.
### 18. Eastern Guangdong Nuclear
**100%**
Eastern Guangdong Nuclear is a limited liability company established in the PRC on October 16, 2025 and a wholly-owned subsidiary of the Company. Eastern Guangdong Nuclear owns Lufeng Unit 5 and Unit 6 Project.
---
# Business at a Glance for the Year
## SNPI (19 - 100%)
**SNPI** was established in the PRC on May 13, 1978 and converted into a limited liability company on July 7, 2003. SNPI is a wholly-owned subsidiary of the Company.
## CGN Engineering (20 - 100%)
**CGN Engineering** is a limited liability company established in the PRC on November 11, 1997 and a wholly-owned subsidiary of the Company.
## DNMC (21 - 87.5%)
**DNMC** is a limited liability company established in the PRC on March 12, 2003 with 87.5% of its equity interests held by GNIC and the remaining 12.5% by CLP Nuclear Power Operations & Management (China) Limited (中電核電運營(中國)有限公司), respectively.
## CNPRI (22 - 100%)
**CNPRI** is a limited liability company established in the PRC on November 8, 2006 and a wholly-owned subsidiary of the Company.
## CGN Operations (23 - 100%)
**CGN Operations** is a limited liability company established in the PRC on August 3, 2012 and a wholly-owned subsidiary of the Company.
---
# Business Model
The core business of the Company focuses on nuclear power-based electricity supply and services. Through years of NPP construction and operation management, we have accumulated capital including production capital, intellectual capital, human capital, financial capital, environmental capital, and social and relationship capital. Through continuous investment in various forms of capital, we have created the optimal benefits for our customers, shareholders, employees and the society.
## Customer Values
- Reliable power
- Safe operation
- Efficient energy
## Shareholders' Returns
- Dividend distribution in cash
## Benefits for the Society and Environment
- Mutual benefits with communities
- Clean energy
## Core Operations and Governance
- **Brand + Culture**
- **Power Generation/Operation Services**
- **R&D and Design/Engineering Services**
- **Corporate Governance**
## Capital Inputs
- Production Capital
- Intellectual Capital
- Human Capital
- Financial Capital
- Environmental Capital
- Social and Relationship Capital
## Strategies
- Ensure the safe and stable operation of all the generating units in operation at a high level, and achieve high-quality production of the generating units under construction
- Adapt to the electricity power market reform, formulate policies in respect to the specific conditions of each province, and strengthen marketing
- Reduce costs, enhance efficiency, and improve profitability
- Reinforce technology R&D, and strengthen sustainable development capabilities
- Care for the environment, strengthen governance, and seek mutual development with the society
---
# Chairman's Statement
## Forging Excellence through Innovation on the New Journey
**Chairman** Yang Changli
---
Based on the provided rules, this page contains only images and footer information (page number and report title), which are to be ignored. There is no body text, data, or headings to transcribe.
---
# Chairman's Statement
**Dear shareholders,**
2025 marked an extraordinary year. In response to the complex changes in the domestic and international economic environment, China implemented more proactive and impactful macroeconomic policies. The national economy pressed forward amidst pressure in pursuit of innovation and optimization. The "14th Five-Year Plan" was successfully concluded. Driven by the accelerated pace of China's transition towards green and low-carbon energy, the steady progress made in the construction of a new type of power system, and the initial establishment of a unified national power market, the electricity traded in the market registered year-on-year growth. As a clean energy company, we reinforced our work style focusing on "Strict Compliance, Prudent Decision-making, Detail-oriented and Fact-based Approach". We further enhanced our core capabilities such as nuclear safety, energy security, industrial chain security, and resource security, effectively ensuring the secure supply of energy. We meticulously planned and promoted major projects, accelerated the formation of new quality productive forces, deepened reforms to foster high-quality development, and maintained stable operations. These achievements are attributable to the persistent and diligent efforts of all our employees, and the unwavering trust and strong support from our shareholders, customers, partners, national ministries, local governments, and other relevant parties. On behalf of the Board, I would like to extend our sincere gratitude to our shareholders and all those who have supported the development of the Company.
Over the past five years, we have consistently enhanced our comprehensive strength. The total installed capacity of the nuclear power generating units managed by us¹ (¹ Included the generating units approved and pending for FCD, the generating units under construction, the generating units in operation, and the generating units which were entrusted by the controlling shareholder for management) grew to 56,060 MW from 35,352 MW at the end of 2020. Our total assets increased to approximately RMB505.656 billion from approximately RMB391.898 billion. Our revenue rose to approximately RMB75.697 billion from approximately RMB70.585 billion.
Over the past five years, we have continuously consolidated our industrial competitiveness. Upholding the principle of nuclear safety as the utmost priority, the proportion of WANO performance indicators for the nuclear power generating units managed by us with their indicators reaching an advanced level² (² Ranked top 1/4 in the world) increased to 85.12% from 72.57% at the end of 2020, maintaining a worldwide advanced level. The demonstration project for our proprietary third-generation technology HPR1000 was fully completed, marking a new stage of batch construction.
---
Over the past five years, we have steadily strengthened our independent innovation capabilities. Our strategic initiatives, such as the design optimization of HPR1000 technology, the R&D of advanced nuclear power reactor types, and digital nuclear power, were proceeded in an orderly manner. We accelerated the establishment of our research platforms including the Southern Center and a national key laboratory as a source of original technology for advanced nuclear power, and have continuously facilitated the application of our research outcomes in the construction and operation of our NPPs. Our total R&D investment amounted to approximately RMB19.331 billion.
Over the past five years, we have deepened our comprehensive reforms across the board. By the end of 2025, the Company and several of its subsidiaries have completed the reform of their supervisory committees, which significantly enhanced governance efficiency along with clearer, more standardized definition of responsibilities, authorities, and exercise of power. In terms of human resources, our term-based and contract-based management system has been extended to middle management and above, with over 60% of these positions filled through open recruitment, thereby effectively invigorating the dynamism and motivation of our teams.
---
# Chairman’s Statement
Over the past five years, we have actively leveraged the role of nuclear power in implementing China’s “dual carbon” strategies and fulfilled our corporate responsibilities. By the end of 2025, our total on-grid power generation exceeded 1.07 trillion kWh, reducing carbon dioxide emissions by 992 million tons as compared to coal-fired power generation. We invested approximately RMB154 million in initiatives supporting rural revitalization and disaster relief, and recruited over 6,800 fresh graduates through on-campus recruitment.
We have always attached great importance to providing our shareholders with stable and reliable returns, and have consistently honored our commitments. In 2025, our net profit attributable to shareholders of the parent company was approximately RMB9,765 million, representing a decrease of 9.9% as compared with 2024 (restated). Nevertheless, the Board has proposed a dividend of RMB0.086 (tax inclusive) per share for 2025. Based on our total share capital as at the end of 2025, the dividend distribution ratio was approximately 44.47%, which fulfilled our dividend distribution plan for 2021 to 2025, and achieved a sustained increase in the dividend distribution ratio year by year. The cumulative dividends distributed over these five years amounted to approximately RMB22,522 million.
---
In 2025, we completed our first refinancing in the capital market following our A-share listing – the issuance and listing of our A-share convertible bonds on the SZSE. The proceeds of RMB4.9 billion will be used to fund the construction of our investment projects. We also successively acquired the equity interests in five nuclear power enterprises held by our controlling shareholder CGNPC: 100% equity interest in Taishan Second Nuclear, 82% equity interest in Huizhou Nuclear, 100% equity interest in Huizhou Second Nuclear, 100% equity interest in Huizhou Third Nuclear, and 100% equity interest in Zhanjiang Nuclear. These acquisitions have expanded the portfolio of nuclear power projects under construction and in reserve in which we have a controlling stake to avoid potential horizontal competition, and are conducive to our future growth in nuclear power generation and business performance.
The “15th Five-Year Plan” period represents a critical phase for China to consolidate the foundation and make comprehensive strides towards basically achieving socialist modernization. The year 2026, as the first and pivotal year of the “15th Five-Year Plan”, will present more uncertainties and unpredictable factors. Nonetheless, the underlying conditions and fundamental trends supporting the long-term positive trajectory of China’s economy remain unchanged. We will stay focused on our principal business and core responsibilities, and effectively enhance our core functions and core competitiveness. We are committed to ensuring a strong and solid start to the “15th Five-Year Plan”, and will continue to create value for the society, shareholders, employees, and all stakeholders on this new journey.
**Yang Changli**
**Chairman**
March 25, 2026
---
# President's Review
---
# Stable Operations with Enhanced Quality & Efficiency
President Pang Songtao
---
# President's Review
In 2025, China's power supply sustained its transition towards green and low-carbon development, and an overall balance between power supply and demand was maintained. The initial framework of a unified national power market was established, with the rising proportion of market-based power transactions. Amidst escalating challenges and increasingly demanding production and operations than previous years, our Company, through the concerted endeavors of all our employees, and by adopting a rigorous and pragmatic approach, strengthened our foundation, pursued development and formulated long-term planning, which facilitated stable corporate operations and enabled us to basically achieve our annual business targets. A summary of the key work and performance of the Company for the year and the outline of the major plans for the next year is presented in this Annual Report. The detailed analysis of the Company's business is set forth in the relevant sections of this Annual Report.
## Safety Management
Ensuring the absolute safety of nuclear power is the primary responsibility of nuclear power companies. We always adhere to the concept of "Nuclear Safety is our Overriding Priority" and the basic principles of "Safety First, Quality Foremost, Pursuit of Excellence", and persist in implementing these concepts and principles in every specific work step of the project construction, production and operation of NPPs.
In 2025, we successfully implemented China's Nuclear Power Industry Safety & Quality Enhancement Initiative (2022-2025) (《核電行業安全質量提升行動(2022-2025 年)》). We proceeded with our special action plan for nuclear safety management, and deepened the implementation of our three-year plan to address fundamental causes and enhance production safety. Our efforts were focused on improving our intrinsic safety levels and the effectiveness of our quality assurance system, continuously consolidating nuclear safety responsibilities at all levels, and further strengthening the proactive safety concept of "I want to be safe". By setting an example at the leadership level, we conducted safety inspections across all nuclear power sites as led by the Chairman and our senior management as a long-term initiative. All identified deficiencies and issues were rectified as planned, contributing to a steady improvement in safety management standards and a consistent positive trend in production safety performance across all units. We persistently supervised and facilitated enhancements in the effectiveness of the quality assurance systems across all units, and iteratively updated the Evaluation Criteria for Quality Assurance System Effectiveness. Through multiple stages, such as self-assessments by units, company-wide unified inspections, problem summarization and rectification reflection, as well as regular supervision for improvements, we continuously made progress in the enhancing the effectiveness of the quality assurance systems of all units. Further focusing on high standards of modularization, mechanization, automation, digitization, and intrinsic safety, we benchmarked against the best safety practices to focus on elevating our intrinsic safety levels.
---
In 2025, our safety management system functioned effectively, and we maintained our safety indicators at a sound level. No level 2 or above event under the INES occurred in all units in operation. All our 28 nuclear power generating units in operation achieved “zero unplanned outages”¹ ¹ “Zero unplanned outages”: no unplanned shutdowns or reactor trips occurred, with 85% of their WANO performance indicators reaching an advanced level. We have maintained a worldwide advanced level in terms of safety system performance and fuel reliability for three consecutive years. Furthermore, Yangjiang Nuclear was honored with the Global Performance Excellence Award (GPEA) 2025 and International Best Practice by the Asian Pacific Quality Organization (APQO), in recognition of its management performance, practical achievements, and its innovative multi-unit management model for NPPs.
Nevertheless, safety management is a never-ending journey. We must remain vigilant and in awe at all times. At no time does it allow for satisfaction or negligence. We must guard nuclear safety with a highly responsible attitude towards the country and society, striving for absolute safety and zero-failure tolerance.
# Operation Management
We always believe that we will be able to respond to various changes and challenges in external environment in a composed manner only if we keep on challenging ourselves while constantly ensuring the safety and stability of our units and enhancing core competitiveness. In 2025, we actively pushed forward the development of a risk-informed nuclear safety regulatory framework, and completed the transition of the Chinese technical specifications system for all second-generation and second-generation improved units, with the forced loss rate indicator across NPPs decreased by 64% year-on-year, achieving the best performance in our history. All nuclear power generating units in operation maintained safe and stable operation, which provided safe, reliable and economical clean electricity for the society.
Among various performance indicators, “Capacity Factor” best reflects our unit’s operation and maintenance performance. In 2025, the average capacity factor of the 28 nuclear power units in operation of the Company reached about 93%, which included 24 nuclear power units in operation adopting second-generation and second-generation improved nuclear power technology with an average capacity factor of about 95%, maintaining worldwide advanced level for several consecutive years. The average utilization hours of our nuclear power units throughout the year were 7,767 hours (average utilization hours for the latest three years was 7,662 hours), and the utilization rate of our units further increased as compared with 2024.
---
# President's Review
The quality and efficiency of refuelling outages for our units in operation is one of the important factors affecting the production and operation of the Company. We continued to promote optimization of outages from safety, quality, duration and other aspects to exert synergy. We successfully completed all 19 refuelling outages as planned for the year, which met the expected targets in terms of duration and quality. In particular, Daya Bay Unit 1 completed the verification process related to the increase in installed capacity. The average duration for ten-year outages of the Group fell below 40 days for the first time, which laid a foundation for the long-term safe and stable operation of these units and provided robust support for the supply of clean energy.
## Project Construction
In view of the national strategy of taking active, safe and orderly steps to develop nuclear power, only by getting well prepared for our projects and deepening internal and external collaboration can we seize development opportunities, which will in turn inject impetus into the long-term development of the Company. In 2025, Fangchenggang Phase III Project and Taishan Phase II Project were approved by the State in April; 6 units² ² Included an unit managed by us as entrusted by the controlling shareholder achieved the FCD and fully commenced construction; and 2 units³ ³ Included an unit managed by us as entrusted by the controlling shareholder obtained permits for operation and completed the initial fuelling.
With the application of our third-generation nuclear power technology HPR 1000 across multiple nuclear power projects, we implemented targeted improvements based on specific project characteristics, strengthened communication and coordination with upstream and downstream resources in the industrial chain, optimized construction methodologies, innovatively applied advanced construction technologies, coordinated the standardization of designs and the intensification of equipment, and enhanced experience feedback between projects, ensuring the quality of projects and promoting mutual progress along the industrial chain. In December 2025, to ensure the high-quality commissioning of our units and the subsequent safe and stable operation, the Company, after careful consideration, adjusted the commercial operation dates for Huizhou Unit 1 and Unit 2 to the first half and second half of 2026, respectively. Construction of other nuclear power generating units under construction of the Company continued to progress safely and steadily.
---
# Technology R&D
We continue to strengthen our efforts and investment in technology R&D and innovation with an aim to reserve core technologies for the long-term development of the Company while solving key problems encountered in project construction, production and operation processes through technological innovation, which improve the safety and economic efficiency of nuclear power. For example, Ningde Phase II Project successfully achieved fully mechanized welding for the prefabrication of small-bore pipes in the nuclear island, with the acceptance rate of radiographic testing consistently maintained above 99% on the first attempt, demonstrating collaborative efforts to overcome challenges and solid foundation for project advancement. The information platform for critical and sensitive components of the Company has been deployed across over 800 major equipment items, mitigating multiple risks of potential reactor shutdowns and significant equipment damage, thereby enhancing unit safety.
We continued to refine the full lifecycle management of research projects to accelerate the commercialization of technological achievements. The chief expert mechanism was optimized with greater incentives and more substantive measures, which steadily improved the system led by top technological talents. We strengthened incentives for technological innovation, with policy support provided for the development of national-level innovation platforms and the recruitment of high-caliber, highly-skilled, and urgently-needed personnel.
In 2025, we submitted 2,031 patent applications in total, of which 1,196 were granted patents. The introduction and application of these scientific research results are to be elaborated in the section headed “Intellectual Capital” of this Annual Report and our 2025 ESG Report.
---
# President’s Review
## Cost Reduction and Efficiency Enhancement
In 2025, we deepened our lean cost management initiatives. Through internal and external benchmarking, we thoroughly analyzed key cost drivers and formulated systematic cost reduction strategies. We also continued to optimize performance evaluation for each unit while sharing best practices in cost management. On the premise of ensuring production safety and quality, we tightened our grip on various non-essential and non-urgent expenses, and kept our costs within a reasonable range, through which a decrease in cost per kilowatt-hour for three consecutive years was achieved. While controlling risks, we seized market opportunities by issuing our A-share convertible bonds for the first time, securing support from the national “Special Bonds for Stabilizing Growth and Expanding Investment” for nuclear power project construction. We also implemented foreign exchange hedging management, which achieved an appropriate reduction in finance costs and attained the goal of exchange rate risk preservation.
## Future Outlook
In 2026, China is expected to sustain stable growth in economic operations. According to the CEC forecast, the electricity consumption in China is expected to increase by 5% to 6%. The national power demand and supply will remain balanced in general, albeit with a tight balance during certain periods and in specific regions. Ensuring the stable operation of all nuclear power generating units in operation is always our top priority. Huizhou Unit 1 and Unit 2, as well as Cangnan Unit 1 will commence commercial operation in 2026. We will pull out all the stops to ensure the high-quality commencement of our new nuclear power generating units. At the same time, we will continue to make early preparations for new nuclear power projects, and strive to obtain approval and start construction of more projects.
---
In 2026, we will continue to have 10 nuclear power generating units participating in market trading in Guangdong Province, and the trading volume in the market will exceed 31.2 billion Kwh. The requirement for NPPs to pay variable cost compensation has been abolished. We actively planned and developed customers through various channels, and have almost completed the signing of annual trading electricity sales contracts by the end of 2025. We are currently actively participating in monthly bidding and spot trading in the province. In other provinces and regions, the on-grid power generation of the four nuclear power generating units of Fangchenggang Nuclear, four nuclear power generating units of Ningde Nuclear and six nuclear power generating units of Hongyanhe Nuclear will all participate in market trading. The Company will leverage the roles of nuclear power as a key component of the new type of energy system, highlighting its attributes as a baseload power source and a low-carbon energy. We will maintain proactive communication with the national government and relevant provincial authorities to advocate for the accelerated introduction of market-based trading policies tailored to the characteristics of nuclear power. This approach will ensure the sustainable development of the nuclear power industry and support the establishment of a scientific and well-structured unified national power market. Meanwhile, we will also continue to increase investment in new technology R&D, strengthen our commercialization of scientific and technological outcomes, and continuously optimize the operation and maintenance costs of our nuclear power generating units and project construction costs, striving to promote improvement in both quality and efficiency.
Looking ahead, we will remain steadfast in our goal of becoming a world-class nuclear energy enterprise. We will focus on consolidating our foundation, enhancing quality and efficiency, and driving innovative development. Adhering to the principle of pursuing progress while ensuring stability, we will strive to outperform the market. Together with all our partners, we will work diligently to make new contributions in this inaugural year of China's "15th Five-Year Plan".
Pang Songtao
President
March 25, 2026
---
# Shareholder Value
The Board, the management and employees of the Company are responsible for and obliged to create value for the shareholders. As such, the Company will continue to maintain stable operational development and steady growth, while it will take an active and transparent approach with integrity, stay in close contact with its shareholders and safeguard the shareholders’ trust and confidence on the Company with rewards to them.
As at December 31, 2025, the Company had 243,258 registered shareholders (including 240,425 holders of A shares and 2,833 holders of H shares), but the actual number of investors would be much greater if one takes into account individuals and institutions holding equity interests in the Company indirectly through intermediaries such as nominees, investment funds, the Hong Kong Central Clearing and Settlement System (CCASS), the Shanghai-Hong Kong Stock Connect, and the Shenzhen-Hong Kong Stock Connect.
## Dividend Distribution
When considering the dividend distribution ratio in the future, we will take into consideration the business performance of the Company for the year, the future development strategies of the Company and other factors, provided that it shall not be lower than 30% of the net profit attributable to shareholders of the Company for the year. The Board and management of the Company have full confidence in the development prospects of nuclear power and the Company’s stable operation, and the Dividend Distribution Plan for the Coming Five Years (2021-2025) (《未來五年(2021 年-2025 年)股東分紅回報規劃》) of the Company was approved at the 2020 annual general meeting convened on May 26, 2021. On the premise of no major changes in the business, operating results and financial position of the Group, subject to the approval at the general meeting in the relevant year, the Company will maintain a reasonable increase in the dividend distribution ratio from 2021 to 2025 based on the dividend ratio in 2020 (42.25%).
The final dividend for the year ended December 31, 2024 was RMB0.095 (tax inclusive) per share and was paid by the Company on July 3, 2025. The dividend distribution ratio of the Company for 2024 was 44.36% of the net profit attributable to the shareholders of the Company. The total annual dividends paid by the Company since its listing in 2014 reached RMB36,760.5 million.
---
The Board has proposed to declare a final cash dividend of RMB0.086 (tax inclusive) per share for the year from January 1, 2025 to December 31, 2025 to all shareholders of the Company. Based on the total ordinary share capital of 50,498,611,100 shares as of December 31, 2025, the proposed total cash dividend amounts to RMB4,342,880,554.60 (tax inclusive), and the dividend distribution ratio of the final dividend for 2025 (total dividends/net profit attributable to shareholders of the parent company*100%) is approximately 44.47%. As the A-share convertible bonds issued by the Company are in the conversion period, the actual total cash dividend to be distributed will be finalized based on the sum of the number of shares held by shareholders as at the record date of the dividend payment for A shares (i.e., the registration date of equity distribution for A shares) and the number of shares held by shareholders as at the record date of the dividend payment for H shares (i.e., June 1, 2026), while the cash dividend to be distributed per share will remain unchanged. All dividends for 2025 will be distributed after being approved by our shareholders at the 2025 annual general meeting of the Company and is expected to be distributed around July 10, 2026. To the best of the Company’s knowledge, as at the date of this report, none of the shareholders has waived or agreed to waive any dividend.
---
# Shareholder Value
## Dividend Distribution per Year since the Listing
| Year | Dividend per share (Unit: RMB (tax inclusive)) | Total dividends (Unit: RMB million) | Dividend distribution ratio |
| :--- | :--- | :--- | :--- |
| 2014 | 0.0025 | 113.62 | - |
| 2015 | 0.042 | 1,908.85 | 28.71% |
| 2016 | 0.051 | 2,317.89 | 31.47% |
| 2017 | 0.068 | 3,090.52 | 32.31% |
| 2018 | 0.072 | 3,272.31 | 37.60% |
| 2019 | 0.076 | 3,837.87 | 40.55% |
| 2020 | 0.080 | 4,039.89 | 42.25% |
| 2021 | 0.084 | 4,241.88 | 43.44% |
| 2022 | 0.087 | 4,393.38 | 44.09% |
| 2023 | 0.094 | 4,746.87 | 44.26% |
| 2024 | 0.095 | 4,797.37 | 44.36% |
| 2025 | 0.086 | 4,342.88 | 44.47% |
**Note:** As the A-share convertible bonds of the Company are in the conversion period, the actual total dividend to be distributed and the dividend distribution ratio for 2025 will be finalized based on the total number of shares held by shareholders registered on the record date of equity distribution.
---
# Shareholders' Diary 2026
**January**
- Announcement of 2025 fourth quarter operation briefings
- 2025 fourth quarter operation teleconference
- Commencement of share conversion for A-share convertible bonds
**March**
- Announcement of 2025 A share annual report, H share annual results announcement and ESG report
- 2025 annual results promotion
**April**
- Announcement of 2025 H share annual report
- Announcement of 2026 first quarter operation briefings and 2026 A share first quarterly report
- 2026 first quarter operation teleconference
**May**
- 2025 annual general meeting
**July**
- Announcement of 2026 second quarter operation briefings
- 2026 second quarter operation teleconference
- Distribution of 2025 final dividend
**August**
- Announcement of 2026 A share interim report, H share interim results announcement and H share interim report
- 2026 interim results promotion
**October**
- Announcement of 2026 third quarter operation briefings and A share third quarterly report
- 2026 third quarter operation teleconference
Note: Any changes to the above dates will be announced on the website of the Company.
---
# FINANCE, ASSETS AND INVESTMENTS
- 30 Financial Performance and Analysis
- 34 Assets and Investments
---
This page contains no text, headings, tables, or financial data to extract. It consists entirely of a photograph and decorative elements, which are to be ignored according to the instructions.
---
# Financial Performance and Analysis
Our investment and operational strategies affect our business performance, which in turn translates into the financial data combined in our financial statements.
## KEY FINANCIAL INDICATORS
| Category | Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| **Indicators of profitability** | EBITDA margin (%)(1) | 48.9 | 51.5 |
| | Net profit margin (%)(2) | 19.5 | 22.1 |
| **Indicators of investment returns** | Return on equity (excluding non-controlling interests) (%)(3) | 7.8 | 8.7 |
| | Return on total assets (%)(4) | 4.8 | 5.9 |
| **Indicators of solvency** | Asset-liability ratio (%)(5) | 65.2 | 61.2 |
| | Debt to equity ratio (%)(6) | 142.6 | 119.5 |
| | Interest coverage(7) | 3.5 | 3.7 |
**Notes:**
1. (1) EBITDA margin = (total profit + interest expenses recognized in profit or loss + depreciation and amortization)/operating revenue * 100%
2. (2) Net profit margin = net profit/operating revenue * 100%
3. (3) Return on equity (excluding non-controlling interests) = net profit attributable to shareholders of the parent company/average equity attributable to shareholders of the parent company (the arithmetic mean of the opening and closing balances) * 100%
4. (4) Return on total assets = (total profit + interest expenses recognized in profit or loss)/average total assets (the arithmetic mean of the opening and closing balances) * 100%
5. (5) Asset-liability ratio = total liabilities/total assets * 100%
6. (6) Debt to equity ratio = net debt (the total amount of bank and other borrowings – cash and cash equivalents – other deposits over three months)/total shareholders’ equity * 100%
7. (7) Interest coverage = (total profit + interest expenses recognized in profit or loss)/(interest expenses recognized in profit or loss + interest expenses capitalized)
---
# Financial Results and Analysis
**For the year ended December 31,**
| Item | 2025 RMB’000 | 2024 (Restated) RMB’000 | Fluctuations increase/ (decrease) RMB’000 | Percentage change increase/ (decrease) % |
| :--- | :--- | :--- | :--- | :--- |
| Operating revenue | 75,696,558.97 | 78,944,669.62 | (3,248,110.65) | (4.1) |
| Operating costs | 51,478,963.73 | 49,395,836.08 | 2,083,127.65 | 4.2 |
| Finance costs¹ | 4,523,422.01 | 5,133,290.99 | (609,868.98) | (11.9) |
| Other gains² | 2,041,530.91 | 1,696,195.10 | 345,335.82 | 20.4 |
| Investment income³ | 2,353,145.46 | 1,932,890.84 | 420,254.63 | 21.7 |
| Including: Income from investment in associates and joint ventures | 2,263,089.56 | 1,835,884.75 | 427,204.81 | 23.3 |
| Non-recurring gains or losses⁴ | 726,139.40 | 63,619.40 | 662,520.00 | 1,041.4 |
| Net profit attributable to shareholders of the parent company | 9,765,358.96 | 10,838,120.42 | (1,072,761.46) | (9.9) |
| Net profit attributable to shareholders of the parent company (excluding the effects of non-recurring gains or losses) | 9,113,038.28 | 10,737,071.20 | (1,624,032.92) | (15.1) |
**Notes:**
1. The decrease in finance costs was primarily due to the year-on-year decrease in interest expenses as a result of the decrease in financing costs.
2. The increase in other gains was primarily due to the year-on-year increase in the VAT refunds received as affected by the progress of VAT refunds.
3. The increase in investment income was primarily due to the year-on-year increase in the investment income from an associate Hongyanhe Nuclear.
4. The increase in non-recurring gains or losses was primarily due to the combined effect of the year-on-year increase in the government grants related to R&D projects carried forward by subsidiaries and the refund of late tax payment penalties.
---
# Financial Performance and Analysis
## Revenue from Operations
For the year ended December 31,
| | 2025 (RMB’000) | 2024 (Restated) (RMB’000) | Fluctuations increase/(decrease) (RMB’000) | Percentage change increase/(decrease) (%) |
| :--- | :--- | :--- | :--- | :--- |
| Revenue from principal business operations | 75,478,992.35 | 78,756,472.17 | (3,277,479.82) | (4.2) |
| Including: Sales of electricity¹ | 61,757,114.16 | 65,932,311.94 | (4,175,197.78) | (6.3) |
| Construction, installation and design services | 11,341,026.49 | 10,838,605.51 | 502,420.98 | 4.6 |
| Revenue from other business operations² | 217,566.62 | 188,197.45 | 29,369.17 | 15.6 |
| **Total revenue from business operations** | **75,696,558.97** | **78,944,669.62** | **(3,248,110.65)** | **(4.1)** |
**Notes:**
1. The decrease in revenue from sales of electricity was primarily due to the year-on-year decrease in the market-based transaction tariffs.
2. The increase in revenue from other business operations was primarily due to the increase in the business volume of the provision of housing rental and technical support services.
## Cost of Operations
For the year ended December 31,
| | 2025 (RMB’000) | 2024 (Restated) (RMB’000) | Fluctuations increase/(decrease) (RMB’000) | Percentage change increase/(decrease) (%) |
| :--- | :--- | :--- | :--- | :--- |
| Cost of principal business operations | 51,329,591.85 | 49,250,853.63 | 2,078,738.22 | 4.2 |
| Including: Cost of sales of electricity | 38,602,099.90 | 37,186,346.04 | 1,415,753.86 | 3.8 |
| Of which: Cost of nuclear fuel | 9,656,501.61 | 9,522,942.27 | 133,559.34 | 1.4 |
| Depreciation of fixed assets | 11,728,886.33 | 11,662,074.40 | 66,811.93 | 0.6 |
| Provision for spent fuel management¹ | 4,378,192.53 | 4,059,664.96 | 318,527.57 | 7.8 |
| Construction, installation and design services | 11,091,718.68 | 10,668,229.63 | 423,489.05 | 4.0 |
| Other costs of business operations | 149,371.88 | 144,982.45 | 4,389.43 | 3.0 |
| **Total cost of operations** | **51,478,963.73** | **49,395,836.08** | **2,083,127.65** | **4.2** |
**Note:**
1. The increase in provision for spent fuel management was primarily due to the commencement of provision and payment for spent fuel management as Yangjiang Unit 6 and Taishan Unit 2 had commenced commercial operation for five years.
---
# Financial Position
The bank and other borrowings, receivables, payables, inventories, fixed assets and intangible assets of the Company are shown in the table below. Details of the financial position are set out in the notes to the consolidated financial statements.
| | December 31, 2025 RMB'000 | December 31, 2024 (Restated) RMB'000 | Fluctuations increase/(decrease) RMB'000 | Percentage change increase/(decrease) % |
| :--- | :---: | :---: | :---: | :---: |
| Bank and other borrowings⁽¹⁾ ⁽¹⁾ Bank and other borrowings comprise short-term loans, short-term bonds payable, long-term loans, bonds payable, and long-term loans and bonds payable due within one year. | 271,943,162.92 | 234,997,382.12 | 36,945,780.80 | 15.7 |
| Receivables⁽²⁾ ⁽²⁾ Receivables comprise bills receivable, accounts receivable, prepayments, contract assets and other receivables. | 31,724,806.69 | 33,033,581.43 | (1,308,774.74) | (4.0) |
| Payables⁽³⁾ ⁽³⁾ Payables comprise bills payable, accounts payable, receipts in advance, contract liabilities and other payables. | 42,870,887.59 | 38,798,539.42 | 4,072,348.17 | 10.5 |
| Inventories⁽⁴⁾ ⁽⁴⁾ The increase in inventories was primarily due to the increase in the nuclear fuel components and spare parts received. | 22,421,891.55 | 20,350,163.78 | 2,071,727.77 | 10.2 |
| Fixed assets and intangible assets | 261,057,468.68 | 269,711,444.86 | (8,653,976.18) | (3.2) |
# Analysis of Cash Usage
In 2025, the Company’s net cash inflows from operating activities decreased as compared with 2024 (restated), mainly due to the year-on-year decrease in the revenue from sales of electricity and the year-on-year increase in the costs of power generation of subsidiaries; the net cash inflows from financing activities increased as compared with 2024 (restated), mainly due to the year-on-year increase in external borrowings obtained by the Company.
| For the year ended December 31, | 2025 RMB'000 | 2024 (Restated) RMB'000 | Fluctuations increase/(decrease) RMB'000 | Percentage change increase/(decrease) % |
| :--- | :---: | :---: | :---: | :---: |
| Net cash inflows from operating activities | 29,970,529.39 | 37,505,728.04 | (7,535,198.65) | (20.1) |
| Net cash outflows from investment activities | 32,335,548.58 | 32,448,293.27 | (112,744.69) | (0.3) |
| Net cash inflows from financing activities | 6,676,894.75 | (6,656,434.21) | 13,333,328.96 | 200.3 |
---
# Assets and Investments
The Group was mainly engaged in the investment in construction of nuclear power generating units, technical improvement in the NPPs in operation, and R&D of technologies related to nuclear power for the year ended December 31, 2025.
## Investment in Fixed Assets
For the year ended December 31, 2025, the Group's investment in fixed assets amounted to approximately RMB35,983.2 million, representing an increase of approximately RMB2,309.7 million or 6.9% from approximately RMB33,673.6 million in 2024 (restated).
## Investment in Equity
For the year ended December 31, 2025, the Group invested a total of approximately RMB950.5 million in joint ventures and associates, which was attributed to the additional investment in Ningde Second Nuclear and Huizhou Zhongdong Energy Storage and Power Generation Co., Ltd. (惠州中洞蓄能發電有限公司) based on the respective shareholding therein.
## Major Acquisition and Disposal
In January 2025, the Company acquired 100% equity interest in Taishan Second Nuclear, which was formerly held by CGNPC, for a consideration of approximately RMB1,203.9 million, with a revaluation gain of approximately RMB3.9 million. Taishan Second Nuclear became a wholly-owned subsidiary of the Company.
In October 2025, the Company acquired 82% equity interest in Huizhou Nuclear, 100% equity interest in Huizhou Second Nuclear, 100% equity interest in Huizhou Third Nuclear, and 100% equity interest in Zhanjiang Nuclear, which were originally held by CGNPC, for a consideration of approximately RMB9,375.4 million. The revaluation gain in the total equity interest of Huizhou Nuclear and Huizhou Second Nuclear was approximately RMB1,486.5 million and approximately RMB126.0 million respectively. Huizhou Third Nuclear and Zhanjiang Nuclear had no assets, liabilities, revenue or profit. Huizhou Nuclear, Huizhou Second Nuclear, Huizhou Third Nuclear and Zhanjiang Nuclear became subsidiaries of the Company.
As of December 31, 2025, save as the aforesaid matters, the Group had no material acquisition or disposal.
---
# Use of Proceeds
In July 2025, the Company issued 49.0 million A-share convertible bonds to non-specific investors on the SZSE, each with a nominal value of RMB100, raising total proceeds of RMB4,900.0 million. The net proceeds raised after deducting issuance expenses amounted to RMB4,897.8 million, all of which were used to replace the self-raised funds already invested in the investment project (Guangdong Lufeng Nuclear Power Station Unit 5 and Unit 6 Project).
As of December 31, 2025, the Company had used all of the proceeds from the global offering of H shares in December 2014, the proceeds from the initial public offering (A shares) on the SZSE in August 2019, and the proceeds from the A-share convertible bonds issued to non-specific investors on the SZSE in July 2025.
For the year ended December 31, 2025, save as the aforesaid matters, the Group did not have other matters related to the use of proceeds.
# Contingencies
## External Guarantees
The Group confirmed that, for the year ended December 31, 2025, the Group had not provided any external guarantee.
## Assets with Restricted Ownership
As of December 31, 2025, the Group's assets pledged to banks and with restricted ownership due to other reasons amounted to approximately RMB15,949.7 million in carrying value. As of December 31, 2024, the Group's assets pledged to banks and with restricted ownership due to other reasons amounted to approximately RMB17,616.9 million (restated) in carrying value.
As of December 31, 2025 and December 31, 2024, the electricity tariff collection rights of Lingdong Nuclear, Fangchenggang Nuclear, Ningde Nuclear and Taishan Nuclear were pledged to secure the banking facilities and loans from banks to these entities.
## Legal Proceedings
For the year ended December 31, 2025, there was no significant litigation against the Group, and the Board was not aware of any pending or threatened litigation against the Group which had or could have a material and adverse effect on the financial conditions or operations of the Group.
# Investment Direction
Based on the strategies and business development needs of the Company, the Company will finance the construction of NPPs under construction according to its investment schedules, continue to fund the technological improvement in NPPs in operation to maintain and enhance operation, make continuous investment in the innovation of technologies, and fund the acquisitions of contingent assets in 2026. The Company will carry out relevant investment activities when appropriate, thereby laying a solid foundation for the Company's future development.
---
# BUSINESS PERFORMANCE AND OUTLOOK
- 38 Industry Overview
- 40 Business Performance and Analysis
- 54 Future Outlook
---
The provided image is a photograph and does not contain any text, headings, lists, or tables to be converted into markdown according to the specified rules.
---
# Industry Overview
On September 24, 2025, President Xi Jinping announced at the United Nations Climate Change Summit a new round of China’s Nationally Determined Contributions (NDC) targets, namely China’s 2035 NDC targets. This announcement marked the first time China presented a package of climate goals for the post-peak carbon period, targeting a net reduction in economy-wide greenhouse gas emissions. It laid out a systematic action plan covering multi-dimensional indicators such as energy and industrial transformation, as well as innovative policy mechanisms. On October 23, 2025, the Fourth Plenary Session of the 20th CPC Central Committee adopted the Recommendations of the Central Committee of the Communist Party of China for Formulating the 15th Five-Year Plan for National Economic and Social Development, which calls for “accelerating the comprehensive green transition of the economy and society”, “speeding up the establishment of a new energy system”, “pursuing the concurrent development of wind, solar, hydro, nuclear and other energy sources” and “actively and prudently working towards and achieving carbon peaking”. On November 10, 2025, the 2035 China Nationally Determined Contribution Report issued by the Ministry of Ecology and Environment highlighted in the policies and actions for fully implementing NDCs that “active, safe and orderly development of nuclear power” is a key part of China’s strategy to “steadily and orderly advance its energy transition” and to “achieve substantive progress in building a new electricity system and a new energy system by 2035”. On April 27, 2025, five nuclear power projects, including Fangchenggang Phase III Project and Taishan Phase II Project, were approved by the State. This marked the fourth consecutive year that the State had approved five nuclear power projects.
On December 15, 2025, the National Energy Administration convened the 2026 National Energy Work Conference, mentioning that in 2025, China had “accelerated its green and low-carbon energy transition”, with “major hydropower and nuclear power projects advancing rapidly and steady progress in building the new electricity system”; for 2026, the focus would be on “firmly pushing forward the green and low-carbon transformation of energy”, “developing nuclear power actively, safely and in an orderly manner”, “accelerating self-reliance and innovation in energy technology” and “planning ahead for future energy sectors such as hydrogen and nuclear energy”. We believe the current and upcoming periods are crucial for China in establishing its new energy system and power system. As China enhances its energy security and moves toward achieving carbon peaking before 2030, the positive trajectory of the nuclear energy sector is strengthening. The sector remains in a strategically critical period for development, with further support expected for its active, safe and orderly growth, and significant opportunities still lie ahead.
---
According to the data released by the National Bureau of Statistics on January 19, 2026, the gross domestic product in 2025 increased by 5.0% year-on-year. China’s economy forged ahead against headwinds, in pursuit of innovation-driven and high-quality development, with new achievements made in high-quality development. In 2025, the national average utilization hours of nuclear power generating units were 7,809 hours, representing a year-on-year increase of 126 hours.
| Type of energy | Ratio of installed capacity by type of energy (%) 2025 | Ratio of installed capacity by type of energy (%) 2024 | Ratio of generation capacity by type of energy (%) 2025 | Ratio of generation capacity by type of energy (%) 2024 | Average utilization hours (hours) 2025 | Average utilization hours (hours) 2024 |
| :--- | :---: | :---: | :---: | :---: | :---: | :---: |
| Nuclear power | 1.6 | 1.8 | 4.6 | 4.5 | 7,809 | 7,683 |
| Thermal power | 39.6 | 43.1 | 59.3 | 62.6 | 4,147 | 4,400 |
| Hydropower | 11.5 | 13.0 | 14.0 | 14.4 | 3,367 | 3,349 |
| Wind power | 16.4 | 15.5 | 10.8 | 10.1 | 1,979 | 2,127 |
| Solar power | 30.9 | 26.5 | 11.3 | 8.5 | 1,088 | 1,211 |
Note: Data from the 2025 National Power Industry Statistics Overview (《2025年全國電力工業統計快報》) of the CEC. The data on the installed capacity of power generation and the proportion of power generation are on a full consolidated basis. The average utilization hours are the utilization hours of power generation facilities in NPPs of 6,000 kilowatts and above.
In the second half of 2025, the State focused on advancing tasks such as expanding provincial electricity markets to near-universal coverage, boosting cross-provincial and cross-regional electricity trading, and accelerating the rollout of foundational electricity market frameworks. Relevant policy documents, including the Cross-Grid Operation Zone Regular Trading Mechanism Plan (《跨電網經營區常態化交易機制方案》) and the Basic Rules for Medium-and-Long-Term Electricity Markets (《電力中長期市場基本規則》), were issued successively. These efforts led to the continuous operation of spot electricity markets in 28 provinces and marked the initial establishment of a nationwide unified electricity market. According to statistics of the CEC, the share of electricity traded in the market accounted for 64.0% of total national electricity consumption in 2025, representing an increase of 1.3 percentage points year-on-year, of which medium and long-term electricity traded accounted for approximately 95.7% of the total market-traded electricity volume, while spot electricity transactions accounted for approximately 4.3%. Cross-provincial and cross-regional electricity trading volume increased by 11.6% year-on-year. On February 11, 2026, the General Office of the State Council issued the Implementation Opinions on Improving the National Unified Power Market System, proposing to basically complete the national unified power market system by 2030 and fully complete the national unified power market system by 2035. In response to these market changes, we will stay abreast of policy developments, conduct thorough assessments of their implications, and maintain close communication with national and local authorities. We will also advocate for the introduction of long-term policies enabling nuclear power to participate in market trading, stay attentive to market developments to anticipate future trends, strengthen collaboration with grid operators and related enterprises, and strive for more favorable market tariffs and a larger market share.
---
# Business Performance and Analysis
As at the end of 2025, we managed 28 nuclear power generating units in operation and 20 nuclear power generating units under construction (including four units which were entrusted to the Company by the controlling shareholder of the Company for management). In February 2025, Lufeng Unit 1 fully commenced construction. In June 2025, Huizhou Unit 3 fully commenced construction. In November 2025, Zhaoyuan Unit 1 and Cangnan Unit 3 fully commenced construction. In December 2025, Ningde Unit 6 and Lufeng Unit 2 fully commenced construction. In April 2025, Taishan Phase II project and Fangchenggang Phase III project received approval.
As of December 31, 2025, the number and capacity of nuclear power generating units in operation and nuclear power generating units under construction managed by us are as follows:
| Item | Unit | As of December 31, 2025 | As of December 31, 2024 | Growth/(decline) rate |
| :--- | :--- | :---: | :---: | :---: |
| **Nuclear power generating units in operation** | Number | 28 | 28 | 0.00% |
| | Capacity | 31,838MW | 31,798MW | 0.13% |
| **Nuclear power generating units under construction** | Number | 16 | 8 | 100.00% |
| | Capacity | 19,376MW | 9,738MW | 98.97% |
| **Nuclear power generating units under construction which were entrusted to the Company by the controlling shareholder for management** | Number | 4 | 8 | (50.00)% |
| | Capacity | 4,846MW | 9,668MW | (49.88)% |
---
We will introduce and analyze the Company’s business performance in 2025 in six aspects, namely safety management, nuclear power generating units in operation, nuclear power generating units under construction, sales of electricity, SCS (standardization, centralization and specialization) management and lean management and comprehensive use of nuclear energy.
## Safety Management
Safety is crucial to any company. We highly value safety and always place safety at our top priority. We always adhere to the concept of “Nuclear Safety is Our Overriding Priority” and our basic principles of “Safety First, Quality Foremost, Pursuit of Excellence”, and strive to apply them to various stages of the design, construction, operation and decommissioning of the NPPs. We believe that maintaining nuclear power safety is a great responsibility to the country, society, shareholders, employees and other stakeholders. Only with safety can our units in operation provide the society with stable and reliable power and our units under construction achieve high quality production, and thus we can achieve constant improvement in our overall operating results.
We continue to improve our safety management system and optimize our management approach. Based on our experience in nuclear power operation over the years, we have established a mature safety management system. We continue to launch regular, standardized and long-term activities such as “On-site Management”, “Upholding Compliance and Fighting against Non-compliance”, “Precautionary Education on Nuclear Safety”, “Bringing Nuclear Safety Culture into our Teams” and “Safe Production with Standardized Construction” so as to continuously strengthen the nuclear safety culture awareness among all employees. We also roll out targeted initiatives based on our key priorities for the year. In 2025, the Company diligently implemented key nuclear safety and safety management initiatives across both internal and external operations, and maintained strict compliance with nuclear safety regulatory requirements while establishing a more robust nuclear safety accountability framework and enhancing the effectiveness of its nuclear safety management and supervision systems. As led by the Chairman and the senior management of the Company, the Company continued to conduct comprehensive safety inspections at the nuclear power sites in operation and under construction managed by the Company, and carried out thorough risk identification and hazard rectification to identify and address the issues rooted in the management system and continued to enhance the efficiency of comprehensive safety inspections. This process continuously enhanced the effectiveness of safety inspections and strengthened senior management’s awareness of nuclear safety principles and their responsibility for safe production across all units. Building on the existing ISO9001 certifications at its NPPs and specialized enterprises, the Company continued to carry out quantitative assessments to evaluate the effectiveness of its quality assurance systems. Drawing on feedback from previous years, the Company further refined its inspection and evaluation methodologies and standards. For the third consecutive year, we continued to conduct inspections and evaluations across all NPPs and specialized companies under our management. By identifying, documenting and promoting best practices in quality assurance, we facilitated the ongoing and self-driven improvements at all NPPs and specialized companies in the effectiveness of their quality assurance systems. We focused on advancing the standardization of safe production under the guidance of the “Five Initiatives (五化)” (modularization, mechanization, digitalization, automation and intrinsic safety). We organized various departments, including construction, operations and management, to develop and implement relevant plans, and selected and promoted the application of exemplary cases of our “Five Initiatives”. We adopted these comprehensive technical, engineering, management and other measures to further strengthen the intrinsic safety of facilities and the safety of employees’ behaviors. We further improved the reward mechanism for identifying and reporting potential hazards to encourage frontline personnel to actively report safety risks, which fostered a robust safety culture focused on hazard prevention and mitigation.
---
# Business Performance and Analysis
At the same time, we continue to promote safety supervision as well as dynamic and transparent experience feedback. We organize regular emergency drills under different scenarios to ensure the effective operation of our safety management system. In 2025, we held 577 nuclear emergency drills of various types, thereby continuously enhancing the emergency response capability of the Group’s nuclear emergency units.
According to the INES, the NPPs we operated and managed had maintained our all-time good safety record of no nuclear event at level 2^Note or above in 2025. ^Note: Nuclear incidents are classified into seven levels in the INES according to their impact on (i) people and the environment, (ii) radiological barriers and control, and (iii) defense-in-depth. Level 1 to Level 3 are termed “incidents”, while Level 4 to Level 7 are termed “accidents”. Events below such scale are deviations without safety significance.
For the related activities of safety management, please refer to the 2025 environmental, social and governance report of the Company.
## Nuclear Power Generating Units in Operation
In 2025, all nuclear power generating units in operation managed by us maintained safe and stable operation, with a total annual on-grid power generation of 232,648 GWh, representing an increase of 2.36 % as compared with 2024.
| Name of NPP | On-grid power generation from January to December 2025 (GWh) | On-grid power generation from January to December 2024 (GWh) | Change rate for the corresponding period % |
| :--- | :---: | :---: | :---: |
| **From subsidiaries** | | | |
| Daya Bay NPP | 15,851 | 14,206 | 11.58 |
| Ling’ao NPP | 15,841 | 15,424 | 2.70 |
| Lingdong NPP | 16,191 | 15,915 | 1.73 |
| Yangjiang NPP | 49,876 | 50,075 | -0.40 |
| Taishan NPP | 21,976 | 22,770 | -3.49 |
| Fangchenggang NPP | 30,867 | 27,900 | 10.64 |
| Ningde NPP | 32,897 | 32,723 | 0.53 |
| **Subsidiaries, total** | **183,498** | **179,012** | **2.51** |
| **From associates** | | | |
| Hongyanhe NPP | 49,150 | 48,271 | 1.82 |
| **Subsidiaries and associates, total** | **232,648** | **227,284** | **2.36** |
---
**Daya Bay NPP:** The total duration of the refuelling outage from January to December 2025 was shorter as compared with 2024. As recognized by the Guangdong Provincial Development and Reform Commission and approved by the National Energy Administration Southern Regulatory Authority, GNPJVC was granted a new electricity business license in December 2025. The installed capacity of Daya Bay Unit 1 changed from 984 MW to 1,026 MW and the installed capacity of Daya Bay Nuclear Power Station increased to 2,052 MW.
**Ling’ao NPP:** The total duration of the refuelling outage from January to December 2025 was shorter as compared with 2024.
**Lingdong NPP:** The total duration of the refuelling outage from January to December 2025 was shorter as compared with 2024.
**Yangjiang NPP:** The total duration of the refuelling outage from January to December 2025 remained basically the same as that in 2024.
**Taishan NPP:** The total duration of the refuelling outage from January to December 2025 was longer as compared with 2024.
**Fangchenggang NPP:** Fangchenggang Unit 4 commenced commercial operation on May 25, 2024.
**Ningde NPP:** The total duration of the refuelling outage from January to December 2025 was shorter as compared with 2024.
**Hongyanhe NPP:** The total duration of the refuelling outage from January to December 2025 was shorter as compared with 2024.
## Operation Performance
Capacity factor, load factor and utilization hours are the three indicators used to evaluate the utilization of nuclear power generating units. They are mainly affected by the effects of refuelling outages for the generating units. Meanwhile, load factor and utilization hours of nuclear power generating units are also affected by load reduction and being put on standby due to transmission line maintenance or as a result of demand and supply conditions in the electricity market.
In 2025, we had 28 nuclear power generating units in operation, with an average capacity factor of 92.65%, an average load factor of 88.66%, and average utilization hours of 7,767 hours, as compared with 91.91%, 87.77% and 7,710 hours of these three indicators for the 28 nuclear power generating units in operation in 2024. The details of the operation performance of generating units we operated and managed are as follows:
---
# Business Performance and Analysis
| Nuclear Power Generating Unit | Capacity factor (%) 2025 | Capacity factor (%) 2024 | Load factor (%) 2025 | Load factor (%) 2024 | Utilization hours (hours) 2025 | Utilization hours (hours) 2024 |
| :--- | :---: | :---: | :---: | :---: | :---: | :---: |
| **From subsidiaries** | | | | | | |
| Daya Bay Unit 1 | 93.91 | 70.16 | 96.36 | 71.82 | 8,442 | 6,309 |
| Daya Bay Unit 2 | 91.48 | 97.07 | 90.91 | 96.04 | 7,964 | 8,436 |
| Ling'ao Unit 1 | 94.07 | 96.72 | 91.52 | 95.39 | 8,018 | 8,379 |
| Ling'ao Unit 2 | 99.99 | 93.75 | 99.08 | 89.72 | 8,679 | 7,881 |
| Lingdong Unit 1 | 92.99 | 90.82 | 91.11 | 89.45 | 7,981 | 7,857 |
| Lingdong Unit 2 | 93.38 | 90.25 | 89.57 | 87.72 | 7,847 | 7,705 |
| Yangjiang Unit 1 | 94.45 | 87.28 | 92.93 | 86.78 | 8,140 | 7,623 |
| Yangjiang Unit 2 | 89.61 | 100.00 | 88.18 | 98.05 | 7,725 | 8,613 |
| Yangjiang Unit 3 | 99.99 | 92.89 | 98.66 | 91.01 | 8,642 | 7,994 |
| Yangjiang Unit 4 | 90.49 | 91.88 | 88.25 | 90.90 | 7,731 | 7,985 |
| Yangjiang Unit 5 | 92.09 | 99.99 | 89.85 | 100.16 | 7,871 | 8,798 |
| Yangjiang Unit 6 | 99.99 | 94.14 | 99.23 | 91.02 | 8,693 | 7,995 |
| Taishan Unit 1 | 68.80 | 90.50 | 67.93 | 88.54 | 5,951 | 7,777 |
| Taishan Unit 2 | 86.61 | 71.13 | 85.35 | 69.87 | 7,477 | 6,137 |
| Fangchenggang Unit 1 | 99.71 | 94.40 | 90.36 | 85.63 | 7,916 | 7,522 |
| Fangchenggang Unit 2 | 93.89 | 99.98 | 86.68 | 90.93 | 7,593 | 7,987 |
| Fangchenggang Unit 3 | 84.06 | 77.72 | 79.39 | 71.25 | 6,955 | 6,259 |
| Fangchenggang Unit 4 | 81.10 | 99.97 | 75.41 | 88.56 | 6,606 | 7,779 |
| Ningde Unit 1 | 99.99 | 94.25 | 96.13 | 92.46 | 8,421 | 8,122 |
| Ningde Unit 2 | 93.82 | 84.07 | 90.14 | 83.09 | 7,896 | 7,299 |
| Ningde Unit 3 | 89.59 | 95.40 | 88.30 | 91.96 | 7,735 | 8,078 |
| Ningde Unit 4 | 93.18 | 99.93 | 92.58 | 96.76 | 8,110 | 8,499 |
| **Average of subsidiaries** | **91.96** | **91.47** | **88.48** | **87.97** | **7,751** | **7,727** |
| **From associates** | | | | | | |
| Hongyanhe Unit 1 | 91.31 | 96.35 | 85.64 | 84.97 | 7,502 | 7,464 |
| Hongyanhe Unit 2 | 100.00 | 88.70 | 94.26 | 82.70 | 8,257 | 7,264 |
| Hongyanhe Unit 3 | 99.53 | 92.14 | 88.49 | 85.22 | 7,752 | 7,486 |
| Hongyanhe Unit 4 | 89.33 | 99.99 | 84.35 | 97.12 | 7,389 | 8,531 |
| Hongyanhe Unit 5 | 90.97 | 91.51 | 81.86 | 85.67 | 7,171 | 7,525 |
| Hongyanhe Unit 6 | 99.99 | 92.55 | 98.79 | 87.08 | 8,654 | 7,649 |
| **Average of associates** | **95.19** | **93.54** | **88.90** | **87.12** | **7,787** | **7,653** |
| **Average of subsidiaries and associates** | **92.65** | **91.91** | **88.66** | **87.77** | **7,767** | **7,710** |
Based on the design of pressurized water reactor NPPs, the nuclear reactor of each unit in operation must be shut down and refueled after a certain period of time. Taking the safety and economic considerations for NPPs into account, nuclear power operators often make use of the refuelling period to intensively conduct preventive and corrective maintenance, inspection and testing projects as well as various modifications projects, and this is usually referred to as refuelling outage of generating units. At present, the designed refuelling intervals of all our nuclear power generating units are 18 months.
---
# The mission of refueling outage
## Components of Refueling Outage
- **Refueling**: The NPP must replace part of the nuclear fuel at the end of fuel life
- **Modification**: Modification to the system or equipment conducted during outage to eliminate and solve the defects in design or installation of power generating units, ageing of equipment and to perform technical updates
- **Testing**: In-service inspection and regular testing of equipment are conducted according to regulatory requirements
- **Maintenance**: Preventive and corrective maintenance conducted to enhance the operation capability for the next fuel cycle
## Types of Refueling Outages
- **Refueling outage (18 months)**: A cycle for nuclear power generating unit refueling outage (18 months)
- **Initial outage (12 months)**: The initial nuclear power generating unit refueling outage (in general 12 months)
- **10-year outage**: Conducted every 10 years after the initial outage
# To ensure that the nuclear power generating units maintain good operating conditions in the next cycle according to the design requirements
Refuelling outages intervals of nuclear power generating units are not fixed to every 18 months. On the premise of ensuring the safe operation of the generating units, we usually take local power load fluctuations into account and take the initiative to communicate with local power grid companies to rationalize the refuelling outage plans for generating units. As the requirements for inspection, maintenance and engineering modification projects are different, the duration of each refuelling outage is not identical. More inspection items are required for the initial outage and ten-year outage, resulting in a longer inspection period compared with that of regular refuelling outages. According to the specific operating conditions of each generating unit, we continue to enhance and develop targeted refuelling outage plans, reasonably arrange inspection and maintenance projects, and actively adopt advanced technology to improve the efficiency of inspection and maintenance in order to have good control over the duration of each refuelling outage on the premise of ensuring the quality of safety.
---
# Business Performance and Analysis
In 2025, we conducted 20 refuelling outages in total, including 1 refuelling outage conducted in 2024 carried over to the following year. As at December 31, 2025, we completed 19 refuelling outages, including 16 annual refuelling outages (with 1 annual refuelling outage carried over to the following year), 2 ten-year outages and 1 initial outage. The total number of days for the refuelling outages in 2025 was about 655 days.
"Pursuit of Excellence" is one of the basic principles of the Company. In order to identify our inadequacies and make continuous improvements, we continue to implement benchmarking with international peers. In recent years, when compared with the one-year benchmark value of all of the 12 performance indicators for WANO peer review, for our nuclear power generating units, the ratio of performance indicators achieving the world's top 1/4 (advanced level) and top 1/10 (excellent level) remained at a relatively high level, leading among international industry peers.
The following table indicates the comparison of 28 nuclear power generating units in operation managed by us for 2025 and the one-year benchmark value of the 12 performance indicators for the WANO peer review in 2024:
| Item | 2025 | 2024 |
| :--- | :---: | :---: |
| Number of units | 28 | 28 |
| Total number of indicators | 336 | 336 |
| **Including:** | | |
| Number/percentage of indicators ranked top 1/4 (advanced level) in the world | 286/85.12% | 290/86.31% |
| Number/percentage of indicators ranked top 1/10 (excellent level) in the world | 280/83.33% | 278/82.74% |
## Environmental Performance
We continued to improve radioactive waste management, optimize the control over the effluent discharge, and strictly complied with emission control standards. In 2025, all 28 generating units in operation managed by us strictly complied with the national laws and regulations in terms of radioactive waste management, met the standards of the relevant technical specifications, and were not subject to any administrative penalty due to environmental issues.
The following table sets forth the emission of the various types of radioactive waste discharged at our NPPs during the Reporting Period, which is indicated as a percentage of the national standards. The total amounts of radioactive effluent discharge from our NPPs were far below the applicable national limits.
---
| Site | Year | Discharged liquid radioactive waste (radionuclides other than tritium and carbon-14) as a percentage of the approved national annual limits | Discharged gas radioactive waste (inert gases) as a percentage of the approved national annual limits | Solid radioactive waste (m³) | Results of environmental monitoring |
| :--- | :--- | :--- | :--- | :--- | :--- |
| **Daya Bay Nuclear Power Site** (including Daya Bay NPP, Ling’ao NPP and Lingdong NPP) | 2025 | 0.35% | 1.84% | 149.1 | Normal |
| | 2024 | 0.23% | 0.46% | 148.9 | Normal |
| **Yangjiang NPP** | 2025 | 0.51% | 1.79% | 96.7 | Normal |
| | 2024 | 0.29% | 0.17% | 108.6 | Normal |
| **Taishan NPP** | 2025 | 1.34% | 4.42% | 40.8 | Normal |
| | 2024 | 1.20% | 4.41% | 1.4 | Normal |
| **Fangchenggang Phase I Project** (including Unit 1 and Unit 2) | 2025 | 0.13% | 0.97% | 28.8 | Normal |
| | 2024 | 0.28% | 0.87% | 37.2 | Normal |
| **Fangchenggang Phase II Project** (including Unit 3 and Unit 4) | 2025 | 2.72% | 4.52% | 7.7 | Normal |
| | 2024 | 2.33% | 4.04% | 0 | Normal |
| **Ningde NPP** | 2025 | 0.42% | 2.53% | 80.4 | Normal |
| | 2024 | 0.29% | 0.25% | 73.2 | Normal |
| **Hongyanhe Phase I Project** (including Unit 1 to Unit 4) | 2025 | 0.38% | 4.52% | 76.0 | Normal |
| | 2024 | 0.38% | 3.99% | 95.6 | Normal |
| **Hongyanhe Phase II Project** (including Unit 5 and Unit 6) | 2025 | 0.41% | 3.06% | 52.4 | Normal |
| | 2024 | 0.33% | 2.09% | 52.0 | Normal |
**Note:** Different nuclear power projects in the same nuclear power site may have different effluent emission limits approved by relevant national regulatory agencies, and the emission data between nuclear power projects is not comparable; the emission data of the same nuclear power project in different years is subject to refuelling outage arrangements and maintenance projects of generating units.
The national regulatory authorities continuously monitored the air-absorbed rates in the periphery of our nuclear power generating units in operation in the PRC. The monitoring data indicated that the air-absorbed rates fell within the fluctuation range of local background radiation levels.
---
# Business Performance and Analysis
Nuclear power is a clean energy source that contributes to energy saving and emission reduction to the society. Our annual on-grid nuclear power generation in effect represented a reduction of approximately 70.4458 million tons of standard coal consumption, approximately 214.9669 million tons of CO₂ emissions, approximately 17,900 tons of sulphur dioxide emissions, and approximately 29,100 tons of nitrogen oxides emissions.
## Nuclear Power Generating Units under Construction
The quality of NPPs under construction is important for the safe and efficient operations of nuclear power generating units after commencement of operation. We meticulously organize project construction in strict compliance with the requirements of relevant laws and regulations. All the major construction steps that need to be inspected by national regulatory authorities will be inspected and confirmed to meet the requirements before moving onto the next phase of work. We also attach importance to learning from experience feedbacks of domestic and foreign NPPs construction, and improving the safety and quality of our construction work.
As at December 31, 2025, among 20 nuclear power generating units under construction (including 4 units which were entrusted to the Company by the controlling shareholder of the Company for management), four were in the commissioning phase, two were in the equipment installation phase, seven were in the civil construction phase, and seven were in the FCD preparation phase.
---
We controlled, supervised and managed the safety, quality, environment, technology, progress and investment of our construction projects, so as to ensure that the safety and quality of the projects under construction comply with various regulatory requirements and standards, and facilitate long-term safe, stable and economical operation of the units after commencement of commercial operation. As of December 31, 2025, the progress of the units under construction that we manage is as follows:
| Nuclear Power Generating Units | FCD Preparation Phase | Civil Construction Phase | Equipment Installation Phase | Commissioning Phase | Grid Connection Phase | Expected Time of Commencement of Operation | Key Milestone | 2025 Date |
| :--- | :---: | :---: | :---: | :---: | :---: | :--- | :--- | :--- |
| **From subsidiaries** | | | | | | | | |
| Lufeng Unit 1 | | $\checkmark$ | | | | 2030 | FCD | February 24, 2025 |
| Lufeng Unit 2 | | $\checkmark$ | | | | 2030 | FCD | December 22, 2025 |
| Lufeng Unit 5 | | | $\checkmark$ | | | 2027 | – | – |
| Lufeng Unit 6 | | | $\checkmark$ | | | 2028 | Dome installation | July 14, 2025 |
| Taishan Unit 3 | $\checkmark$ | | | | | – | Approved | April 27, 2025 |
| Taishan Unit 4 | $\checkmark$ | | | | | – | – | – |
| Huizhou Unit 1 | | | | $\checkmark$ | | First Half of 2026 | Completion of initial fuel loading | December 24, 2025 |
| Huizhou Unit 2 | | | | $\checkmark$ | | Second Half of 2026 | Completion of hot functional test | July 30, 2025 |
| Huizhou Unit 3 | | $\checkmark$ | | | | 2030 | FCD | June 10, 2025 |
| Huizhou Unit 4 | $\checkmark$ | | | | | – | – | – |
| Fangchenggang Unit 5 | $\checkmark$ | | | | | – | Approved | April 27, 2025 |
| Fangchenggang Unit 6 | $\checkmark$ | | | | | – | – | – |
| Zhaoyuan Unit 1 | | $\checkmark$ | | | | 2031 | FCD | November 18, 2025 |
| Zhaoyuan Unit 2 | $\checkmark$ | | | | | – | – | – |
| **From joint ventures** | | | | | | | | |
| Ningde Unit 5 | | $\checkmark$ | | | | 2029 | – | – |
| Ningde Unit 6 | | $\checkmark$ | | | | 2030 | FCD | December 16, 2025 |
| **From companies which were entrusted by the controlling shareholder for management** | | | | | | | | |
| Cangnan Unit 1 | | | | $\checkmark$ | | 2026 | Completion of initial fuel loading | December 24, 2025 |
| Cangnan Unit 2 | | | | $\checkmark$ | | 2027 | Commencement of cold functional test | September 27, 2025 |
| Cangnan Unit 3 | | $\checkmark$ | | | | 2030 | FCD | November 19, 2025 |
| Cangnan Unit 4 | $\checkmark$ | | | | | – | – | – |
The construction process of nuclear power generating units may be affected by various factors including, among others, delivery delays, increase in the cost of key equipment and materials, delay in obtaining regulatory approvals, permits or licenses, unexpected engineering, environmental or geological problems, change of localization ratio as well as the implementation of additional China’s regulatory and safety requirements for nuclear safety, so the actual date of commencement of operation may be different from the expected time. We will disclose updated information pursuant to the relevant requirements from time to time.
---
# Business Performance and Analysis
## Sales of Electricity
We sell the electricity generated by our NPPs based on electricity sales contracts. In 2025, the on-grid power generation of our subsidiaries was 183,498 GWh. Our power sales companies recorded actual electricity consumption of agent clients other than the Group of approximately 130,847 GWh. In 2025, our sales revenue of electricity (including the revenue from commissioning) was approximately RMB61,757.1 million in total, representing 81.6% of our operating revenue for the year.
In 2025, the total electricity consumption in the PRC reached 10,400 billion kWh, representing an increase of 5% year-on-year. Due to the different economic development conditions of each province, the supply and demand for electricity in the provinces and regions where our nuclear power generating units are located varied slightly. In 2025, the Company continued to adopt the power sales strategy of "striving for more on-grid power generation quota, striving for better market power generation and power tariff, striving for development and utilization of incremental market and striving for more shares in power transmission across provinces and regions". In response to the impact of nuclear power generating units participating in market-based transactions in each province and region, the Company actively developed high-quality market users and facilitated its units for greater and full load power generation. The Company basically fulfilled its power generation plans for the year. However, affected by the decline in the market-based electricity trading prices in certain regions, the average settling tariff of the Company decreased year-on-year.
In 2025, our nuclear power generating units in operation achieved a total on-grid power generation of 232,648 GWh (including our associates), representing a year-on-year increase of 2.36%. Market-based power generation volume accounted for approximately 56.2% of the total on-grid power generation, representing a year-on-year increase of approximately 5.3%.
### Guangdong Province
**Guangdong Province:** The electricity consumption in the province in 2025 increased by 4.93% over the corresponding period of previous year. According to the "Notice on Doing a Good Job in Electricity Market Annual Transactions in 2025" (《關於做好 2025 年電力市場年度交易工作的通知》) issued by the Energy Administration of Guangdong Province (廣東省能源局), a total of 10 units of Ling'ao Nuclear, Lingdong Nuclear and Yangjiang Nuclear took 7,500 hours as the benchmark value, and arranged annual market-based power generation of approximately 27.3 billion kWh in total. The on-grid power generation of the nuclear power generating units within the Guangdong Province increased by 1.14% year-on-year, which was mainly due to the shorter time taken for refuelling outages of the Group's power generating units within the Guangdong Province in 2025 as compared to the corresponding period of previous year.
---
# Guangxi Zhuang Autonomous Region
**Guangxi Zhuang Autonomous Region:** The electricity consumption in the province increased by 5.7% in 2025 over the corresponding period of previous year. Fangchenggang Unit 1 to Unit 4 participated in the market-based electricity transactions with their entire on-grid electricity. In 2025, the on-grid power generation of Fangchenggang Nuclear increased by 10.64% over the corresponding period of previous year, which was mainly due to the commencement of commercial operation of Fangchenggang Unit 4 in May 2024.
# Fujian Province
**Fujian Province:** The electricity consumption in the province increased by 6.4% in 2025 over the corresponding period of previous year. Ningde Unit 1 to Unit 4 participated in the market-based electricity transactions with their entire on-grid electricity. In 2025, the on-grid power generation of Ningde Nuclear increased by 0.53% over the corresponding period of previous year, which was mainly due to the shorter time taken for refuelling outages of power generating units in 2025 as compared to the corresponding period of previous year.
# Liaoning Province
**Liaoning Province:** The electricity consumption in the province increased by 3.78% in 2025 over the corresponding period of previous year. Hongyanhe Unit 1 to Unit 4 participated in the market-based electricity transactions with their entire on-grid electricity. In 2025, the on-grid power generation of Hongyanhe Nuclear increased by 1.82% year-on-year, which was mainly due to the shorter time taken for refuelling outages of power generating units in 2025 as compared to the corresponding period of previous year.
---
# Business Performance and Analysis
In 2025, each of our power sales companies made vigorous efforts in actively engaging in and closely tracking situations of electricity markets in the provinces and regions where they were located at and got involved in market transactions proactively. The actual electricity consumption of our 449 retail agent clients amounted to approximately 25,537 GWh (including agent clients other than the Group).
We paid close attention to the on-grid tariffs of operating units. The Company's on-grid tariffs for operating units are classified into Approved Tariffs and Market-based Tariffs. The Approved Tariffs are approved by the relevant government authorities, and the Market-based Tariffs are formed through market-based transactions. In 2025, the Approved Tariffs for the nuclear power generating units in operation of the Company remained unchanged. In 2025, the average Market-based Tariffs of the Company decreased by approximately 8.8% as compared to 2024, mainly due to the overall decline in the market-based electricity trading prices.
The Approved Tariffs (VAT inclusive) of our nuclear power generating units in operation as at December 31, 2025 are set out in the table below.
| Nuclear Power Generating Units | Clients | Approved Tariffs (VAT included) (RMB/kWh) |
| :--- | :--- | :--- |
| Daya Bay Unit 1 and Unit 2 | Guangdong Power Grid Co., Ltd. | 0.4056 |
| Ling’ao Unit 1 and Unit 2 | Guangdong Power Grid Co., Ltd. | 0.4143 |
| Lingdong Unit 1 and Unit 2 | Guangdong Power Grid Co., Ltd. | 0.4153 |
| Yangjiang Unit 1 to Unit 6 | Guangdong Power Grid Co., Ltd. | 0.4153 |
| Taishan Unit 1 and Unit 2 | Guangdong Power Grid Co., Ltd. | 0.4350 |
| Fangchenggang Unit 1 to Unit 4 | Guangxi Power Grid Co., Ltd. | 0.4063 |
| Ningde Unit 1 and Unit 2 | State Grid Fujian Electric Power Co., Ltd. | 0.4153 |
| Ningde Unit 3 | State Grid Fujian Electric Power Co., Ltd. | 0.3916 |
| Ningde Unit 4 | State Grid Fujian Electric Power Co., Ltd. | 0.3590 |
| Hongyanhe Unit 1 to Unit 4 | State Grid Liaoning Electric Power Co., Ltd. | 0.3823 |
| Hongyanhe Unit 5 and Unit 6 | State Grid Liaoning Electric Power Co., Ltd. | 0.3749 |
---
# SCS Management and Lean Management
In 2025, we continued to promote SCS management and lean management strategies and maintained sound production safety. For example, in terms of unit operations, we developed plans to address outstanding issues with major equipment, along with specialized improvement plans for four key areas: emergency diesel generators, critical pumps, cooling sources and instrumentation & control. These efforts were driven through the Company’s “One List, One Network” framework to steadily improve the reliability of key equipment. We also established a fleet excellence team for Hualong One (HPR1000) units outages to coordinate optimization efforts for outages of Hualong One (HPR1000) units. This led to the completion of 20 pilot optimization projects such as optimizing containment pressure test drainage, optimizing the maintenance cycle for electric actuators, and introducing low-voltage switchgear testing devices. These improvements were successfully applied during the first outage of Fangchenggang Unit 4, contributing to enhanced unit’s safety and economic efficiency. In terms of construction, we continued to strengthen our mass construction capacity for Hualong One (HPR1000), advancing the broader application of advanced construction technologies, including modular approaches like rebar cage assembly, domestically manufactured welding equipment for main coolant pipes, and integrated insulation modules for reactor pressure vessels, which led to notable improvements in safety, quality and environmental management levels. A full-plant 3D underground design model and 3D rebar design for nuclear island civil engineering were applied in the Huizhou Phase II project for the first time. Digital sand tables, intelligent construction management platforms, and smart commissioning systems are delivering growing value-added benefits, with digitalization consistently empowering project construction.
In 2025, we continued to enhance our safety and quality management, adhering to technological innovation to facilitate continuous optimization of refuelling outage. For example, in the promotion and application of generator rotor extraction-free inspection robots, our independently developed “Wukong” series robots further extended their coverage to multiple mainstream generator models, with their applicability validated at sites such as Daya Bay, Ningde and Fangchenggang. We developed a suite of intelligent equipment and associated tooling for remote machining, automatic welding, automated liquid penetrant testing, and valve seat pulling and alignment, which enabled rapid online replacement of the sealing surfaces on high-radiation valve seats within the primary loop. The technology was successfully applied during the outage of Yangjiang Unit 2, shortening the critical path of the outage by 120 hours.
# Comprehensive Use of Nuclear Energy
In addition to focusing on nuclear power generation as its principal business, the Company has also been actively taking an initiative to conduct research on the comprehensive use of nuclear energy, aiming to explore new technologies and new models. The Company strives to diversify its nuclear energy products and develop a complementary and comprehensive approach to use multiple forms of energy with nuclear energy as the core, which will be able to support its nuclear power business, make an effective response to the impact of the market-oriented electricity system reform on the economic efficiency of nuclear power projects, and enhance market competitiveness.
---
# Business Performance and Analysis
First, key projects are progressing in an orderly manner. In terms of nuclear heating, the Company’s demonstration heating project in Hongyanhe, Liaoning, has continued to operate stably for its fourth heating season. The Wafangdian heating project is progressing steadily, and the Shandong nuclear energy heating project is progressing according to the goal of “being put into operation simultaneously with the unit”. Regarding nuclear steam supply, the Company has preliminarily identified steam demand in parts of Guangxi and Fujian. Second, in exploring the scenarios for the comprehensive use of nuclear energy, the Company actively promotes innovation in technology, products and models to promote new development pathways, and continues to explore other scenarios for the integrated applications of nuclear energy, conducting preliminary studies focused on areas such as energy storage, seawater desalination and the “nuclear power + computing center” model.
# FUTURE OUTLOOK
The power sector is a fundamental energy industry of great significance in the development of the national economy. As a safe, efficient, clean and low-carbon power source providing support, nuclear power has a prominent role and position. In view of the national strategy of pursuing carbon peaking and carbon neutrality and China’s 2035 NDC targets, the development of the nuclear power industry is still in an important strategic opportunity period. The Company’s development and operation are subject to a lot of new requirements and new changes. We will adhere to the nuclear safety culture of honesty and transparency and the basic principles of “Safety First, Quality Foremost, Pursuit of Excellence” to explore new ideas, actively plan and respond.
The year 2026 marks the beginning of the “15th Five-Year Plan”. Anchored in the vision of becoming a globally competitive world-class nuclear power supplier and service provider, the Company will focus on raising standards in safety, quality and environmental performance; advancing the development and construction of nuclear power projects and integrated nuclear energy application projects; deepening lean operations; and fostering and expanding new quality productive forces. Through these efforts, we aim to strengthen our foundation, improve quality and efficiency, and pursue innovation-driven growth, ensuring a robust start to the “15th Five-Year Plan” period. We plan to carry out the following key initiatives:
1. We will continue to strengthen safety responsibilities across all levels, further advance specialized initiatives for nuclear safety management, and conduct performance reviews of safety production responsibilities. Efforts to identify and address critical hidden risks in generating units will be intensified. We will also consolidate and enhance outcomes in nuclear safety culture and leadership development, actively enhance intrinsic safety levels, and promote the development of a risk-informed nuclear safety supervision framework. Furthermore, we will systematically prevent and mitigate risks in safety, quality and environmental protection, continuously improve the effectiveness of the quality assurance system, rigorously apply lessons learned from internal and external experience, and ensure absolute nuclear safety with zero failures;
---
2. We will continue to strengthen market development, push ahead with project approval, and advance the development of nuclear power projects and integrated nuclear energy application projects with high quality. On the premise of ensuring safety and quality, we will push forward construction of generating units (including entrusted management projects) in high quality as planned, and achieve the high quality commercial operation of Huizhou Unit 1, Unit 2 and Cangnan Unit 1;
3. We will ensure the safe and stable operation of all the generating units in operation. We plan to conduct new 19 refuelling outages during the year (including six 10-year outages), with seven refuelling outages in the first quarter, three refuelling outages in the second quarter, five refuelling outages in the third quarter, and four refuelling outages in the fourth quarter;
4. We will closely follow and analyze the changes in the electricity market environment, enhance the marketing system and mechanism of electricity market, and strengthen efforts to diversify our customer base in the electricity market, in order to secure more on-grid power generation through various channels and initiatives, access more favorable types of market trading, as well as strive for more favorable market tariffs. In accordance with the relevant arrangements for the electricity market transactions in 2026, a total of 24 nuclear power generating units (including associates) of the Company will participate in electricity market transactions, which have all completed the signing of annual or quarterly medium – and long-term market-oriented power generation as required. We will adopt targeted marketing strategies, strengthen experience sharing, study market trends and policy changes, and strive to achieve an average utilization hour of generating units in 2026 not less than the average of the average utilization hour of generating units for the last three years in order to safeguard the overall economic benefits of the Company;
5. We will boost business growth through self-reliant innovation to facilitate the sustainable development of the Company. With consistent proprietary nuclear power research, we will better leverage our role as the source of original technologies, and accelerate the research and development of advanced nuclear energy as well as the construction of research and development platforms. We will persistently increase our investment in scientific research, strengthen the full life-cycle management of scientific research projects, enhance open collaboration in science and technology, and promote the deep integration of technological innovation with industrial innovation, thereby injecting new momentum into the Company’s high-quality development;
6. We will continuously push forward the implementation of SCS management strategy, improve the level of lean management across all areas of the nuclear power value chain, and strengthen internal resources planning and coordination to strengthen our control over construction cost of generating units under construction as well as the continuous control over operation and maintenance cost of generating units in operation;
7. We will closely follow the change of national policy, domestic and international economic and financial environment, adhere to the principle of prudence, identify changes in risks in a timely manner through operation of risk management system, and adjust our existing measures when appropriate to ensure the steady development of the Company.
---
# CAPITALS
- **58** Production Capital
- **62** Intellectual Capital
- **67** Human Capital
- **77** Financial Capital
- **83** Environmental Capital
- **85** Social and Relationship Capital
---
This page contains only an image with no extractable text, headings, lists, tables, or financial data that conforms to the requested markdown structure. In accordance with the instructions, visual elements and images have been ignored.
---
# Production Capital
Our production capital primarily consists of the nuclear power units we manage (including those in operation and under construction), as well as the consistently optimized management strategies. With these capitals, we continue to provide customers with stable and reliable power.
- **28** Nuclear power units in operation
- **16** Note Nuclear power units under construction: (Note: Excluding Cangnan Unit 1 to Unit 4 managed by the Company as entrusted by the controlling shareholder.)
## 1 Daya Bay Nuclear Power Site
**Daya Bay NPP:**
Located in Shenzhen City of Guangdong Province, Daya Bay NPP has two nuclear power generating units in operation, which have a single-unit installed capacity of 1,026GW and use M310 technology. Daya Bay NPP is a large commercial PWR NPP that was built in the PRC by utilizing foreign investment, advanced technology and management experience. Unit 1 commenced commercial operation on February 1, 1994 and is the first commercial nuclear power unit that commenced commercial operation in the PRC.
**Ling’ao NPP:**
Located in Shenzhen City of Guangdong Province, Ling’ao NPP is adjacent to Daya Bay NPP. It has two nuclear power generating units in operation, which have a single-unit installed capacity of 990MW and use M310 technology. Ling’ao NPP is the second large-scale commercial NPP built in Guangdong Province following Daya Bay NPP. Leveraging our experience gained in the construction of Daya Bay NPP, Ling’ao NPP met international standards for NPP operation design and construction with fully localized project management, construction and installation, commissioning and operations preparation, and partially localized design and equipment manufacturing.
**Lingdong NPP:**
Located in Shenzhen City of Guangdong Province, Lingdong NPP is adjacent to Daya Bay NPP and Ling’ao NPP. It has two nuclear power generating units in operation, which have a single-unit installed capacity of 1,086MW and use CPR1000 technology. Lingdong NPP is the third large-scale commercial NPP built in Guangdong Province following Daya Bay NPP and Ling’ao NPP. It is a demonstration project for the PRC’s domestically developed and modified CPR1000 gigawatt-level nuclear power technology, and is also the PRC’s first gigawatt-level NPP designed, manufactured, constructed and operated in reliance upon the PRC’s domestic service providers and equipment suppliers.
## 2 Yangjiang Nuclear Power Site – Yangjiang NPP:
Located in Yangjiang City of Guangdong Province, Yangjiang NPP has six nuclear power generating units in operation with a single-unit installed capacity of 1,086MW. Unit 1 to Unit 4 use CPR1000 series technology, and Unit 5 and Unit 6 use ACPR1000 technology. Yangjiang NPP is a key energy development project under the PRC’s 11th Five-Year Plan, represents a major milestone in the development of nuclear power in the PRC in scale, series and standardization, and plays an important role in the localization of nuclear power equipment production.
---
3. **Ningde Nuclear Power Site – Ningde NPP:**
Located in Ningde City of Fujian Province, Ningde NPP has six nuclear power generating units. Unit 1 to Unit 4 are nuclear power generating units in operation, which have a single-unit installed capacity of 1,089MW and use CPR1000 technology. Unit 5 and Unit 6 are nuclear power generating units under construction, which have a single-unit installed capacity of 1,210MW and use HPR1000 technology. Ningde NPP is the first NPP that commenced commercial operation in Fujian Province.
4. **Hongyanhe Nuclear Power Site – Hongyanhe NPP:**
Located in Dalian City of Liaoning Province, Hongyanhe NPP has six nuclear power generating units with a single-unit installed capacity of 1,119MW. Unit 1 to Unit 4 use CPR1000 technology, while Unit 5 and Unit 6 use ACPR1000 technology. Hongyanhe NPP is the first NPP that commenced commercial operation in northeast PRC.
5. **Fangchenggang Nuclear Power Site – Fangchenggang NPP:**
Located in Fangchenggang City in Guangxi Zhuang Autonomous Region, Fangchenggang NPP has six nuclear power generating units in operation. Unit 1 to Unit 4 are nuclear power generating units in operation. Unit 1 and Unit 2 have a single-unit installed capacity of 1,086MW and use CPR1000 technology, while Unit 3 and Unit 4 have a single-unit installed capacity of 1,188MW and use HPR1000 technology. Unit 5 and Unit 6 are nuclear power generating units under construction, which have a single-unit installed capacity of 1,208MW and use HPR1000 technology. Fangchenggang NPP is the first NPP in western PRC.
6. **Taishan Nuclear Power Site – Taishan NPP:**
Located in Taishan City of Guangdong Province, Taishan NPP has four nuclear power generating units. Unit 1 and Unit 2 are nuclear power generating units in operation with a single-unit installed capacity of 1,750MW and use EPR technology, which were invested and constructed by a Sino-French joint venture. Unit 3 and Unit 4 are nuclear power generating units under construction with a single-unit installed capacity of 1,200MW and use HPR1000 technology.
7. **Huizhou Nuclear Power Site – Huizhou NPP:**
Located in Huizhou City in Guangdong Province, Huizhou NPP has four nuclear power generating units under construction. Unit 1 and Unit 2 have a single-unit installed capacity of 1,202MW, while Unit 3 and Unit 4 have a single-unit installed capacity of 1,209MW, and use HPR1000 technology.
8. **Lufeng Nuclear Power Site – Lufeng NPP:**
Located in Lufeng City in Guangdong Province, Lufeng NPP has four nuclear power generating units under construction. Unit 1 and Unit 2 have a single-unit installed capacity of 1,245MW and use CAP1000 technology, while Unit 5 and Unit 6 have a single-unit installed capacity of 1,200MW and use HPR1000 technology.
9. **Zhaoyuan Nuclear Power Site – Zhaoyuan NPP:**
Located in Zhaoyuan City in Shandong Province, Zhaoyuan NPP has two nuclear power generating units under construction with a single-unit installed capacity of 1,214MW. Both nuclear power generating units use HPR1000 technology.
---
# Production Capital
## Management Strategy
Following the commencement of commercial operation of Daya Bay NPP, the number of nuclear power generating units in operation and under construction managed by the Company has gradually increased. The number of nuclear power sites has increased from 1 to multiple sites across different provinces, and the nuclear power technology applied has evolved from the second generation to the third generation, expanding the scope and elevating the difficulty of the Company’s management. We persist in optimizing our management strategies. We continue to promote nuclear power safety and leadership building, conduct multi-layered safety supervision and evaluation, strengthen SCS management, establish risk classification and rectify potential hazards, constantly reinforce the production safety risk management across various NPPs, and promote the digital transformation of nuclear power, in a view to adapt to the changes of internal and external situations, thereby promoting our continuous improvement in operational level and performance in the process of sustained business growth.
## SCS Management
To maintain the safe and stable operation of all generating units in operation, ensure the high-quality commercial operation of new generating units, and speedily achieve consistency in operational performance across all sites, the Company has implemented SCS management on all nuclear power sites.
### Standardization
**Goal:** Safe and stable operation of generating units in operation
- Standardized construction of generating units
- Standardized management system
- Standardized operating procedures
### Centralization
**Goal:** High-quality commercial operation of generating units under construction
- Centralized resources allocation
- Centralized technical support
- Centralized information sharing
### Specialization
**Goal:** Achieve consistency in operational performance across all sites speedily
- Specialized work division
- Specialized talent team
- Specialized capability building
---
For standardization, we have established the OPST (Organization, Procedure and process, Knowledge and skill, and System tools) management model for key operating areas. This model aims to achieve a unified organizational management system, a unified technical standard and procedure and process system, a unified job qualification and authorization training system, and a unified operation management toolset.
For centralization, we have continuously enhanced the economic efficiency of our power generating units and maximized overall value through centralized management such as by means of optimized resources allocation, effective operation of centralized platform, and information sharing. We continued to facilitate the standardization and informatization of tender management, spare parts management and other aspects. By leveraging big data to improve management efficiency, we have gradually expanded the scope of centralized procurement for spare parts and common materials, implemented coordinated resources allocation, improved our bargaining power in centralized procurement, optimized procurement channels, and achieved huge cost effectiveness.
For specialization, the Company owns specialized companies including CGN Operations, CNPRI, SNPI and CGN Engineering, which offer specialized services for NPPs in respect of refuelling outage, engineering modification, equipment management, spare parts management, as well as design and construction of NPPs. In addition, based on the production, operation and management features of various NPPs, we pooled superior resources of NPPs and specialized companies to establish 22 function areas peer groups (the "**PG Groups**"). Each PG Group comprises specialized technical managers from the Company, each NPPs and specialized companies. The PG Groups focus on inter-organizational coordination and management in areas including communication and exchanges, problem-driven approach and capability cultivation. By pooling professional expertise, they provide targeted solutions to common technical issues of NPPs, promote the application of new tools, new technologies and good practice, enhance professional capabilities in various areas, as well as continuously facilitate each NPP to pursue excellence.
---
# Intellectual Capital
**Strong technical foundation and technical R&D capabilities are among the core resources for our sustainable development. We always focus on technical R&D that improves our business performance to enhance our competitiveness and growth.**
## Selection and Development of Nuclear Technologies
We are dedicated to the development of PWR technology. Since the construction of Daya Bay NPP in the 1980s, we have persisted in the path of “Introduction, Digestion, Assimilation and Innovation” (“引進、消化、吸收、創新”), and have consistently improved our technology.
Building on the M310 reactor technology used at Daya Bay NPP, we implemented a series of major technological improvements (including 16 safety improvements), fostering the development of the advanced second-generation CPR1000 nuclear power technology of our own brand. In alignment with the latest international safety standards and latest experience feedbacks, we have successively implemented 28 and 31 safety technical improvements, culminating in the development of the ACPR1000 technology which incorporates the major features of third-generation nuclear power technology.
We researched and developed the proprietary intellectual property rights of the third-generation nuclear power technology HPR1000. HPR1000 is a gigawatt-level third-generation nuclear power technology with proprietary intellectual property rights developed on the basis of experience, technology and talents from the PRC’s NPP design, construction, operation and R&D for more than three decades. The HPR1000 demonstration project has commenced high-quality production. On the basis of the demonstration project and under the premise of ensuring safety, we continued to promote design optimization and technical improvement with the objectives of improving the economic efficiency, advancement and self-reliance level of HPR1000, and thus created the HPR1000 2.0 version with greater competitiveness, which has laid the foundation for enhancing the competitiveness of HPR1000.
Meanwhile, in response to the development trend towards safer and more economical nuclear power technologies, we strengthen innovation in nuclear power technology, establish strategic research initiatives to put great efforts in promoting the development of fourth-generation nuclear technology and small PWR technology, and closely monitor the latest development of advanced nuclear power technologies at home and abroad to maintain competitiveness and lay the foundation for the sustainable development of the Group.
---
# Independent R&D Platform
We have established a R&D framework for the Company. We own one national engineering and technology center, one national key laboratory and five national energy R&D platforms. We have also established a number of large laboratories that are at the forefront of the industry. We applied for two additional state-level R&D platforms in 2023. In 2025, our dedication to platform development and endeavors in major research projects led to an array of technological achievements and awards, marking substantial progress.
Facing global technological advancements and focusing on cutting-edge nuclear energy technologies and technological innovations, we leveraged on our location in the Guangdong-Hong Kong-Macao Greater Bay Area to establish the Southern Center, which includes four R&D bases strategically located in Shenzhen, Yangjiang, Zhongshan and Huizhou. Our aim is to capitalize on the advantages of being at the forefront of reform and opening-up, attract top-tier scientific researchers and technological innovation talents, accelerate R&D of key technologies and technological innovation, and continuously consolidate our technical strength. In 2025, the Southern Center gradually proceeded with construction under the「One Headquarters, Multiple Bases」approach. Several large-scale experiment benches have been established in the experiment facility at the Zhongshan R&D base, which commenced experimental activities. For the construction progress of the Southern Center, please refer to the 2025 ESG Report of the Company.
The establishment of independent R&D platforms helps shorten the transformation cycle of scientific and technological achievements, improve the maturity, compatibility and engineering level of existing achievements, accelerate the technological transformation of our production processes, promote technological upgrades, and provide us with basic technical support for enhancing our R&D capabilities. As at the end of 2025, we had 4,240 R&D staff.
## Five national energy R&D centers
- National Energy NPP Nuclear Graded Equipment R&D Center
- National Energy Marine NPP Technology R&D Center
- National Energy Advanced Nuclear Fuel Components R&D (Experiment) Center
- National Energy NPP Operation and Life Management R&D Center
- National Energy Nuclear Power Engineering Construction Technology R&D (Experimental) Center
## One national engineering and technology Center
- National NPP Safety and Reliability Engineering Technology R&D Center
## One national key laboratory
- State Key Laboratory of Nuclear Safety Technology and Equipment
## Southern Center
- Four sites under construction with each in Shenzhen, Yangjiang, Zhongshan and Huizhou
---
# Intellectual Capital
## R&D of Key Technologies
Relying on our own R&D platforms, we continue to study and solve key technical issues in the construction and operation of NPPs, and continuously improve the safety, reliability and economic efficiency of our generating units. We have also promoted part of our key technologies to markets outside of the Group, thus increasing our business opportunities.
We have successfully developed a number of technical innovations, and we will select some of our important achievements every year to introduce in our annual report. We continue to introduce some of the major technologies recently applied as follows.
| Name of technology / equipment | Summary of technology | Benefits |
| :--- | :--- | :--- |
| **Intelligent nuclear emergency command system for NPPs** | Through research and application of intelligent technologies, this system systematically constructs an emergency response solution integrating process guidance and tool algorithms from a holistic perspective encompassing emergency status, emergency notification, accident mitigation, personnel protection, and public information. It features highly intelligent nuclear emergency situation analysis, assessment, and decision-making support capabilities, further enhancing the emergency response technological level of NPPs.
Overall technology has reached the advanced standard among domestic industry peers.
This system has been applied in Daya Bay NPP. | Enhanced safety |
---
| Name of technology/equipment | Summary of technology | Benefits |
| :--- | :--- | :--- |
| Domestically produced nuclear-grade enriched boric acid | Enriched boric acid is a speciality chemical product with an abundance of over 96%. It is primarily used to absorb some of the neutrons generated in the reactor core of PWR NPPs. It can also be used as a basic raw material to produce neutron shielding materials, enriched boron carbide control rod pellets for advanced reactor types, and emergency shutdown materials for other reactor types. It is an indispensable chemical for ensuring nuclear safety. Through independent R&D, China has achieved self-sufficient production and large-scale supply of this product. Product quality surpasses that of imported products across the board, and product price is significantly lower than that of imported products during the same period, achieving the goal of establishing a domestic supply chain characterized by stable supply, reliable quality, and reasonable pricing.
Overall technology has reached the internationally advanced standards.
This product has been applied in Yangjiang, Fangchenggang and Ningde NPPs. | Enhanced safety, reliability and economic efficiency |
---
# Intellectual Capital
## Intellectual Property Rights
Technical improvements and innovations can enhance the operational and safety performance of NPPs, and at the same time we also pay attention to acquire intellectual property rights accordingly during the course of technical R&D. We believe that owning these intellectual property rights will strengthen our competitiveness.
### Statistics of our intellectual property rights from 2014 to 2025
| Year | Patent Application: Invention | Patent Application: Utility Model | Patent Application: Design | Patent Licensing: Invention | Patent Licensing: Utility Model | Patent Licensing: Design | Authorship Registration: Software | Authorship Registration: Others |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| 2014 | 292 | 198 | 0 | 54 | 249 | 1 | 51 | 4 |
| 2015 | 285 | 229 | 0 | 101 | 241 | 0 | 107 | 2 |
| 2016 | 458 | 272 | 2 | 239 | 234 | 6 | 128 | 22 |
| 2017 | 437 | 413 | 3 | 269 | 267 | 1 | 140 | 25 |
| 2018 | 600 | 443 | 3 | 229 | 424 | 2 | 138 | 9 |
| 2019 | 644 | 461 | 5 | 297 | 440 | 7 | 155 | 22 |
| 2020 | 746 | 453 | 8 | 344 | 439 | 6 | 112 | 4 |
| 2021 | 795 | 476 | 11 | 352 | 529 | 12 | 177 | 8 |
| 2022 | 914 | 472 | 1 | 339 | 513 | 2 | 154 | 10 |
| 2023 | 1,115 | 547 | 6 | 517 | 465 | 3 | 222 | 20 |
| 2024 | 1,212 | 618 | 6 | 509 | 381 | 2 | 308 | 0 |
| 2025 | 1,427 | 601 | 3 | 621 | 566 | 9 | 242 | 5 |
| **Total** | **8,925** | **5,183** | **48** | **3,871** | **4,748** | **51** | **1,934** | **131** |
---
# Human Capital
A team of sufficiently competent and experienced employees is the most valuable asset of the Company. We always pay attention to the reasonable use and maintenance of human capital, and continuously improve the development and management system of human resources, thus cultivating a talent pool with excellent management and technical expertise.
## Talent Force
As at the end of 2025, we had 22,928 employees (exclusive of our associates and joint ventures).
## Employee Structure
### Composition of employees in terms of profession
| Profession | 2025 Number of employees | 2024 (Restated) Number of employees |
| :--- | :--- | :--- |
| Operation and management employees | 1,900 | 1,517 |
| Business function employees | 1,251 | 1,269 |
| On-site operation and support employees | 3,058 | 2,763 |
| Other technicians | 16,719 | 15,834 |
| **Total** | **22,928** | **21,383** |
### Education level of employees (%)
| Education Level | 2025 (%) | 2024 (Restated) (%) |
| :--- | :--- | :--- |
| Doctor's degree | 1.40 | 1.21 |
| Master's degree | 22.00 | 21.04 |
| Bachelor's degree | 73.27 | 73.81 |
| College and below | 3.33 | 3.94 |
### Age composition of employees (%)
| Age Group | 2025 (%) | 2024 (Restated) (%) |
| :--- | :--- | :--- |
| 28 and below | 28.89 | 24.86 |
| 29-35 | 19.56 | 23.50 |
| 36-45 | 37.71 | 37.84 |
| 46-49 | 4.58 | 4.71 |
| 50 above | 9.26 | 9.09 |
---
# Human Capital
## Recruitment of Talents
To meet the needs of the Company’s business development, maintain a reasonable structure of our talent pool, and ensure the availability of talents, the Company has formulated a human resources plan to recruit talents through a combination of on-campus recruitment and general hiring.
Considering from the perspectives of talent pooling and cultivation, our recruitment of talents is focused on on-campus recruitment. In 2025, the Company recruited 1,939 outstanding graduates through on-campus recruitment and 21 persons through general hiring. In 2025, the Company also recruited 9 high-level talents, and established long-term cooperation with 14 academicians and university teams to further build an excellent scientific research team.
## Personnel Management
### Development Paths
We respect the contribution made by every employee, pay attention to their career development, and encourage them to develop their own career development plan under the guidance and assistance of the Company. We have specific responsibilities and qualifications for all types and levels of positions, establish a comprehensive multi-track position management system encompassing administrative, technical, and skilled roles, and implement corresponding transition mechanisms to further broaden the career paths for various types of talent and facilitate the scientific and rational allocation of human resources. For core key employees and outstanding young employees, we pursue our mutual development with employees.
---
## Internal market
The Company encourages employees to concentrate on their own job responsibilities to master the business skills required for their own positions and become experienced professionals. At the same time, by incorporating the development strategies of the Company and the personal development goals of employees, we continually improve our internal market-oriented employment mechanism to facilitate the reasonable and orderly flow of talents, thereby enhancing the efficiency of our human resource allocation, achieving appreciation in human capital as well as offering more development opportunities for employees. In 2025, over 60% of our mid-level management and high-tech positions were filled through open recruitment.
## Appraisal system
The Company uses responsibility, competence and performance as evaluation criteria while aligning with its strategic direction, and breaks down its strategic focus and operational goals layer by layer across various levels of the organization and positions, thereby establishing a comprehensive, vertically integrated, precise and closed-loop performance appraisal system for all employees, which effectively links performance appraisal results to bonuses, compensation, position adjustments, and training and development, among others, to motivate employees to work hard and innovate. In 2025, we achieved full coverage of term-based and contract-based management for mid-level and senior managers.
# Personnel Training
While maintaining stable business growth, the Company emphasizes the continuous enhancement of the working skills of our employees. Adhering to the core principle of “cultivate people, not just train them” as always, the Company implements the basic requirements of “entire staff training, authorized employment and life-long learning”. By integrating the advanced experience of personnel training learned from our international counterparts with our own development characteristics, we have developed our personnel training system as well as a standardized and efficient training management system, boasting a team of experienced and qualified instructors, a comprehensive curriculum, and large-scale training facilities. We actively promote standardized and regulated personnel training for nuclear power operations, which effectively meets the needs for personnel for the stable development of the Company.
In alignment with the business development of the Company, we regularly update our personnel training scheme. We have prepared our talent succession plan 2025 in accordance with the medium and long-term planning needs for talents and the feedback on training experiences. We focus on strengthening the cultivation of skilled personnel, young leaders, and high-potential talents within the Company, thereby fostering long-term talent growth and enhancing the reserve of key personnel. We have institutionalized open selection of talented young managers. A number of young managers have taken new leadership positions. In order to consolidate and enhance qualities and skills of management staff and employees at all levels, we organize trainings continuously. In 2025, the average number of training hours per employee of the Group reached 142.37 hours.
---
# Human Capital
## Personnel Training System
The Company entered into personnel training cooperation agreements with a number of universities in the PRC, pursuant to which some of the new employees begin studying nuclear power-related professional courses during their university education. Based on the division of nuclear power operations, nuclear power engineering, nuclear power technology and management, the Company has formed a training system for all employees with “training, assessment, authorization, appointment” as the basic process.
Nuclear power reactor operators are the key technical staff in NPPs. According to the relevant requirements of the Regulations of the People’s Republic of China on the Safety Supervision and Administration of Civil Nuclear Facilities (《中華人民共和國民用核設施安全監督管理條例》) and the Regulations on the Qualification Management of Civil Nuclear Facility Operators (《民用核設施操作人員資格管理規定》), operators should hold a “Reactor Operator License”, shift supervisors should hold a “Senior Reactor Operator License”, while the qualification of reactor operators and senior reactor operators is recognized through systematic assessment of abilities which are supervised and licensed by the national regulatory authority.
We set a position of safety technical advisor (“**STA**”) in our NPPs. They are responsible for safety supervision of NPPs and conduct independent assessment and supervision on nuclear safety of daily operation of units. Same as the shift supervisors, a STA is required to hold a “Senior Reactor Operator License”. In addition, a STA shall have a deep understanding of the regulations on nuclear safety, standards of designing NPPs, analysis methods of nuclear safety and other aspects.
---
# Training Process for Reactor Operators
## New Recruit
**Duration:** 3 years
- **Basic theoretical knowledge training**
- **Basic safety authorization training**
- **On-the-job training**
- **Selection of "Trainee reactor operator"**
- Interview
- Psychological quality assessment
- Actual competency assessment
- Interview and written examinations
## Trainee Reactor Operator
**Duration:** 1.5 years
- **"Trainee reactor operator" training**
- **National regulatory authority: Examinations for reactor operator license**
- Written examinations
- Simulator examinations
- Interview
## Reactor Operator
**Duration:** 3 years
- **Reactor operator on-the-job training**
- **Selection of "Trainee senior reactor operator"**
- Recommended by operation unit
- Examinations at training center
- Review by NPP assessment committee
- **"Trainee senior reactor operator" training**
## Senior Reactor Operator
- **National regulatory authority: Examinations for senior reactor operator license**
- Written examinations
- Simulator examinations
- Interview
- **Isolated manager training**: On-site practice
## Supervisory Training Path
- **Deputy shift supervisor**: "shadow" training
- **Unit supervisor**: training
- **Shift supervisor**: training
Note: Licensed reactor operators are qualified to operate nuclear facilities' control systems, and licensed senior reactor operators are qualified to operate, guide or supervise the operation on nuclear facilities' control systems.
---
# Human Capital
In line with the mass construction progress of the HPR1000 nuclear power projects, we have correspondingly strengthened the nurturing of reactor operators, construction personnel, and operation and maintenance personnel. For example, in 2025, we continued to implement the plan to enhance the quality of training for reactor operators, further strengthened the coordinated management of licensed personnel training and examination preparation, and organized professional development training for instructors. In terms of skilled personnel cultivation, our eight subsidiaries obtained the qualification for independent certification of professional skill levels across 19 occupations (job types). Throughout the year, one chief technician and 17 master technicians were certified. The number of senior technicians steadily increased, and skill level certifications were completed for over 800 individuals.
## Training Resources
As there are many major operating risks associated with nuclear power units in operation, we have prepared corresponding training equipment to equip employees with proficient operational skills before they operate on-site equipment. For example, to train reactor operators, we have simulators that replicate the main control room of a NPP on a 1:1 scale. Depending on the training objectives, our simulators mainly include full-scope simulators, principle simulators, function simulators, post-accident analysis simulators, and severe accident analysis simulators.
As at the end of 2025, the allocation of simulators across our nuclear power sites was as follows:
| Nuclear Power Site | Full-scope simulators (set) | Principle simulators (set) | Function simulators (set) | Post-accident analysis simulators (set) | Severe accident analysis simulators (set) |
| :--- | :---: | :---: | :---: | :---: | :---: |
| Daya Bay Nuclear Power Site | 4 | 2 | 1 | 1 | 1 |
| Yangjiang Nuclear Power Site | 3 | 0 | 0 | 0 | 3 |
| Taishan Nuclear Power Site | 1 | 0 | 0 | 1 | Under construction |
| Fangchenggang Nuclear Power Site | 2 | 0 | 0 | 0 | 2 |
| Ningde Nuclear Power Site | 2 | 0 | 1 | 1 | 1 |
| Hongyanhe Nuclear Power Site | 3 | 0 | 1 | 1 | 1 |
| Huizhou Nuclear Power Site | 1 | 0 | 0 | 0 | 1 |
| Lufeng Nuclear Power Site | 1 | 0 | 0 | 0 | 0 |
For maintenance technique training, we have 173 skill training rooms (including the refuelling training facilities) with a total area of about 111,700 square meters, covering all maintenance areas and skills, which can carry out 546 skills training sessions. In particular, the Nuclear Fuel Operation Training Center is the only training and qualification examination certification centre in the PRC for nuclear fuel operators which simulates real situations. In 2025, 12 fuel operators were trained, including 8 fuel operators from domestic counterparts.
---
The Company develops and improves a corresponding curriculum and enhances the courses based on the job training programmes. As at the end of 2025, we had a total of more than 16,000 courses, adopting forms including in-person training, online training, mobile-app training and courses in other forms to meet the Company's business development needs at the current stage.
We attach great importance to the sharing of experience from employees and have, for many years, established a system where key employees act as part-time instructors to enrich our training resources. Currently, we have 216 full-time instructors and over 2,800 part-time instructors. Our management participates in tutoring to share their knowledge and experience, which has become a regular requirement for training management. Therefore, it is no longer included in the statistics of training hours.
## Forms of Training
Our training encompasses in-person training, online training, and a mix of both, alongside staff skill competitions across major fields. Through adopting scientific, standardized and professional approaches, we continuously innovate competition formats, elevate competition standards, and broaden the avenues for technical exchange among employees. In 2025, we participated and organized a national professional skills competition. 207 competitions at the base level were conducted. The wide range of skill competitions diversified our training forms, fostered a robust learning environment, and enhanced the overall quality of our staff.
## Achievements of Talent Cultivation
Relevant qualification of employees provides firm support and professional assurance on the Company's strategic development and business expansion.
With reference to our man-power allocation of reactor operators in NPPs, the reactor operators holding valid licenses of the Company can fulfill the staffing requirement for managing dozens of nuclear power generating units at the same time. As at December 31, 2025, the Group (including associates and joint ventures) had 443 reactor operators and 837 senior reactor operators holding valid licenses. The ability and qualification requirements of HPR1000 reactor operators are different from those of other nuclear power technologies. These operators need to obtain a separate license. The Company trained 135 reactor operators and 139 senior reactor operators for HPR1000 reactors, which can meet the staffing requirements of operating 4 HPR1000 nuclear power generating units at the same time. 249 employees of the Group (including associates and joint ventures) obtained licenses for reactor operators in 2025.
---
# Human Capital
As at December 31, 2025, a total of 3,269 employees obtained or maintained registered qualifications in respect of construction projects, including 20 registered First Class Architects; 2 registered Second Class Architects; 25 pressure conduit design examiners; 113 registered utility engineers; 41 registered first class structure engineers; 9 registered second class structure engineers; 88 registered electrical engineers; 123 registered consultant engineers; 27 pressure vessel design examiners; 1,232 special operation qualification holders; 462 registered supervising engineers; 126 registered equipment supervising engineers; 399 registered nuclear safety engineers; 450 registered first class constructors; and 152 registered cost engineers. In addition to its principal businesses, the Company has the ability to carry out other engineering project management and general contracting services.
In addition, as at the end of 2025, 180 employees of the Group (including our associates and joint venture) participated in the training for fuel operators and passed the certification examination to obtain the qualification for fuel operators.
In 2025, we achieved great honors in talent cultivation. Cao Jianguang and Wu Jiong from the production line were awarded the titles of “Chief Technician” and “Technical Expert of Central State-Owned Enterprises”, respectively, while Xue Jiaxiang from the R&D line was awarded the title of “Outstanding Young Technological Talent of Central State-Owned Enterprises”. These honors were not only rewarding individuals, but also affirming our years of efforts in talent cultivation. These professional talents provided strong support for the safe and stable operation of our nuclear power generating units.
# Remuneration System
Remuneration as returns to employees for their performance of duties and creation of values is a reflection of their value. We use employees’ duties, capacities and performance as the basic standards to assess their value.
Pursuant to the national laws and regulations and in light of the industry characteristics, the Company has established a strategy-aligned, competitive and incentive-driven remuneration management system. The remuneration structure of the Company is mainly in the form of a position-based wage system, under which the Company determines employees’ basic remuneration level based on their duties and capabilities (skills) in the principle of “remuneration based on duties and capabilities, remuneration changes with position, remuneration based on performance, and adjustment based on capabilities and performance”. The Company has also established a performance-linked remuneration system under which the performance bonus is adjusted based on the performance of employees. Total labor costs for the year ended December 31, 2025 amounted to approximately RMB12,902.0 million (exclusive of our associates and joint ventures).
The Company highly values the protection of employees’ rights and interests, and has registered and paid social insurance (with 100% coverage) for employees in accordance with laws and regulations. We have also established supplementary medical insurance and enterprise annuity to provide employees with multi-level protection. We attach high importance to the health of our employees and organize annual health checkups for employees. In addition, according to the national laws and our actual circumstances, we have set up a leave management policy that allows employees to have paid leave, encouraging employees to reasonably arrange their time off for work-life balance.
---
# Occupational Health Management
We attach high importance to the occupational safety and health of our employees. By strictly adhering to the national occupational health management related laws and regulations, departmental rules and technical standards requirements, the Company has established a comprehensive occupational health management system. All NPPs have set up occupational health management units, and assigned full-time occupational health management personnel to be responsible for the occupational health management of the NPPs, and obtained the certification of the ISO45001 occupational health and safety management system.
## Identification and management of potential occupational hazards
1. Identify, monitor and evaluate potential occupational hazards in various places and various types of operations;
2. undertake classified and graded management of the risks of potential hazards and harms; and
3. adopt a series of measures and means such as technologies, management and individual protection.
## Professional inspection by external organizations
1. Engage external professional organizations to undertake occupational health inspections and work suitability evaluations for employees in positions exposed to occupational hazards, and establish individual health monitoring records; and
2. conduct individual and group health analysis.
## Full participation and proactive prevention
The Company emphasizes the full participation and proactive prevention regarding occupational health and focuses on the continuous improvement in working conditions and control of occupational hazards. We actively carry out occupational hazard monitoring:
1. implement source control through engineering protection measures in workplaces with severe occupational hazards to continuously improve working conditions;
2. conduct on-site independent monitoring and evaluation of occupational hazard factors in our daily work to identify occupational health and safety risks, and take timely control measures; and
3. equip the workplaces with potential occupational health hazards with protective gear such as ear protectors, protective suits and protective shoes, and set time limits for on-site work.
## Publicity, training and warning
1. Undertake publicity and training campaigns on occupational hazards; and
2. display warning signs and on-site monitoring results in workplaces.
---
# Human Capital
In addition to physical health, the mental health of employees is equally important. We continued to implement the "Employee Assistance Program" to protect the mental health of our employees by inviting professionals to provide professional services such as 7×24 hours of psychological consultation and counselling. In 2025, the Group organized 235 consultation and training sessions, with more than 8,000 participants across various "Employee Assistance Program".
Due to contractors' direct participation in a large number of construction and operation activities of NPPs, we assume the responsibilities of ensuring employees' occupational health and safety not only with our Company's own employees, but also employees of contractors and other persons who have normal access to NPPs to carry out the relevant activities. The maximum individual radiation dose rate of workers entering control zone of each NPP operated and managed by us (including employees, contractors and other persons) is far lower than the management target value of NPP and also far lower than the limit of national laws and regulations. For details of maximum individual radiation dose rate of NPPs, please refer to the 2025 ESG Report published by the Company.
In addition to the management measures mentioned above, we pay extra attention to all the safety incidents in the work process. We thoroughly investigate all incidents and conduct root cause analysis, exchange feedbacks among our NPPs, enhance the safety awareness of staff and contractors, and adopt a series of measures to improve safety management and avoid recurrence of such incidents. We strive to consistently lower the rate of industrial accidents. In 2025, the Company maintained a good performance in occupational safety and health. All NPP staff were able to complete the relevant work safely and efficiently in accordance with the procedures. For details of the performance in relation to occupational safety and health issues as well as mental health of employees, please refer to the 2025 ESG Report published by the Company.
---
# Financial Capital
**Our capital needs mainly come from the capital expenditure for construction of NPPs and facilities, payments of debts and interests, and operating expenditure in nuclear power projects in operation. The sources of capital include cash generated from operating activities, shareholders’ cash investment, bank borrowings and bond issuance.**
## External Financing Environment
In 2025, China’s economy forged ahead against headwinds, in pursuit of innovation-driven and high-quality development. China’s GDP reached RMB140.2 trillion, representing a year-on-year increase of 5.0%, with major macroeconomic indicators sustaining stable and positive momentum, and the price level being generally stable. In 2025, the moderately accommodative monetary policy in China effectively supported the development of the real economy, while liquidity in the banking system remained reasonably adequate and market interest rates steadily declined. At the same time, the RMB exchange rate fluctuated significantly in both directions, and the subsequent fluctuations in exchange rate continued to require close attention.
## Financing Patterns
In 2025, the Company comprehensively strengthened the organization, coordination and risk monitoring of financing activities, made full use of various financing channels, and promoted project financing and debt swaps, thereby ensuring capital security and controlling financing costs. At the same time, the Company continuously monitored its exposure to the foreign currency debt exchange rate risk, exercised control over new debts denominated in foreign currencies, and prevented the risk of exchange rate fluctuations through various measures including forward transactions.
## Equity Financing
In line with the Company’s needs for business development, we strengthen our long-term capital with equity financing in a timely manner, and optimize our overall capital structure in response to changes in the external environment, which consolidate and enhance our ability to withstand risks arising from fluctuations in the external economic and financial environment, thereby promoting the sustainable development of the Company’s business. For those projects with high capital expenditure and good earnings forecasts, we will prudently consider the use of equity financing to balance the risks and to enhance shareholders’ value.
## Financing Through Convertible Corporate Bonds
On February 13, 2025 and March 19, 2025, the application made by the Company for the issuance of A-share convertible corporate bonds was approved upon review by the SZSE and approved for registration by the CSRC, respectively. On July 15, 2025, the Company completed the issuance of these A-share convertible corporate bonds, which were listed on the SZSE on July 25, 2025.
---
# Financial Capital
## Debt Financing
We strive to maintain diversified types of debt financing to establish a financing model with a mixture of short, medium and long-term funds, a combination of direct financing and indirect financing, and the coexistence of various channels to provide a sound and economic source of funding for the Company. In the course of debt financing, we always follow the balance of cost and safety principle. We seek to obtain competitive financing cost, but minimizing cost of financing is not the only goal as it would otherwise impair financing safety and the service quality we receive.
### Diversified Financing Instruments
Diversified financing instruments help avoid reliance on a single financing channel and ensure we have adequate options to meet different types of capital needs. Given the characteristics of our large-scale, long-term project investments and according to our principle to match assets and liabilities, our debt financing instruments are dominated by long-term bank borrowings, as supplemented by short-term bank borrowings and bond financing, with borrowings from other financial institutions special-purpose funds as complementary sources. The major debt financing channels of the Group include borrowings from banks and other institutions (accounted for approximately 94.9%), A-share convertible bonds (accounted for approximately 1.8%), medium-term notes (accounted for approximately 1.8%), and proceeds from the SASAC’s Special Bonds for Stabilizing Growth and Expanding Investment (accounted for approximately 1.5%), etc. Compared with the end of 2024, as at the end of the reporting period, the total borrowings of the Group increased by approximately RMB36,945.8 million, mainly due to the increase in debt financing by the Company in line with the investment progress of nuclear power generating units under construction.
### Borrowings from Banks and Other Institutions
We mainly use long-term bank loans to meet the long-term and stable funding needs of nuclear power investment projects. Reasonable loan terms and repayment schedule are set to match our long-term cash flow, reduce refinancing risk and ensure the safety of our overall debt. We also use short-term bank borrowings to bridge the shortfall in working capital. In 2025, the Group continued to strengthen communication with its banking partners, seizing the market opportunity to secure new loan financing, and reduced the existing loan interest rates through debt swaps and restructuring.
### Bond Financing
The Company is a legal entity incorporated in the PRC and is qualified for the domestic public offering of debentures. In February 2025, the Company seized the opportunity in the bond market to issue a tranche of medium-term notes, with a financing size of RMB2,400.0 million, which effectively met capital needs and reduced financing costs. The registration of multi-type interbank debt financing instruments (“TDFI”) of the Company was approved at 2024 annual general meeting of the Company in May 2025. The Company completed the TDFI registration with the National Association of Financial Market Institutional Investors in September 2025. The financing notes or notes that may be issued under the TDFI include ultra short-term financing notes, short-term financing notes, medium-term notes, asset-backed notes, green debt financing instruments and privately placed debt financing instruments, which can be used to meet the Company’s needs for replenishing working capital, debt repayment, and project capital expenditures.
---
The Group’s outstanding debentures as at December 31, 2025, and the Group’s repaid debentures in 2025 were as follows:
# Medium-term notes
## Issuance in the past three years (not yet due for repayment)
| Date of issuance | Financing amount (RMB million) | Term (years) | Use of proceeds |
| :--- | :--- | :--- | :--- |
| September 2024 | 2,400.0 | 3 | Repayment of bonds upon maturity for the Company and repayment of borrowings from financial institutions for subsidiaries |
| February 2025 | 2,400.0 | 3 | Repayment of bonds upon maturity for the Company and repayment of borrowings from financial institutions for subsidiaries |
## Repayment upon maturity this year
| Date of repayment | Repayment amount (RMB million) | Date of issuance | Term (years) |
| :--- | :--- | :--- | :--- |
| February 2025 | 2,500.0 | February 2022 | 3 |
# Ultra short-term financing notes
## Repayment upon maturity this year
| Date of repayment | Repayment amount (RMB million) | Date of issuance | Term (days) |
| :--- | :--- | :--- | :--- |
| March 2025 | 1,500.0 | June 2024 | 268 |
| May 2025 | 1,000.0 | August 2024 | 268 |
---
# Financial Capital
## Reasonable Currency and Term Structure
Since the sales revenue and procurement costs of the Company are mainly denominated in RMB, we maintain a RMB-dominated debt structure, which not only aligns with our prudent operational characteristics, but also effectively mitigates our liquidity risks and systematic exchange rate risks. As at December 31, 2025, the proportion of borrowings that were denominated in RMB amounted to approximately 99.7%, whilst the borrowings denominated in foreign currency amounted to approximately 0.3%. Borrowings denominated in foreign currency are primarily used to procure equipment and spare parts as well as related services from overseas markets.
The construction and operation of nuclear power projects have relatively long cycles, therefore our debts mainly comprise long-term debts. Meanwhile, to meet the requirements of the Company’s liquidity management, we also intend to gradually repay the project debts with the revenue generated from our projects in the future through matching the decentralized and orderly repayment schedules with long-term cash flow from the Company’s nuclear power projects. In 2025, the Company adjusted term structure of debts based on market conditions and its risk aversion capability, and balanced the financing risks and return. As at December 31, 2025, the proportion of the Group’s short-term debts accounted for approximately 26.5% of total debts, whilst long-term debts accounted for approximately 73.5%.
## Debt Risk Management
### Effective response to foreign exchange rate and interest rate risks
We always uphold a prudent approach to carry out debt hedging and risk prevention arrangements under a well-established debt risk management system. Our objective of debt risk management is cost control instead of profit, and adhere to the principle of hedging and prohibiting speculative transactions. All the hedging transactions shall be on the basis of factual debt cash flow or guaranteed payment of commercial contracts, while simple instruments shall be mainly applied for hedging financial risk only.
- Integration of unified planning at headquarters and management on individual projects
- Affordable cost
- Insisting on hedging, forbidding speculative transactions
- Dynamic tracking, risk control
- Prevention first, debt hedging transactions supplemental
- Simple instruments first
---
Exposure of foreign currency debts as at the end of the reporting period was mainly the Euro export credit of Taishan Nuclear. In recent years, we have proactively eliminated our exposure to risk on foreign exchange rate associated with debts denominated in foreign currencies by stages and in batches through forward transactions, and actively changed our financing methods for foreign business contracts to exercise control over new debts denominated in foreign currencies, thereby effectively reducing the impact of major risks in exchange rate. In 2025, GNPJVC engaged in forward exchange settlement transactions with a contract size of RMB71.4 million with CGN Finance for hedging purposes, achieving its objective of mitigating exchange rate risks; Taishan Nuclear engaged in forward exchange purchase transactions with a contract size of EUR80.0 million with banks for hedging purposes in 2024. Such contracts were settled during the reporting period, achieving the objective of mitigating exchange rate risks. Compared with the end of 2024, the total amount of borrowings denominated in foreign currency of the Group at the end of the reporting period decreased by an equivalent of approximately RMB657.9 million. In 2026, the Company will continue to closely monitor the market and actively adopt measures to minimize the impact of foreign currency exchange rate fluctuations.
In 2025, the Company continued to promote lean management, leveraged the monetary easing policy in the market, and effectively reduced its debt financing costs by making full use of its internal capital, repayment in advance, loan swaps, interest rate restructuring and other means.
## Limited recourse or non-recourse financing methods
For nuclear power project financing, we usually arrange the nuclear power project company as the financing subject. In principle, we do not provide guarantee for project companies. We strictly control certain guarantees, such as warranty, security and pledge, in the financing process, and do not permit our subsidiaries and affiliated companies to provide guarantees in any form to external entities or individuals without approval. Subsidiaries and affiliated companies are also not allowed to provide guarantees for each other.
Nuclear power project companies raise debt funds by limited recourse or non-recourse financing methods. They mainly repay the principal amount and interest with sales revenue or other income generated from such projects. Creditors have no recourse rights or limited recourse rights to project shareholders.
## Proper financial leverage
We attach high importance to our financial leverage and shall continue to undertake its optimization. On the one hand, we achieve good shareholder returns through the proper financial leverage, and on the other hand, we avoid excessive debt financing in the course of business expansion that may hurt our financial health. As at December 31, 2025, the Group’s asset-liability ratio was 65.2%, higher than that of 2024, which was mainly due to the increase in total liabilities as a result of the increase in debt financing by the Company in line with the investment progress of nuclear power generating units under construction.
---
# Financial Capital
## Adequate liquidity
To manage liquidity risks, we monitor and maintain our cash at bank and in hand as well as the level of banking facilities to ensure that such amounts can provide sufficient cash support for our operation while avoiding having excessive idle funds.
As of December 31, 2025, we had unutilized general banking line of credit of approximately RMB432,230.1 million, TDFI of up to RMB25,200.0 million available for public issuance at any time, and cash at bank and in hand of approximately RMB20,826.7 million, which can provide sufficient cash for the operations of the Company and mitigate the effects of fluctuations in cash flows.
## Maintaining a good credit rating
In September 2025, China Chengxin International Credit Rating Co., Ltd. (中誠信國際信用評級有限責任公司) assessed the credit rating of the Company and the credit rating of the A-share convertible bonds, and based on the reasons that “the Company has nuclear power generating units of high quality, significant and growing scale, and the regions where the Company operated have high economic development level and huge demand for electricity”, it concluded that “the Company has a huge volume of on-grid power generation, and strong profitability and cash generating ability” and maintained our AAA credit rating with stable outlook, as well as maintained the AAA credit rating of the A-share convertible bonds.
---
# Environmental Capital
**Our commitment to social responsibility and the cornerstone for our sustainable development are providing the society with safe, reliable, clean and economical electricity on a consistent basis, making the sky bluer and the water clearer. We attach great importance to the harmony between our nuclear power operations and the natural environment, and always uphold a highly responsible attitude to the environment to ensure our healthy, stable and sustainable development.**
We hereby describe the policies and mechanisms of the Group with respect to the management of radioactive wastes and environmental monitoring. In addition to radioactive waste treatment, our NPPs have installed non-radioactive sewage treatment facilities and hazardous solid waste storage facilities. Various environmental protection facilities are in normal operation and in compliance with legal standards and regulatory requirements. All pollutants are discharged in accordance with regulatory standards. For more details regarding the environmental management of the Group, please refer to the 2025 ESG Report published by the Company.
## Radioactive Waste Management
NPPs generate Three Wastes while generating electric power, and these radioactive wastes require proper management and safe disposal to protect the public and the environment. There are strict and specific regulations and requirements in all countries in respect of the disposal of radioactive wastes from NPPs and the control of the discharge of them to the environment. High-level radioactive wastes from NPPs are mainly spent fuels which are used fuel assembly removed from the reactor. Such spent fuels must be reprocessed in accordance with the national unified planning. Radioactive waste management as described herein mainly refers to low to medium level radioactive waste management.
The Company has established a comprehensive mechanism for radioactive waste treatment, which has integrated into the complete production and operation procedures of NPPs. We have adopted the guiding principle of “minimizing waste” and “optimizing radioactive protection” for Three Wastes treatment, strictly complied with national laws, regulations and standards, and strived to minimize waste produced. In respect of emission standard, we have proactively implemented radioactive waste management and adopted the highest standards. Hence, our emission is much lower than the emission standard as permitted by the state. The treatment facilities of Three Wastes are operating well. Please refer to the section headed “Business Performance and Analysis” of this Annual Report for details of the amounts/percentages of radioactive waste of our NPPs in 2025.
In addition to radioactive waste treatment, our NPPs have installed non-radioactive sewage treatment facilities and hazardous solid waste storage facilities. Various environmental protection facilities are in normal operation and in compliance with legal standards and regulatory requirements. All pollutants are discharged in accordance with regulatory standards.
---
# Environmental Capital
## Environmental Monitoring
All of our nuclear power sites have established strict environmental monitoring system and environment routing inspection record system according to the requirements of the national regulatory authority, so as to monitor and analyze the environmental media of air, water, soil, land species and marine organisms within a radius of ten kilometers of our NPPs on an ongoing basis, and to assess the environmental standard within NPP and surrounding regions and reduce the impact of NPP operation on the surrounding environment.
In addition to self-monitoring of NPPs, national regulatory authorities and third-party external organizations also monitor the environment of NPPs.
The national regulatory authority implements the “dual-track system” monitoring on gaseous and liquid effluents as well as the external environment in the periphery of NPPs. Such monitoring shall be carried out by the operators of NPPs and the radiation environment monitoring agencies under the ecological and environmental authorities of the provinces in which NPPs are located, respectively.
According to the long-term tracking and monitoring by the external institutions such as the Hong Kong Observatory, the monitoring results of each of our NPPs in service since its operation show that environmental radioactivity in the surrounding area has not changed compared with the background data before the NPPs commenced commercial operations, and the biological population of land and sea in these regions has not changed either, so there was no adverse impact on the environment. According to the ongoing monitoring by the national regulatory authority, the air-absorbed dose rates of environment around NPPs in operation stay within the fluctuation range of local natural background radiation level.
---
# Social and Relationship Capital
**The construction and operation of NPPs have extensive influence. The understanding, trust and support from the society, the public, shareholders and other stakeholders are crucial guarantees for our sustainable development.**
We herein briefly describe the policies and practices of the Group with respect to the society and the public. Our communication with shareholders and investors are set out in the section headed “Corporate Governance” of this Annual Report. Please refer to the 2025 ESG Report published by the Company regarding the exchange between the Company, the society, the public, and other cooperation partners as well as other matters.
## Proactive Disclosure of Information
All nuclear power sites in operation managed by us have established public information platforms on nuclear and radiation safety. The information made available to the public includes NPPs’ monthly operational data (capacity factor, radiation protection, industrial safety, level 1 fire risk incidents, Three Wastes management and environmental monitoring) and incident details. All nuclear power stations must announce the information in relation to any event occurring after the nuclear power generating unit is loaded with nuclear fuels on their information disclosure platforms within two calendar days (excluding the day the event is defined) from the date the event is defined in accordance with relevant regulations. In 2025, all nuclear power sites disclosed the relevant information within the specified timeframe as required.
Every nuclear power site managed by us has established its own websites and social media platforms such as the official WeChat account for delivering its operational information proactively. The Company arranges regular press conferences, interviews and site visits by invitation, theme activities and distribution of publications to provide NPPs’ related information to the competent industry regulatory departments and the media, and takes public inquiries through hotlines, facsimile and e-mail. In 2025, the Group convened nine media communications and press conferences.
---
# Social and Relationship Capital
## Transparent Public Communication
We adhere to transparent communication, constantly explore open and transparent communication mechanisms, and increase efforts to promote public awareness of nuclear power. We actively engage in interactive exchanges in cities, campuses and communities, helping the public gain a comprehensive understanding of nuclear power in order to enhance public confidence in nuclear power.
## Participating in exhibitions
In 2025, we participated in over 10 major domestic and international exhibitions, including the 22nd China-ASEAN Expo, the 2025 International Digital Energy Expo, the 4th China Nuclear Energy High Quality Development Conference & Shenzhen International Nuclear Energy Industry Innovation Expo, the 2025 China Hi-Tech Fair, and the 2025 World Nuclear Exhibition in France.
---
# Reaching the campus
Looking to the future, we place special emphasis on engaging the younger generation. Through expert lectures, the first lesson of the new semester, interactive science knowledge introduction roadshows, and featured hands-on experiments, we promote understanding of clean energy with a focus on nuclear power, among young people and the public. In 2025, we launched innovative science knowledge introduction roadshows featuring 12 special interactive exhibits nationwide, which visited 18 prefecture-level cities across 13 provinces, reaching millions of people online and offline. The initiative received feature coverage from relevant national ministries and commissions, China News Service, and other platforms and mainstream media, enhancing the awareness of the science knowledge of clean energy, nuclear safety culture and green development concepts among young people.
Science knowledge introduction roadshows were conducted at four campuses in Beijing
A science knowledge introduction roadshows was conducted at a primary school in Shanghai
---
# Social and Relationship Capital
## Public Open Day
In 2025, we launched the 13th session of the "8·7 Public Open Day" campaign, bringing together 80 junior high school students from Guangdong, Hong Kong, Macao and the Inner Mongolia Autonomous Region at the Daya Bay Nuclear Power Site for an in-depth four-night, five-day nuclear study tour. The curriculum covered core topics including nuclear energy principles, safety culture, green practices, and cutting-edge technologies. Over 20 mainstream media outlets and official websites, such as People’s Daily and China National Radio, posted more than 40 articles for the campaign. The live broadcast of the main event attracted over 450,000 views, with related topics garnering more than 270 million views and over 481,000 interactions.
---
# Win-win Community Development
We uphold the vision of "boosting the economy and benefiting the people of the place in which we develop a project". We actively promote community development and build harmonious and friendly relations with surrounding areas while achieving corporate growth. In response to the national rural revitalization strategy, we continue to promote rural revitalization in Guangxi Zhuang Autonomous Region, Guangdong Province, Fujian Province and other regions, in order to constantly improve the livelihood of local residents and develop characteristic local industries, thereby consolidating and expanding the achievements made in poverty alleviation.
Taishan Nuclear took the opportunity of organizing the Taishan Adolescents Science and Technology Innovation Contest to hold the "CGN Neighbourhood Festival", which attracted enthusiastic participation from teachers and students of over 20 primary and secondary schools in the city. A total of 1,050 technology-related works were collected, demonstrating the strong interest of young people in nuclear technology, and fostering cultural exchange and emotional ties between the enterprise and the local community.
---
# Social and Relationship Capital
Yangjiang Nuclear has consistently carried out the "Awards for Teaching and Learning" initiatives, actively supporting the development of rural education in surrounding areas as part of its commitment to giving back to society and promoting shared prosperity between the enterprise and the local community. In 2014, the company established the "Yangjiang Nuclear Eaglet Scholarship" in Yunbo Village to recognize and reward the students from Yunbo Village who performed well in the annual college and high school entrance examinations. A total of 366 students have received the "Yangjiang Nuclear Power Eaglet Scholarship".
In June 2025, prolonged drought caused a continuous decline in the reservoir water level in Huangbu Town, Huidong County, posing severe challenges to the local community’s access to daily water. In response, Huizhou Nuclear carried out a series of actions to deliver "timely water" to both the parched land and the local community.
---
# Dedicated to Social Welfare
We actively participate in social welfare and charitable activities, extend support to disadvantaged groups in the society, and continuously give back to the community.
We encourage and support employees to engage in various volunteer activities, and push for launching structured and regular public welfare initiatives. In 2025, we had 10,715 employee volunteers, participating in more than 360 public service activities.
---
# CORPORATE GOVERNANCE
- 94 Board of Directors and Senior Management
- 101 Corporate Governance Report
- 154 Directors’ Report
- 172 Audit and Risk Management Committee Report
- 174 Remuneration Committee Report
- 176 Nomination Committee Report
- 178 Nuclear Safety Committee Report
- 179 Risk Management Report
---
Since the provided image consists entirely of a decorative photograph without any headings, body text, lists, or tables, there is no extractable data to convert into structured markdown according to the specified rules.
---
# Board of Directors and Senior Management
As at December 31, 2025, the biographies of our Directors and senior management are as follows:
## Board of Directors
### Mr. Yang Changli
**Chairman, Non-executive Director, Chairman of the Nuclear Safety Committee of the Board**
Mr. Yang Changli (楊長利), born in 1964, has served as the Chairman of the Company and the chairman of the Nuclear Safety Committee of the Board since May 2020. He has a master's degree and is a senior engineer (researcher-level). Mr. Yang Changli has over 30 years of experience in areas including nuclear power, nuclear fuel, R&D of technology as well as safety and quality management. He served as a member of the party leadership group and the deputy general manager of CNNC from July 2006 to January 2020; and the deputy secretary of the party committee and a director of CGNPC from January 2020 to February 2020. From February 2020 to July 2020, he served as the deputy secretary of the party committee, a director and the general manager of CGNPC. He served as the secretary of the party committee, chairman and the general manager of CGNPC from July 2020 to July 2021. He has served as the secretary of the party committee and the chairman of CGNPC since July 2021.
### Mr. Pang Songtao
**Executive Director and President**
Mr. Pang Songtao (龐松濤), born in 1971, has served as an executive Director and the President of the Company since December 2025. He has a master's degree and is a senior engineer (researcher-level). Mr. Pang Songtao has more than 30 years of experience in the nuclear power industry. He served as the deputy general manager of the nuclear power operation department of CGNPC and the deputy general manager of CGN Operations from September 2012 to September 2014. He concurrently served as a director of Fangchenggang Nuclear from April 2012 to October 2014. He successively served as the deputy secretary of the party committee, director, general manager, executive director and the secretary of the party committee of China Nuclear Power Technology Research Institute Co., Ltd. (中科華核電技術研究院有限公司) (now known as CNPRI) from September 2014 to June 2017. He also served as the deputy general manager of CGNPC from June 2017 to May 2018, during which he concurrently served as the secretary of the party committee, executive director and general manager of CNPRI from June 2017 to April 2018, served as a member of the standing committee of the party committee and deputy general manager of CGNPC from May 2018 to October 2025, served as a non-executive Director of the Company from October 2023 to December 2025, and has served as the deputy secretary of the party committee, director and general manager of CGNPC since October 2025.
---
## Ms. Li Li
Non-executive Director
Ms. Li Li (李歷), born in 1969, has served as a non-executive Director of the Company since October 2023. She has a master’s degree and is a lawyer. Ms. Li Li has more than 30 years of experience in macroeconomics, administrative management, law, supervision of state-owned assets and other areas. She served as an inspector and director-level cadre of the SASAC from February 2013 to July 2021, during which she served as a member of the Standing Committee of the Municipal Party Committee and vice mayor (department-level) in Huanggang, Hubei Province from February 2015 to May 2016. She has served as the deputy secretary of the party committee and director of CGNPC since July 2021, and the deputy secretary of the party committee of the Company since July 2021.
## Mr. Feng Jian
Non-executive Director
Mr. Feng Jian (馮堅), born in 1967, has served as a non-executive Director of the Company since February 2023. He holds a postgraduate degree and is an accountant. Mr. Feng Jian has extensive experience in corporate management, financial management, investment management and other areas. From October 2012 to August 2021, he successively served as the deputy general manager and vice chairman of Guangdong Hengjian Hezi Medical Industry Co., Ltd. (廣東恒健核子醫療產業有限公司), the executive director and general manager of Zhuhai Hengqin Hengtaian Investment Co., Ltd. (珠海市橫琴恒泰安投資有限公司), the executive director of Guangdong Hengtaian Investment Co., Ltd. (廣東恒泰安投資有限公司), and the chairman of Guangdong Agricultural Supply Side Structural Reform Funds Management Co., Ltd. (廣東省農業供給側結構性改革基金管理有限公司). He has served as the deputy general manager of Hengjian Investment since August 2021 and concurrently served as a supervisor of China Southern Power Grid Company Limited from November 2022 to December 2024.
---
# Board of Directors and Senior Management
## Mr. Liu Huanbing
**Non-executive Director**
Mr. Liu Huanbing (劉煥冰), born in 1973, has served as a non-executive Director of the Company since October 2023. He has a master’s degree and is a senior accountant (researcher-level). Mr. Liu Huanbing has more than 25 years of experience in financial management, investment and financing management and other areas. He served as the chief accountant of China Nuclear (Tianjin) Machinery Co., Ltd. (中核(天津)機械有限公司) from July 2015 to October 2020, and the chief accountant of China Nuclear Energy Industry Corporation (中國原子能工業有限公司) from October 2020 to September 2022. He has served as a director of China Nuclear Finance Company Limited (中核財務有限責任公司) since September 2021, and the chief accountant of China Nuclear Power Co., Ltd. (中國核能電力股份有限公司), a nuclear power generation company, the shares of which are listed on the Shanghai Stock Exchange (stock code: 601985), since November 2022. He served as the chairman of the supervisory committee of CNNC Nuclear Power Operation Management Co., Ltd. (中核核電運行管理有限公司) from April 2023 to June 2025, and has served as a director of CNNC Financial Leasing Company Limited (中核融資租賃有限公司) since April 2023.
## Mr. Wong Ming Fung
**Independent non-executive Director, Chairman of the Remuneration Committee of the Board**
Mr. Wong Ming Fung (王鳴峰), born in 1971, has served as an independent non-executive Director of the Company and the chairman of the Remuneration Committee of the Board since October 2023. He has a doctoral degree and is a senior counsel in Hong Kong. He is also an overseas member of the British Chancery Bar Association. With extensive experience in law and other areas, Mr. Wong Ming Fung served as a non-executive director of the Hong Kong Securities and Futures Commission, a member of the Hong Kong Insurance Appeals Board, the chairman of the International Law Committee and chairman of the China Business Development Committee of the Hong Kong Bar Association, the chairman of the Arbitration Committee of the Hong Kong Bar Association, a deputy judge of the Court of First Instance in Hong Kong and the chairman of the board of directors of the Investor Compensation Company Limited from August 2014 to September 2021. He was the vice chairman of the Hong Kong Board of Review (Inland Revenue Ordinance) from July 2016 to December 2024. Since September 2020, he has been a director of the Airport Authority Hong Kong. He has been a special judge of the Court of First Instance in Hong Kong since September 2021. He was an external director of Sinochem Holdings Corporation Ltd from January 2022 to December 2024. Since June 2023, he has also served as a member of the Basic Law Committee of the Standing Committee of the National People’s Congress. Since October 2023, he has been a director of Hong Kong-Shenzhen Innovation and Technology Park Limited.
---
## Mr. Li Fuyou
**Independent non-executive Director, Chairman of the Nomination Committee of the Board**
Mr. Li Fuyou (李馥友), born in 1955, has served as an independent non-executive Director of the Company and the chairman of the Nomination Committee of the Board since August 2020. He has a bachelor’s degree and is a senior engineer (professor-level) and received a special government allowance from the State Council. Mr. Li Fuyou has extensive experience in energy, coal and safety management, and served as a vice president of China Coal Energy Company Limited (中國中煤能源股份有限公司), a company listed on the Hong Kong Stock Exchange (stock code: 1898) and the Shanghai Stock Exchange (stock code: 601898) from August 2006 to September 2010, the chairman and the deputy secretary of the party committee of Shanghai Datun Energy Resources Co., Ltd. (上海大屯能源股份有限公司), a company listed on the Shanghai Stock Exchange (stock code: 600508) and the chairman of Datun Coal and Electricity (Group) Co., Ltd. (大屯煤電(集團)有限責任公司) from March 2009 to September 2010, and a member of the standing committee of the party committee and deputy general manager of China National Coal Group Corporation from September 2010 to July 2016.
## Ms. Xu Hua
**Independent non-executive Director, Chairlady of the Audit and Risk Management Committee of the Board**
Ms. Xu Hua (徐華), born in 1960, has served as an independent non-executive Director of the Company and the chairlady of the Audit and Risk Management Committee of the Board since October 2023. She has a master’s degree and is a senior accountant. Ms. Xu Hua has extensive experience in financial management, corporate management and supervision. She served as the deputy director of the Service Management Bureau (Retired Cadres Management Bureau) of the SASAC from May 2005 to December 2011. From December 2011 to October 2017, she was the deputy group leader (chief director level) of the Inspection Team of the SASAC. From October 2017 to December 2017, she served as a member of the party committee and secretary of the discipline inspection commission of China National Aviation Fuel Group Company. From December 2017 to March 2021, she was a member of the party committee and secretary of the discipline inspection commission of China National Aviation Fuel Group Limited. Since May 2022, she has been an external director of China International Engineering Consulting Corporation.
---
# Board of Directors and Senior Management
## Senior Management
### Mr. Pang Songtao
**Executive Director and President**
The biography of Mr. Pang Songtao is set out on page 94 of this Annual Report.
### Mr. Yin Engang
**Chief Financial Officer, Joint Company Secretary and Board Secretary**
Mr. Yin Engang (尹恩剛), born in 1968, has served as the chief financial officer of the Company since October 2017, and has served as the secretary of the Board and a joint company secretary of the Company since August 2020. He has a master’s degree and is a senior accountant. Mr. Yin Engang has over 25 years of experience in finance and auditing. He served as the chief financial officer of CGNPC Industry Investment Fund Management Co., Ltd. from July 2008 to March 2014, served as the general manager of the finance department of CGNPC from March 2014 to October 2017, served as a director of CGN Mining Company Limited (中廣核礦業有限公司) (a company listed on the Hong Kong Stock Exchange, stock code: 1164) from June 2014 to June 2016, and served as a director of CGN New Energy Holdings Co., Ltd. (中國廣核新能源控股有限公司) (a company listed on the Hong Kong Stock Exchange, stock code: 1811) from March 2015 to January 2018. He served as the chairman of the board of directors of GNIC from October 2020 to August 2022.
---
## Mr. Qin Yuxin
**Vice President**
Mr. Qin Yuxin (秦余新), born in 1972, has served as a Vice President of the Company since April 2021. He has a master's degree and is a senior engineer (researcher-level). Mr. Qin Yuxin has more than 25 years of experience in the nuclear power industry. He served as an assistant to the general manager of the nuclear power operation department of the Company and an assistant to general manager of CGN Operations from November 2014 to May 2016, as an assistant to general manager of CGN Operations from May 2016 to June 2016, as the deputy general manager of CGN Operations from June 2016 to May 2018, and as the general manager of CGN Operations from May 2018 to December 2020. He served as the chairman of the board of directors of CGN Operations from December 2020 to May 2024.
## Mr. Zhou Jianping
**Vice President**
Mr. Zhou Jianping (周建平), born in 1972, has served as a Vice President of the Company since January 2023. He has a doctoral degree and is a professorate senior engineer. Mr. Zhou Jianping has more than 25 years of experience in the nuclear power industry. From June 2014 to July 2018, he successively served as an assistant to the general manager and the deputy general manager of Fangchenggang Nuclear. He served as the general manager of the Safety and Quality Assurance Department of the Company from July 2018 to March 2019, the secretary of the party committee and the general manager of Fangchenggang Nuclear from March 2019 to December 2020, and the secretary of the party committee and the chairman of the board of directors of Fangchenggang Nuclear from December 2020 to February 2022. During his time as the secretary of the party committee and the chairman of the board of directors of Fangchenggang Nuclear from February 2022 to April 2022, he also served as the general manager of the Safety, Quality and Environmental Department of the Company. He served as the general manager of the Safety, Quality and Environmental Department of the Company from April 2022 to September 2023.
---
# Board of Directors and Senior Management
## Mr. Liu Haijun
**Vice President**
Mr. Liu Haijun (劉海軍), born in 1973, has served as a Vice President of the Company since January 2023. He has a master’s degree and is a senior engineer. Mr. Liu Haijun has more than 25 years of experience in the nuclear power industry. He served as an assistant to the general manager of Taishan Nuclear from May 2009 to December 2015. He also served as the general counsel of Taishan Nuclear from June 2011 to December 2012. He served as the deputy general manager of Taishan Nuclear from December 2015 to December 2020, a director of Hinkley Point C Generation Company Limited from November 2019 to September 2021, the secretary of the party committee, a director and the general manager of Taishan Nuclear from December 2020 to December 2021, and the secretary of the party committee, the chairman of the board of directors and the general manager of Taishan Nuclear from December 2021 to May 2022. From July 2021 to May 2022, he served as the chairman of the board of directors and the general manager of Taishan Nuclear Power Industry Investment Co., Ltd. (台山核電產業投資有限公司), as well as an executive director and the general manager of Taishan Second Nuclear. From May 2022 to August 2023, he served as the secretary of the party committee and the chairman of the board of directors of Taishan Nuclear, as well as the chairman of the board of directors of Taishan Nuclear Power Industry Investment Co., Ltd. Since February 2023, he has concurrently served as the general manager of the Nuclear Power Administration Department of the Company.
---
# Corporate Governance Report
## Corporate Governance Framework
The corporate governance framework of CGN Power is designed to safeguard the interests of shareholders and involves all the key participants in the corporate governance practices of the Company, reflecting the ways in which they relate to each other and their roles and functions in corporate governance.
In 2025, in order to optimize our governance structure, the amendments to the Articles of Association and abolishment of the Supervisory Committee were approved at the 2025 first extraordinary general meeting convened on October 16, 2025, upon which the Audit and Risk Management Committee of the Board shall exercise the powers and functions of the Supervisory Committee as stipulated in the Company Law. Thus, our internal governance structure comprises mainly our shareholders, the Board and the Board Committees, our internal auditors and our management and staff members. External auditors conduct independent review and assessment on the governance of the Company to help us continuously optimize our internal governance. Meanwhile, the interactions between the Company and other business-related parties, including customers, business partners, social environment and regulators, also reflect the effectiveness of our corporate governance. We are therefore fully aware of our significant corporate and social responsibilities as a public company and we need to constantly follow the best corporate governance practices.
## Brief Introduction to the Corporate Governance Code of CGN Power
The Company strives to maintain a high level of corporate governance to ensure the realization of the Company’s strategy, to protect the interests of shareholders and to enhance enterprise value. The Corporate Governance Code as set out in Appendix C1 to the Listing Rules (the "**Hong Kong Stock Exchange Code**") sets out the principles of good corporate governance and two levels of recommendations:
| With respect to code provisions | With respect to recommended best practices |
| :--- | :--- |
| Companies shall duly comply with, or give reasonable explanations for, any deviations from the code provisions. | For guidance only and companies are encouraged to comply with, or give explanations for any deviations from, the recommended best practices. |
---
# Corporate Governance Report
In accordance with the Listing Rules, the Hong Kong Stock Exchange Code and the Code of Corporate Governance of Listed Companies of the CSRC and based on the corporate governance framework of the Company, the Board has formulated the Corporate Governance Code of the Company as the corporate governance guidelines of the Company to explain the systems, procedures and measures we adopted to ensure our corporate governance standards meeting the expectations of our shareholders and other stakeholders. The Code was reviewed and approved at the fifth meeting of the first session of the Board of Directors on November 18, 2014 and its fourth revision was completed in August 2022. In view of our optimized corporate governance structure, we plan to complete the fifth revision of the Corporate Governance Code of the Company in 2026.
## The Corporate Governance Code of the Company
The Corporate Governance Code of the Company is in compliance with all code provisions of the Hong Kong Stock Exchange Code, and exceeds the recommended best practices in the Hong Kong Stock Exchange Code in the following aspects.
As to the requirements on independent non-executive Directors (such as their terms of reappointment and the maximum number of companies in which they could concurrently assume the role of independent non-executive directors), we abide by more stringent PRC laws and regulations.
We have entered into service contracts with our Directors as well as our Supervisors (during the term of the Supervisory Committee prior to its abolition), which define their respective rights, obligations and responsibilities, particularly the duties of independent non-executive Directors and executive Directors. The service contracts with our Directors and Supervisors do not contain any provisions under which the Company is not allowed to terminate such contracts within one year without compensation (except for statutory compensation).
The Company discloses in the annual reports the controlling shareholder’s compliance with the undertakings contained in the deed of non-competition.
According to the authorization of the Board and the working rules of the specialized committees, the specialized committees under the Board consider and review the relevant issues and express their opinions and recommendations, and continuously enhance the decision-making support to the Board. In the meantime, the specialized committees under the Board prepare their respective annual work reports and make relevant disclosure in the annual reports, so as to further enhance the compliance and transparency of corporate governance.
---
# Corporate Governance Practices
The Company conducts a self-assessment on corporate governance every year with the aim of reviewing the implementation of the Corporate Governance Code of the Company and locating discrepancies, while summarizing the Company’s good corporate practices.
The Company completed the self-assessment on corporate governance for the year 2025. During the reporting period, the Company complied with all applicable code provisions of the Hong Kong Stock Exchange Code, all recommended best practices except for “designating a lead independent director”, and the Corporate Governance Code of the Company. The Company has established a series of mechanisms for the Board and its specialized committees, including pre-meeting communication, regular reporting, information submission, and closed-loop follow-up on resolutions and meeting actions, effectively safeguarding the independence of our independent Directors (for details, please refer to pages 125 to 127 of this report). These measures have already met the listing regulatory requirements of mainland China and Hong Kong, and therefore, the Company has not separately appointed a lead independent director.
In 2025, the Company’s corporate governance practices and achievements were recognized with a number of awards from the China Association for Public Companies.
- **Best Practice Case of the Board of Directors of Listed Companies (2025)**
- **Best Practice of the Board of Directors Office of Listed Companies (2025)**
- **Best Practice Case for Sustainable Development of Listed Companies (2025)**
---
# Corporate Governance Report
Based on the analysis of the corporate governance practices that have matured over time and those newly implemented, we believe that the Company mainly carried out the following commendable practices in corporate governance throughout 2025:
1. **Established the "Independent Director Special Lecture Series" mechanism** to further enhance the governance role of our independent Directors. Leveraging the professional expertise and external perspectives of our independent Directors, the Company invited Mr. Wong Ming Fung, who is an independent Director, to give a special lecture on the theme of anti-commercial bribery and anti-corruption for our Directors, senior management and core personnel in 2025, which has created an important platform for knowledge sharing and intellectual collaboration in the Company, and effectively expanded the role of our independent Directors from "supervision" to encompass "supervision + guidance + empowerment".
2. **Continued to enhance information management** for information disclosure and related party transactions. The Company actively employed information technology by developing and implementing dedicated management systems to improve our work efficiency and standardization, while reducing compliance risks. Firstly, we achieved process management for online information collection and document preparation for periodic reports and interim announcements. Secondly, we established data interfaces with systems related to the controlling shareholder's equity management, enabling automatic updates of information of connected legal persons under common control. Thirdly, we created a unified register for related party transactions to further regulate the management of related party transactions by our subsidiaries and enhance the level of look-through management. Fourthly, we implemented system-based management of annual caps for continuing related party transactions, enabling the periodic classification and summarization of actual transaction data based on preset rules and achieving automatic alerts regarding the fulfilment status of annual caps.
3. **Focused on long-term value to elevate ESG management standards.** We systematically conducted climate scenario analyses to identify climate-related risks and opportunities, and assessed their financial impacts on the Company over the short, medium, and long term. We actively promoted the development of ESG information systems to continuous improve the level of ESG management and the quality of information disclosure.
4. **Comprehensively standardized market value management** through institutional arrangements. We continued to track and study the latest regulatory policies and requirements. In line with the requirements of the Regulatory Guidelines for Listed Companies No. 10 — Market Value Management issued by the CSRC, and based on the principle of enhancing the Company's quality, we have formulated the Management Rules on Market Value of the Company in 2025. These rules implement requirements related to information disclosure and investor relations management, utilize methods such as cash dividends in compliance with laws and regulations to effectively enhance investor returns, and promote the accurate reflection of the Company's investment value in relation to its intrinsic value.
---
We will persist in the commendable corporate governance practices established in the previous years and recognized by the Board or the general meeting, mainly including:
## 1 Further strengthen the support for our Directors on duty performance.
1. In order to facilitate the Directors’ prompt and easy access to relevant information on duty performance, the Company has formulated the Handbook on Duty Performance of Directors of CGN Power, providing Directors with reference for the rules and guidelines of duty performance.
2. The expenses incurred by Directors for seeking advice from independent professional advisers have been included in the annual budget of the Company.
3. Adhering to the principle of “expanding the scope of coverage and striving for the best possible terms”, the Company has extended the insurance coverage for Directors to include major affiliates, and maintained a relatively high level of indemnity in the renewed policies. Upon the Company’s listing of A shares, the scope of coverage has been expanded to include liabilities associated with Directors in respect of A shares.
4. The management organizes extraordinary meetings on the issues that the Board is concerned about for individual reporting, and responds to the concerns of the Directors.
5. The documents provided to the Directors for review include, in addition to the proposal documents, supporting evidence, the reasoning process, and the professional opinions from third-party intermediaries, so as to provide a sufficient basis for the Directors to review.
6. In order to help all Directors familiarize with and get hold of the Company’s operation, the latest business report is given on the regular Board meetings of the Company.
---
# Corporate Governance Report
## 2 The Company is committed to enhancing the effectiveness and efficiency of the Board’s operations.
1. Centered on strengthening our coordination function and supporting efficient decision-making, we adhere to a “proposal-centric” approach to achieve end-to-end integration in proposal management, ensuring dedicated responsibility and continuous follow-through from the initiation of a topic to the finalization of the decision. A closed-loop tracking mechanism for Board resolutions has been established, encompassing the entire process of “deployment – supervision – reporting”, which emphasizes closed-loop control to guarantee high-quality execution, thereby supporting the Board’s scientific and efficient operation and ensuring the effective implementation of the Board’s decisions.
2. We develop standardized templates for proposal materials and formulate guidelines for proposal drafting and review. Proposals are categorized, and key preparation considerations are highlighted for 100 critical points within relevant proposals. This rigorous quality control over proposals facilitates scientific decision-making by the Board based on high-quality proposals.
3. Analysts from investment banks are invited to provide training for our Directors and senior management, focusing on topics such as the Company’s value management, prevailing capital market trends, and capital market operations, such that our Directors and senior management may gain deeper insights into capital market perspectives, thereby enhancing their awareness of safeguarding shareholder rights.
4. The frequency of approving the Directors’ remuneration proposal has been optimized. The Company proactively adjusted the approval frequency from an annual basis to a term-of-office basis. Furthermore, the appointment of a new Director during a term does not require a separate approval, which enhances approval efficiency and improves the overall effectiveness of corporate governance.
---
# 3 Strengthen proactive communication with shareholders and strive to protect investors’ rights.
1. We regularly analyze our shareholder structure, consider capital market conditions and company dynamics, and engage with long-term investors on our own initiative. The Company highly values making timely and accurate responses through irm.cninfo.com.cn, capital market hotline and company emails to inform shareholders the sound operation and stable growth of the Company and manifest the long-term value of the Company.
2. Roadshows, reverse roadshows, results announcement conferences and teleconferences are organized to proactively report our business operations to the shareholders, analysts, financial media and other parties. By further broadening our communication channels with shareholders, their better understanding of business operations of the Company could be attained.
3. The Company conducts annual results announcement conferences through a combination of channels, including on-site attendance, video webcast, and telephone participation. The Chairman and/or executive Director and President, an independent Director, the chief financial officer, vice presidents, and the secretary to the Board attend the annual results announcement conferences to present the Company’s operational performance and address questions to strengthen interaction among Directors, senior management, and both domestic and international investors and analysts, ensuring that both small and medium-sized investors may access information about the Company’s operations. Furthermore, by directly listening to the perspectives and suggestions of the capital market, the Company enhances the awareness among Directors and senior management of protecting shareholder interests, collectively fostering the Company’s high-quality development.
# 4 The Company has formulated its Code for Securities Transactions by Directors and Specific Persons in compliance with the A share regulatory rules, which set up rules on the basic principles for securities transaction, approval procedures and others. The confirmation for disclosure of interests by Directors, Supervisors (during the term when the Supervisory Committee has not yet abolished) and senior management was signed at the Board meetings for annual and interim results, respectively.
---
# Corporate Governance Report
## Overview of Regulatory Documents on Governance and Key Rules and Regulations
Pursuant to the Company Law, the Decision of the State Council to Repeal Certain Administrative Regulations and Documents (2023) (《國務院關於廢止部分行政法規和文件的決定(2023)》), the Interim Measures for the Administration of Overseas Securities Offering and Listing by Domestic Enterprises (2023) (《境內企業境外發行證券和上市管理試行辦法(2023)》), the Transitional Arrangements for the Implementation of the Supporting Rules of the New Company Law (2024) (《關於新<公司法>配套制度規則實施相關過渡期安排(2024)》), the Guidelines for the Articles of Association of Listed Companies (2025 Revision) (《上市公司章程指引(2025 年修訂)》), the Regulatory Guidelines for Listed Companies No.3 – Cash Dividends by Listed Companies (2025 Revision) (《上市公司監管指引第 3 號 — 上市公司現金分紅(2025年 修訂)》), the Rules Governing the Listing of Shares on Shenzhen Stock Exchange (2025 Revision) (《深圳證券交易所股票上市規則(2025年修訂)》), and the Listing Rules and other laws, regulations and regulatory documents, as well as the specific circumstances of the Company, we amended the Procedural Rules of General Meeting of CGN Power Co., Ltd., (with its Chinese name renamed from 《中國廣核電力股份有限公司股東大會議事規則》 to 《中國廣核電力股份有限公司股東會議事規則》), the Procedural Rules of the Board of Directors of CGN Power Co., Ltd., the Terms of Reference for the Audit and Risk Management Committee under the Board of Directors of CGN Power Co., Ltd., the Terms of Reference for the Remuneration Committee under the Board of Directors of CGN Power Co., Ltd., the Terms of Reference for the Nomination Committee under the Board of Directors of CGN Power Co., Ltd., the Terms of Reference for the Nuclear Safety Committee under the Board of Directors of CGN Power Co., Ltd., and the Terms of Reference for Secretary of the Board of Directors of CGN Power Co., Ltd..
In accordance with the Self-regulatory Guidelines for the Companies Listed on the Shenzhen Stock Exchange No. 1 – Standardized Operation of the Companies Listed on the Main Board, and taking into account the actual situation of the Company, we made amendments to the Management Rules on Fundraising Proceeds of CGN Power Co., Ltd..
In accordance with the Regulatory Guidelines for Listed Companies No. 10 – Market Value Management, and the Several Opinions on Improving and Strengthening the Management of Market Value of Listed Companies Controlled by Central Enterprises, we have formulated the Management Rules on Market Value of CGN Power Co., Ltd..
The formulation of and amendments to these documents further regulated operations and improved governance for the Company.
---
As at the end of 2025, our regulatory documents on governance and key rules and regulations mainly consist of:
- Articles of Association of CGN Power Co., Ltd.* (the "**Articles of Association**")
- Procedural Rules of General Meeting of CGN Power Co., Ltd.*
- Procedural Rules of the Board of Directors of CGN Power Co., Ltd.* (the "**Procedural Rules of Board of Directors**")
- Provisions on the Corporate Governance Authorization of CGN Power Co., Ltd. (the "**Provisions on the Corporate Governance Authorization**")
- Terms of Reference for the Audit and Risk Management Committee under the Board of Directors of CGN Power Co., Ltd.*
- Terms of Reference for the Remuneration Committee under the Board of Directors of CGN Power Co., Ltd.*
- Terms of Reference for the Nomination Committee under the Board of Directors of CGN Power Co., Ltd.*
- Terms of Reference for the Nuclear Safety Committee under the Board of Directors of CGN Power Co., Ltd.*
- Board Diversity Policy of CGN Power Co., Ltd.* (the "**Board Diversity Policy of the Company**")
- Management Rules on Information Disclosure of CGN Power Co., Ltd.*
- Management Measures on Inside Information and Insiders of CGN Power Co., Ltd.
- Management Rules on Investor Relations of CGN Power Co., Ltd.*
---
# Corporate Governance Report
- Management Rules on Related Party Transactions of CGN Power Co., Ltd.
- Management Rules on Comprehensive Risk Management of CGN Power Co., Ltd.
- Management Rules on Internal Auditing of CGN Power Co., Ltd.
- Internal Control Manual of CGN Power Co., Ltd.
- Director Nomination Policy of CGN Power Co., Ltd.*
- Corporate Governance Code of CGN Power Co., Ltd.*
- Shareholder Communication Policy of CGN Power Co., Ltd.* (the "**Shareholder Communication Policy**")
- Terms of Reference for Independent Directors of CGN Power Co., Ltd.
- Terms of Reference for Secretary of the Board of Directors of CGN Power Co., Ltd.*
- Management Measures on Guarantees of CGN Power Co., Ltd.*
- Management Rules on Investments of CGN Power Co., Ltd.
- Code for Securities Transactions by Directors and Specific Persons of CGN Power Co., Ltd.* (the "**Code for Securities Transactions by Directors and Specific Persons**")
- Management Rules on Fundraising Proceeds of CGN Power Co., Ltd.*
- Management Rules on Market Value of CGN Power Co., Ltd.
- Management Rules on Capital Flows to and from Related Parties of CGN Power Co., Ltd.*
* Already disclosed at the website of the Hong Kong Stock Exchange or the website of the SZSE or the website of the Company.
---
# Amendments to the Articles of Association
In 2025, pursuant to the Company Law, the Decision of the State Council to Repeal Certain Administrative Regulations and Documents (2023), the Interim Measures for the Administration of Overseas Securities Offering and Listing by Domestic Enterprises (2023), the Transitional Arrangements for the Implementation of the Supporting Rules of the New Company Law (2024), the Guidelines for the Articles of Association of Listed Companies (2025 Revision), the Regulatory Guidelines for Listed Companies No.3 – Cash Dividends by Listed Companies (2025 Revision), the Rules Governing the Listing of Shares on Shenzhen Stock Exchange (2025 Revision), and the Listing Rules and other laws, regulations and regulatory documents, as well as the specific circumstances of the Company, we made amendments to the Articles of Association. These amendments primarily include:
- **Additions:** Provisions to be observed by the controlling shareholder and de facto controller; content related to the qualifications for independent Directors and their special duties; content related to the Board committees; content related to the internal audit function; and the Company’s implementation of a general counsel system.
- **Deletions:** Requirements related to duty performance by independent Directors; content related to the Supervisory Committee and Supervisors; and the arbitration clause for holders of overseas-listed foreign shares.
- **Amendments:** Procedures for changes to the register of members; content related to financial assistance; qualification requirements for shareholders proposing extraordinary proposals; notice periods for annual general meetings and extraordinary general meetings; voting methods at general meetings; the size and composition of the Board; and the conditions for the removal of an independent Director from office.
# Compliance with Domestic Regulatory Requirements
In 2025, the corporate governance practices of the Company were in compliance with the laws and regulations of the PRC, the relevant regulatory requirements of the CSRC and the Hong Kong Stock Exchange, and will continue to comply with the updated laws and regulations. None of the Company, the Directors, Supervisors (during the term when the Supervisory Committee has not yet abolished) or senior management was subject to any administrative penalty, notice of criticism or reprimand.
# Relationship with the Controlling Shareholder
## Independence from the Controlling Shareholder
The Company has an independent and complete business system and is able to operate independently. We are independent from our controlling shareholder in respect of our business, employees, assets, organizations and finance, etc.
As at the date of this report, among eight Directors of the Company, two non-executive Directors hold positions in CGNPC. Mr. Pang Songtao, an executive Director and President, has been the general manager of CGNPC since October 2025. None of the other members of the senior management of the Company holds positions in CGNPC.
While maintaining our independent and complete business system and independent operating ability, we will continue to regulate our related party transactions and reduce potential horizontal competition to maximize shareholders’ interests. For instance, in 2025, when the Company entered into related party transactions with CGN Group, four Directors Yang Changli, Gao Ligang (incumbent Director), Pang Songtao and Li Li abstained from voting.
---
# Corporate Governance Report
## Horizontal Competition with the Controlling Shareholder
We entered into a Custodian Management Framework Agreement with CGNPC on April 28, 2014 and renewed for several times, pursuant to which the Group provides certain custodian services and represents CGNPC in exercising certain management rights or powers over the target companies under custody.
As at December 31, 2025, the target companies under custody included: Xianning Nuclear Power Co., Ltd. (咸寧核電有限公司), Hubei Nuclear Power Co., Ltd. (湖北核電有限公司), Cangnan Nuclear, Lingwan Nuclear Power Co., Ltd. (嶺灣核電有限公司), Anhui Wuhu Nuclear Power Co., Ltd. (安徽蕪湖核電有限公司), CGN Shaoguan Nuclear Power Co., Ltd. (中廣核韶關核電有限公司), CGN Jilin Nuclear Power Co., Ltd. (中廣核吉林核電有限公司), CGN Cangnan Second Nuclear Power Co., Ltd. (中廣核蒼南第二核電有限公司), etc.
In order to limit potential competition between CGN Group and the Group, we and CGNPC have entered into a non-competition deed, pursuant to which CGNPC has given certain non-competition undertakings to the Company (for itself and for the benefits of other members of the Group), to the effect that it would not, and it would procure that its associates and connected persons (other than any members of the Group) do not and would not, directly or indirectly, whether on its own account or in conjunction with or on behalf of any person, firm or company among other things, carry on, participate, be interested or engaged in or acquire or hold (in each case whether as a shareholder, director, partner, agent, employee or otherwise be involved, whether for profit, reward or otherwise), any restricted business (other than the disclosed retained business of CGN Group in the Prospectus) during the agreed restricted period. Only the independent non-executive Directors may participate in deciding whether or not to accept any new business opportunity. In addition, in order to avoid potential competition between CGN Group and the Group for certain nuclear power projects retained by the former, we have obtained the right to acquire and the pre-emptive right regarding the retained business to better protect the interests of the Group.
In the progress of A Share Offering of the Company, CGNPC further made an undertaking to avoid horizontal competition, including, but not limited to, to procure, at its best efforts, investees of CGNPC not to, whether at present or in the future, engage or participate in any business or activity that has or might cause direct or indirect competition with principal operations of the Company and its controlling subsidiaries, to treat the Group as the sole platform for final integration of nuclear power generation business of CGNPC, as well as to transfer the domestic retained nuclear power business of CGNPC to the Company upon the fulfillment of specific conditions. In December 2024, as approved at the 2024 second extraordinary general meeting of the Company, the deadline for transferring the retained business to the Company in such further undertaking was extended by one year.
On January 8, 2025, the Company acquired 100% equity interest in Taishan Second Nuclear, and the equity transfer was completed on January 20, 2025. On January 21, 2025, the Company received notification from CGNPC in respect of a new business opportunity regarding the Phase III nuclear power project within the Huizhou Nuclear Power Site. Upon prudent analysis, the Company proposed to refrain from investing in the aforesaid project for the time being. The independent non-executive Directors of the Company also agreed in writing that the Company should refrain from participating in the investment in the aforesaid project for the time being. In February 2025, CGNPC established Huizhou Third Nuclear to invest in the aforesaid project. On October 16, 2025, the Company acquired 82% equity interest in Huizhou Nuclear, 100% equity interest in Huizhou Second Nuclear, 100% equity interest in Huizhou Third Nuclear and 100% equity interest in Zhanjiang Nuclear, and the equity transfers were completed on October 31, 2025. Taishan Second Nuclear, Huizhou Nuclear, Huizhou Second Nuclear, Huizhou Third Nuclear and Zhanjiang Nuclear became subsidiaries of the Company.
---
The independent non-executive Directors will closely monitor the performance of CGNPC under the non-competition deed and the undertaking to avoid horizontal competition, and the management of the Company will report to the Board on the relevant matters as and when appropriate on an ongoing basis. CGNPC confirmed that no breach of the non-competition deed and the undertaking to avoid horizontal competition has been found during the reporting period.
# Shareholders
## Shareholders’ Rights
Shareholders’ rights are based on certain laws and regulations, such as the Company Law, the Hong Kong Companies Ordinance and the Listing Rules. Detailed descriptions on major rights of the shareholders are set out in the Corporate Governance Code of the Company, which mainly include:
- receiving dividends and other kinds of profit distribution in proportion to their respective shareholding;
- requesting, convening, hosting, attending or appointing proxies to attend and voting at general meetings in accordance with laws;
- supervising the Company’s operating activities and making suggestions or inquiries;
- transferring, gifting or pledging their shares in accordance with laws, administrative regulations and the Articles of Association; and
- requesting for the relevant information of the Company in accordance with the laws, administrative regulations and the Articles of Association.
To protect shareholders’ interests and rights, the Company will submit separate resolutions in respect of all matters (including the election of a specific Director) at general meetings of the Company.
All resolutions tendered at the general meetings will be subject to voting by way of poll in accordance with the Listing Rules. The poll results will be published timely on the websites of the Company, the Hong Kong Stock Exchange and the SZSE after the general meetings.
---
# Corporate Governance Report
## Convening Extraordinary General Meetings and Submission of Proposals
According to the Articles of Association, shareholders who individually or jointly hold 10% or more of the issued voting shares of the Company for more than 90 consecutive days may request for the convening of an extraordinary general meeting (“**EGM**”). The relevant request may be proposed in writing to the Board requesting the Board to convene an EGM to deal with the matters specified in the request. In the event that the Board agrees to convene an EGM or class meeting, the notice of convening an EGM or class meeting shall be issued within five days from the passing of the relevant resolution of the Board. Any amendment to the proposal made in the notice requires approval of the shareholders concerned.
According to the Articles of Association, shareholders who individually or jointly hold more than 1% of the voting shares of the Company may submit a proposal to the Board in writing 10 days before the date of the general meeting. The Board shall notify other shareholders within 2 days of receiving the proposal and include it for consideration at the general meeting. The written proposal shall be addressed to the Board at the Company’s headquarters in the PRC.
Further details about the procedures for shareholders to convene and put forward proposals at any general meeting are available on the Company’s website.
## Enquiries to the Board
Shareholders who intend to put forward their enquiries about the Company to the Board may email their enquiries to the email address: IR@cgnpc.com.cn.
## Shareholdings
### Total number of registered shareholders
Unit: accounts
| | As at December 31, 2024 | As at December 31, 2025 |
|---|---|---|
| Total number of registered shareholders | 210,028 | 243,258 |
| Registered holders of H shares | 2,996 | 2,833 |
| Holders of A shares | 207,032 | 240,425 |
---
# Shareholder structure
| Nature of shares | Shareholders | Number of shares held (shares) | Approximate percentage of the Company's total issued shares (%) |
| :--- | :--- | :---: | :---: |
| A shares | CGNPC | 29,176,641,375 | 57.78 |
| | Hengjian Investment | 3,428,512,500 | 6.79 |
| | CNNC | 1,679,971,125 | 3.32 |
| | CITIC Securities Company Limited | 9,013,059 | 0.02 |
| | Other holders of A shares | 5,040,848,041 | 9.98 |
| H shares | CITIC Securities Company Limited | 2,054,827,000 | 4.07 |
| | Citigroup, Inc. | 838,487,603 | 1.66 |
| | BlackRock, Inc. | 816,604,416 | 1.62 |
| | CGNPC | 560,235,000 | 1.11 |
| | Other holders of H shares | 6,893,470,981 | 13.65 |
**Note:** The information above is relevant as at December 31, 2025.
As at the date of this Annual Report, our minimum public float meets the requirements of the Listing Rules.
# General Meetings
Pursuant to the Articles of Association, general meetings are divided into annual general meeting ("**AGM**") and EGM. General meetings shall be convened by the Board. AGM is held once every year and within six months from the end of the preceding accounting year.
In 2025, we held the 2024 AGM/the 2025 first H shareholders’ class meeting/the 2025 first A shareholders’ class meeting, and the 2025 first EGM/the 2025 second H shareholders’ class meeting/the 2025 second A shareholders’ class meeting.
---
# Corporate Governance Report
## 2024 AGM
| Category | Description |
| :--- | :--- |
| **Date** | May 21, 2025 |
| **Location** | South Tower, CGN Building, Shenzhen |
| **Attendance** | Total number of shares with voting rights represented by the shareholders attending the AGM in person or by proxy was 38,136,694,609 shares, representing approximately 75.5% of the total number of shares. |
**Proposals considered**
**Ordinary resolutions:**
- The report of the Board of Directors for the year ended December 31, 2024
- The report of the Supervisory Committee for the year ended December 31, 2024
- The annual report for the year 2024
- The audited financial report for the year ended December 31, 2024
- The profit distribution plan for the year ended December 31, 2024
- The investment plan and capital expenditure budget for the year 2025
- The re-appointment of KPMG Huazhen LLP as the financial report auditor of the Company for the year 2025 until the end of the next annual general meeting of the Company, and to authorize the Board to determine its remuneration
- The re-appointment of Pan-China Certified Public Accountants LLP as the internal control auditor of the Company for the year 2025 until the end of the next annual general meeting of the Company, and to authorize the Board to determine its remuneration
- The performance evaluation results of independent non-executive Directors for the year 2024
- Continuing connected transactions – 2026-2028 Engineering Services Framework Agreement and the proposed annual caps thereunder
**Special resolutions:**
- The registration and issuance of multi-type interbank debt financing instruments
- The grant of the general mandate to the Board of Directors for allotting, issuing and dealing with additional A Shares and/or H Shares during the relevant period
- The grant of the general mandate to the Board of Directors for repurchasing A Shares and/or H Shares of the Company during the relevant period
- The extension of the validity period of the resolution of the general meeting of shareholders on the issuance of A-share convertible corporate bonds to non-specific investors
- The extension of the validity period of the authorization to the Board or its authorized persons granted by the general meeting of shareholders to deal with the matters in relation to the issuance of A-share convertible corporate bonds to non-specific investors at its sole discretion
---
## 2025 first H shareholders’ class meeting
| Category | Description |
| :--- | :--- |
| **Date** | May 21, 2025 |
| **Location** | South Tower, CGN Building, Shenzhen |
| **Attendance** | Total number of H shares with voting rights represented by the H shareholders attending the H shareholders’ class meeting in person or by proxy was 3,432,086,373 shares, representing approximately 30.7% of the total number of H shares. |
| **Proposals considered** | **Special resolutions:**
- The grant of the general mandate to the Board of Directors for repurchasing A Shares and/or H Shares of the Company during the relevant period
- The extension of the validity period of the resolution of the general meeting of shareholders on the issuance of A-share convertible corporate bonds to non-specific investors
- The extension of the validity period of the authorization to the Board or its authorized persons granted by the general meeting of shareholders to deal with the matters in relation to the issuance of A-share convertible corporate bonds to non-specific investors at its sole discretion |
## 2025 first A shareholders’ class meeting
| Category | Description |
| :--- | :--- |
| **Date** | May 21, 2025 |
| **Location** | South Tower, CGN Building, Shenzhen |
| **Attendance** | Total number of A shares with voting rights represented by the A shareholders attending the A shareholders’ class meeting in person or by proxy was 34,704,919,236 shares, representing approximately 88.2% of the total number of A shares. |
| **Proposals considered** | **Special resolutions:**
- The grant of the general mandate to the Board of Directors for repurchasing A Shares and/or H Shares of the Company during the relevant period
- The extension of the validity period of the resolution of the general meeting of shareholders on the issuance of A-share convertible corporate bonds to non-specific investors
- The extension of the validity period of the authorization to the Board or its authorized persons granted by the general meeting of shareholders to deal with the matters in relation to the issuance of A-share convertible corporate bonds to non-specific investors at its sole discretion |
---
# Corporate Governance Report
## 2025 first EGM
| Feature | Details |
| :--- | :--- |
| **Date** | October 16, 2025 |
| **Location** | South Tower, CGN Building, Shenzhen |
| **Attendance** | Total number of shares with voting rights represented by the shareholders attending the EGM in person or by proxy was 41,206,445,231 shares, representing approximately 81.6% of the total number of shares. |
| **Proposals considered** | **Ordinary resolutions:**
- The discloseable and connected transaction in relation to the acquisition of equity interests in four companies including Huizhou Nuclear from CGNPC
- Non-exempt continuing connected transactions
**Special resolutions:**
- The abolishment of the Supervisory Committee and amendments to the Articles of Association of CGN Power Co., Ltd.
- The amendments to and rename of the Procedural Rules of General Meeting of CGN Power Co., Ltd.
- The amendments to the Procedural Rules of the Board of Directors of CGN Power Co., Ltd.
**Ordinary resolution:**
- The amendments to and rename of the Remuneration Proposal for the Directors of the Fourth Session of the Board of Directors and the Supervisors of the Fourth Session of the Supervisory Committee |
---
## 2025 second H shareholders’ class meeting
| | |
| :--- | :--- |
| **Date** | October 16, 2025 |
| **Location** | South Tower, CGN Building, Shenzhen |
| **Attendance** | Total number of H shares with voting rights represented by the H shareholders’ attending the H shareholders’ class meeting in person or by proxy was 6,553,300,229 shares, representing approximately 58.7% of the total number of H shares. |
| **Proposals considered** | Special resolutions:
- The amendments to articles in relation to class meetings under the Articles of Association of CGN Power Co., Ltd.
- The amendments to articles in relation to class meetings under the Procedural Rules of General Meeting of CGN Power Co., Ltd. |
## 2025 second A shareholders’ class meeting
| | |
| :--- | :--- |
| **Date** | October 16, 2025 |
| **Location** | South Tower, CGN Building, Shenzhen |
| **Attendance** | Total number of A shares with voting rights represented by the A shareholders’ attending the A shareholders’ class meeting in person or by proxy was 34,653,145,002 shares, representing approximately 88.1% of the total number of A shares. |
| **Proposals considered** | Special resolutions:
- The amendments to articles in relation to class meetings under the Articles of Association of CGN Power Co., Ltd.
- The amendments to articles in relation to class meetings under the Procedural Rules of General Meeting of CGN Power Co., Ltd. |
**Note:** At the 2025 second H shareholders’ class meeting, the proposals “To consider and approve the Amendments to Articles in Relation to Class Meetings under the Articles of Association of CGN Power Co., Ltd.” and “To consider and approve the Amendments to Articles in Relation to Class Meetings under the Procedural Rules of General Meeting of CGN Power Co., Ltd.” proposed by the Company were not passed. The non-approval of these proposals shall not affect other content of the Articles of Association and the Procedural Rules of General Meeting and the other amendments approved at that EGM, and will not have any impact on the daily operations of the Company.
---
# Corporate Governance Report
We are serious about the organization and convening of each general meeting. All Directors, Supervisors (during the term when the Supervisory Committee has not yet abolished) and senior management members attend the general meetings to the best of their abilities and answer questions of the shareholders with the presence of witnessing lawyer(s). The external auditors of the Company also attended the AGM, and replied to questions about audit practices, preparation and contents of the auditors’ report, accounting policies and independence of auditors. The 2025 AGM of the Company is expected to be held in May 2026.
Details of the key questions from shareholders and our answers at the general meetings:
**Question from our shareholder**
The number of nuclear power projects approved by the State since 2022 has increased significantly compared to previous years. As the Company will also carry out intensive project construction in subsequent periods, how will the future funding needs be addressed?
**Our response**
Our project construction funding is primarily supported by bank facilities. Currently, over 80% of our credit financing arrangements are provided by banks. The required internal funds for project construction are mainly obtained through equity financing at the project company level and our refinancing activities where projects under construction serve as the proposed investment projects. Taking into account our operations and cash flows, we will select appropriate methods to meet our funding needs for future development, ensure that our projects under construction proceed as scheduled and steadily enhance our investment value.
**Question from our shareholder**
The Company has maintained a steady increase in its dividend distribution ratio for over a decade. In the coming years, given its increasing capital expenditures, will the Company maintain such level of shareholder returns, and will it continue to announce plans regarding shareholder returns?
**Our response**
We are implementing the dividend distribution plan for 2021 to 2025 as approved at the general meeting, pursuant to which, we will maintain a reasonable increase in the dividend distribution ratio based on the dividend ratio in 2020. We will strictly honour this commitment. We are formulating our plan in response to the 15th Five-Year Plan and medium-to-long-term development. In line with these plans, we will also announce our next plan regarding shareholder returns in due course. We will continue to maintain a dynamic balance between corporate development, performance growth and shareholder returns, and enhance the stability, sustainability and predictability of cash dividends, in order to safeguard and reward shareholders' trust and confidence in the Company, and achieve mutual growth.
---
# Communication with Shareholders and Investors
Investor relations have always been regarded as highly important by the Company, the Board and our management. The Company has established the Management Rules on Investor Relations of CGN Power Co., Ltd., the Management Rules on Information Disclosure of CGN Power Co., Ltd. and other systems to regulate the activities of investor relations through these systems.
## Shareholders Communication Policy
The Company continues to help our shareholders understand the Company in a timely and comprehensive manner through various communication channels. The Company established the Shareholders Communication Policy to maintain continuous and effective communication with shareholders. The Company revised and updated the Shareholders Communication Policy on the Company’s website in November 2025. The revisions mainly included the Company’s information dissemination channels, including communication methods with shareholders, arrangements for paperless corporate communications, arrangements related to general meetings, and methods of communication with the capital market; provision for shareholder inquiry methods; and a statement on privacy protection for shareholders. The Company has complied with the Shareholders Communication Policy, which ensures that the Company communicates to its shareholders in an effective and timely manner, and maintains a continuous communication between the Board and shareholders. In 2025, we organized investor communication activities across different channels to enhance our communication with investors and help them gain a deeper understanding of the Company. Meanwhile, we highly value the views and feedback of shareholders and investors. We earnestly consider the advice and comments of shareholders and investors on the Company’s development strategy, operation and other aspects and provide feedback to the Board, the management and relevant departments of the Company through briefings, special reports and other means, in order to achieve the alignment between the Company’s business development and shareholder value and to protect the interests of the shareholders, thereby achieving effective and smooth two-way communication. Furthermore, during our routine communications with shareholders, we have not received any suggestions or complaints from shareholders regarding the matters as set out in the Shareholders Communication Policy. The Company believes that the Shareholders Communication Policy was effectively implemented during the reporting period.
In 2025, the Company was recognized by the China Association for Public Companies with the “2024 Best Practice for Annual Report Results Briefing of Listed Companies”.
---
# Corporate Governance Report
## Communication activities during the reporting period
| Communication channel/type of interaction | Frequency | Target audience | Company representatives | Specific details and date | Follow-up actions on interaction outcomes |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Regular reports and operation briefings | 10 | Shareholders of the Company | All Directors and senior management members | March 26, 2025: Announcement of 2024 A share annual report, H share annual results announcement and ESG report;
April 11, 2025: Announcement of the 2024 Annual Report;
April 23, 2025: Announcement of the 2025 First Quarterly Report;
August 27, 2025: Announcement of 2025 A share interim report and H share interim results announcement;
August 29, 2025: Announcement of the 2025 Interim Report;
October 28, 2025: Announcement of the 2025 Third Quarterly Report;
January 6, 2025: Announcement of the 2024 Fourth Quarter Operation Briefings;
April 9, 2025: Announcement of the 2025 First Quarter Operation Briefings;
July 7, 2025: Announcement of the 2025 Second Quarter Operation Briefings;
October 14, 2025: Announcement of the 2025 Third Quarter Operation Briefings. | Continuously improve based on the Company's internal and external environment and capital market conditions. |
| General meetings | 2 | Shareholders attending the meetings in person, voting via internet, or by proxy | Directors and senior management members who attended the meetings | May 21, 2025: Convening of the 2024 AGM/the 2025 first H shareholders' class meeting/the 2025 first A shareholders' class meeting;
October 16, 2025: Convening of the 2025 first EGM/the 2025 second H shareholders' class meeting/the 2025 second A shareholders' class meeting. | Collect opinions on the proposals to be considered at the general meetings from shareholders and investors before the meetings, and respond to relevant questions during and after the meeting.
Include the main concerns of shareholders and the corresponding responses in the annual report. |
---
# Investor Communication
| Communication channel/type of interaction | Frequency | Target audience | Company representatives | Specific details and date | Follow-up actions on interaction outcomes |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Results announcement conferences | 2 | Analysts, institutional and individual investors | Chairman, executive Director and President, an independent Director, the chief financial officer and secretary to the Board, vice presidents; The chief financial officer and secretary to the Board | March 27, 2025: 2024 annual results announcement conference; August 28, 2025: 2025 interim results announcement conference | Prepare periodic summary reports to provide internal feedback on capital market opinions; promptly respond to investor inquiries. |
| Results roadshows | 2 | Institutional investors | The chief financial officer and secretary to the Board | March-April 2025: 2024 annual results roadshow; September 2025: 2025 interim results roadshow. | Prepare periodic summary reports to provide internal feedback on capital market opinions; promptly respond to investor inquiries. |
| Quarterly teleconference | 3 | Analysts and institutional investors | The chief financial officer and secretary to the Board | January 7, 2025: 2024 fourth quarter operation teleconference; April 28, 2025: 2025 first quarter operation teleconference; October 30, 2025: 2025 third quarter operation teleconference. | Prepare periodic summary reports to provide internal feedback on capital market opinions; promptly respond to investor inquiries. |
| Special exchanges | 2 | Analysts, institutional and individual investors | The chief financial officer and secretary to the Board | July 8, 2025: Online roadshow for the issuance of A-share convertible bonds; September 11, 2025: Participation in the centralized roadshow for the listed companies controlled by CGNPC. | Prepare periodic summary reports to provide internal feedback on capital market opinions; promptly respond to investor inquiries. |
| Daily communication | 1,357 | Analysts, institutional and individual investors | Employees from the investor relations management department | On-site research: 57 participants; Summit exchanges: 304 participants; Investor hotline: 914 calls; Responses on the IRM platform: 82 responses | |
**Note:** Daily communication includes on-site research, participation in summits organized by investment banks, telephone communications, and Q&A on the IRM platform, among others.
---
# Corporate Governance Report
## Dividend
Pursuant to the Articles of Association, when considering the dividend distribution ratio in the future, we will take into consideration the business performance of the Company for the year, the future development strategies of the Company and other factors, provided that it shall not be lower than 30% of the net profit attributable to shareholders of the Company for the year.
The Dividend Distribution Plan for the Coming Five Years (2021-2025) (《未來五年(2021年 — 2025年)股東分紅回報規劃》) of the Company formulated by the Board and management was approved at the 2020 AGM convened on May 26, 2021. On the premise of no major changes in the business, operating results and financial position of the Group, subject to the approval at the general meeting in the relevant year, the Company will maintain a reasonable increase in the dividend distribution ratio from 2021 to 2025 based on the dividend ratio in 2020 (42.25%). For details of the Company’s dividend distribution from 2021 to 2025, please refer to the section headed “Shareholder Value” on pages 24 to 26 of this Annual Report.
## Board of Directors
### Composition of the Board of Directors
We fully recognize the benefits of diversity in Board members to the development of the Company, and the Company is committed to establishing a board consisting of members with a diverse background. The Board formulated the Board Diversity Policy and delegated the task of reviewing the policy regularly to the Nomination Committee.
Differentiation and diversity in many aspects, such as professional skills, industry experience, ages, qualifications and genders, are reflected in the composition of the members of this session of the Board. The members of this session of the Board possess over 20 years of extensive experiences in the electricity industry management, financial and accounting management, law, safety management, as well as supervision and management of state-owned enterprises respectively. They fully understand their duties, rights and responsibilities, and are capable of performing their duties in a faithful, honest and diligent manner. After the change of Board session in October 2023, the Board includes two female Directors.
Pursuant to the Articles of Association, the Board of the Company comprises nine Directors. As of the date of this report, the Company has eight current Directors. On December 11, 2025, Mr. Gao Ligang, a former executive Director and the President of the Company, resigned from his positions as he had reached the age of retirement. On the same day, Mr. Pang Songtao, a non-executive Director, was re-designated as an executive Director, and was appointed by the Board as the President of the Company. The Company will complete the election of Director as soon as practicable in accordance with the Articles of Association and other relevant requirements. Except for Mr. Pang Songtao, being an executive Director and the President of the Company, all the remaining Directors are non-executive Directors who are independent of our management, including three independent non-executive Directors. Each of the independent non-executive Directors has confirmed that he/she is independent of the Company, thereby contributing to critical review and monitoring of management process.
---
# Term of office of the current Directors as of the date of this report:
| Name | Gender | Position | Commencement date of term | Expiry date of term |
| :--- | :--- | :--- | :--- | :--- |
| Yang Changli | Male | Chairman, Non-executive Director | May 20, 2020 | Upon expiry of the fourth session of the Board |
| Pang Songtao | Male | Executive Director and President | December 11, 2025 | Upon expiry of the fourth session of the Board |
| Li Li | Female | Non-executive Director | October 9, 2023 | Upon expiry of the fourth session of the Board |
| Feng Jian | Male | Non-executive Director | February 10, 2023 | Upon expiry of the fourth session of the Board |
| Liu Huanbing | Male | Non-executive Director | October 9, 2023 | Upon expiry of the fourth session of the Board |
| Wong Ming Fung | Male | Independent Director | October 9, 2023 | Upon expiry of the fourth session of the Board |
| Li Fuyou | Male | Independent Director | August 5, 2020 | Upon expiry of the fourth session of the Board |
| Xu Hua | Female | Independent Director | October 9, 2023 | Upon expiry of the fourth session of the Board |
The Board has at all times complied with the requirements under Rules 3.10(1) and 3.10(2) of the Listing Rules for the year 2025 that at least three independent non-executive Directors have been appointed. Among them, at least one independent non-executive Director must have appropriate professional qualification or professional knowledge of accounting or professional knowledge related to financial management.
Each of the independent non-executive Directors has confirmed his/her independence according to Rule 3.13 of the Listing Rules. The Board issues a special opinion on the independence of the then incumbent independent Directors on an annual basis.
---
# Corporate Governance Report
The Company has established a mechanism to ensure independent views and input are available to the Board, and conducted an annual review of the implementation and effectiveness of such mechanism.
1. **Composition of the Board:** The Board maintains a balanced composition of executive Directors, non-executive Directors and independent non-executive Directors, with a majority of non-executive Directors (including independent non-executive Directors) and no less than one-third of independent non-executive Directors to ensure the independence of the Board.
2. **Composition of the Board committees:** The Audit and Risk Management Committee is entirely composed of independent Directors. The Remuneration Committee and the Nomination Committee are both composed of a majority of independent Directors, with an independent Director serving as the chairman of each committee, thereby fully leveraging the role of independent Directors in "participating in decision-making, exercising supervision and checks and balances, and providing professional advice". The chairman of the Nuclear Safety Committee is a non-executive Director.
3. **Board meetings held during the year** strictly adhered to the Procedural Rules of Board of Directors and the terms of reference of the Board committees. Notices for Board meetings were dispatched 14 or 5 days prior to the meeting, while notices for meetings of the Board committees were sent at least 5 working days or 14 days before the meeting, which fully ensured that Directors have sufficient time and channels to express their independent views and opinions. Before each regular Board meeting, a pre-meeting communication session was organized to report on the proposals to the non-executive Directors in advance, solicit their opinions, and refine the proposals before they were submitted to the regular Board meeting for deliberation.
4. **The management of the Company** seeks independent professional advisors to provide consultation services for Directors requiring such services, which are included in the budget to provide funding.
5. **The Company has established various channels** for the independent non-executive Directors to express their opinions: (1) Written confirmation of their independence; (2) During the year, the Chairman held discussions with the independent Directors to solicit their opinions, with no other Directors present; (3) They are not financially dependent on the Company.
6. **Non-executive Directors** (including independent non-executive Directors) may put forward their independent views and opinions during their research activities. The Company has established various channels for the independent non-executive Directors to express their opinions, and secure sufficient time for Board meetings and Board Committee meetings to ensure that the Directors have sufficient time and channels to express their review opinions.
---
Since provisions of the Hong Kong Stock Exchange Code require Directors to disclose the number and nature of positions held in listed companies or entities and other material commitments, and their identities and duration of employment with the issuer, therefore, the Directors have agreed to disclose their relevant information timely to the Company.
Please refer to “Board of Directors and Senior Management” set out on pages 94 to 97 of this Annual Report for the biographical details of all Directors. Except for those disclosed in such section, no other information relating to the relationship between Directors and other Directors and senior management shall be disclosed according to the Hong Kong Stock Exchange Code.
The Board has set out the Procedural Rules of Board of Directors, which specify the terms of reference of the Board and procedures for the Board meetings, etc., and also set out special arrangements for voting on resolutions regarding major related party transactions and contracts. Directors shall not vote on any contract, transaction, arrangement or proposal in which he/she or any of his/her associates is materially interested, nor shall he/she be counted in the quorum. Where the number of the Directors who can vote on this matter is less than three, such issue shall be submitted to a general meeting for voting. The independent non-executive Directors shall also provide independent opinions in accordance with laws and regulations and the Listing Rules. The Company will strictly review each resolution proposed at the Board meetings to find out whether there is any conflict of interest that requires Directors to abstain from voting and remind all Directors for confirmation before meetings. For example, Directors Mr. Yang Changli, Mr. Gao Ligang (incumbent Director), Mr. Pang Songtao and Ms. Li Li have refrained from voting when we considered the “proposal on considering the revision of the annual transaction caps for the continuing connected transactions of the Company”.
## Duties of the Board
As the operating decision-making body of the Company, the Board performs its duties in accordance with the provisions set out in the Articles of Association. The Board is responsible for overall leadership of the Group, supervision on the Group’s strategic decisions, and supervision on business and performance. The Board reports its work to the general meeting, implements the resolutions resolved at the general meeting, and is accountable to the general meeting. The Board has delegated the powers and responsibilities for daily management and operation of the Group to the senior management of the Company.
All Directors of the Company are aware of their joint responsibility for the Company’s operations, business and development, and perform their duties in accordance with the provisions of the service contract and the Corporate Governance Code of the Company. All Directors must ensure that they have complied with the applicable laws and regulations, and devote sufficient time and efforts to handle the affairs of the Company, to act with integrity, prudence and skills, and to assume their respective responsibilities.
---
# Corporate Governance Report
## The responsibilities of the Board mainly include:
1. formulating strategic guidelines of the Company;
2. developing work targets of the management;
3. evaluating the performance of the management;
4. ensuring the Company implements a prudent and effective regulatory framework to evaluate and manage risks;
5. performing the function of corporate governance for the Company or arranging for one or more committees to perform related duties; and
6. authorizing the specialized committees to perform relevant detailed responsibilities in accordance with the requirements of the Procedural Rules of Board of Directors and the terms of reference of the specialized committees.
To facilitate the Directors’ access to the support for duty performance, the Company, pursuant to the Listing Rules and the Articles of Association, compiled the Handbook on Duty Performance of Directors of CGN Power, providing Directors with reference for the rules and guidelines of duty performance.
---
The corporate governance duties of the Board mainly include:
- developing and reviewing the policies and practices regarding the corporate governance of the Company;
- reviewing and monitoring the training and continuous professional development of the Directors and senior management;
- reviewing and monitoring the Company’s policies and practices on compliance with legal and regulatory requirements;
- developing, reviewing and monitoring the rules regarding code of conduct applicable to Directors and employees; and
- reviewing the Company’s compliance with the Corporate Governance Code of the Company and the Hong Kong Stock Exchange Code, and disclosing the same in the Corporate Governance Report.
# Delegation by the Board
The Board retains the power to decide on all material matters pertaining to the Company, including: approval and supervision on all policy matters, overall strategies and budgets, internal control and risk management system, material transactions (in particular those possibly involving a conflict of interests), financial information, and other major financial and operation matters. The Directors may seek independent professional advice in performing their duties at the Company’s expense and are encouraged to consult with the Company’s senior management independently. The daily management, administration and operation of the Company are delegated to the senior management. The delegated functions and responsibilities will be reviewed by the Board on a regular basis.
# Board Committees
The Board established four committees with specific terms of reference, namely the Audit and Risk Management Committee, the Remuneration Committee, the Nomination Committee and the Nuclear Safety Committee. The specialized committees shall conduct study on specific matters and furnish advice and recommendations thereon as a reference for the Board in its decision-making.
---
# Corporate Governance Report
## Audit and Risk Management Committee
Please refer to the “Audit and Risk Management Committee Report” set out on pages 172 to 173 of this Annual Report for details of the Audit and Risk Management Committee, including its composition and annual work summary.
### The duties and responsibilities of the committee mainly include:
- To be responsible for selecting or dismissing independent auditors, as well as supervising and evaluating external auditors;
- To review and monitor the independence and objectivity of the independent auditors as well as the effectiveness of the audit process in accordance with the applicable standards, and discuss the nature and scope of the audit with the independent auditors before the audit commences;
- To formulate and implement policies on engaging external auditors to provide non-audit services according to work needs. The Audit and Risk Management Committee shall report and make recommendations to the Board on any matters where action or improvement is needed;
- To review the Company’s financial information and its disclosures, including quarterly (if any), interim and annual financial accounting reports proposed to be submitted to the Board, and to advise on the authenticity, accuracy and completeness of these financial accounting reports;
- To consider any significant or unusual items which are reflected or required to be reflected in the reports and accounts of the Company, and give due consideration to any matters raised by the Company’s accounting and finance department, compliance department or independent auditors;
- To discuss the review of the half-year accounts and the audit of the annual accounts of the Company by the independent auditors;
---
- **To review the independent auditors’ explanatory notes of inspection or management proposal letter** (including any material queries raised by the independent auditors regarding the accounting records, financial accounts or monitoring system), and the responses to queries from the management officers of the Company;
- **To communicate with the Board, senior management officers and the independent auditors in respect of the Company’s financial reports** on a regular basis, and at least two meetings must be convened each year with the independent auditors of the Company;
- **To consider the appointment or dismissal of the Company’s financial officer** and the person in charge of the internal audit department;
- **To review ESG-related matters**;
- **To review the Company’s financial policies, internal control system and risk management system**, and their implementation;
- **To supervise and evaluate the work of the internal audit department**;
- **To stay informed about the work dynamics of the internal audit department**, timely coordinate major internal control deficiencies or major risks found and report to the Board;
- **The Audit and Risk Management Committee shall establish the relevant procedures for dealing with the following issues:** receiving, retaining and dealing with complaints coming to the knowledge of the Company in relation to accounting, internal control, risk management or audit matters; receiving or handling complaints or whistle blowing from the Company’s employees on accounting or auditing matters and keeping their confidentiality;
- **To monitor the execution of the cash dividend policy and the shareholders’ return plan** carried out by the Board, as well as the execution of appropriate decision-making procedures and the information disclosures.
- **To complete other tasks assigned by the Board**; and
- **To fulfill other duties and responsibilities** conferred by laws, administrative regulations, the securities regulatory rules in the jurisdiction where the Company’s shares are listed, and the Articles of Association.
---
# Corporate Governance Report
## Remuneration Committee
Please refer to the “Remuneration Committee Report” set out on pages 174 to 175 of this Annual Report for details of the Remuneration Committee, including its composition, annual work summary, remuneration policy and remuneration of Directors and senior management in 2025.
**The duties and responsibilities of the committee mainly include:**
To be responsible for formulating the assessment standards for Directors and senior management and conducting assessments, formulating and reviewing the remuneration decision mechanisms, decision-making processes, payment and cessation of payment recovery arrangements, and other remuneration policies and plans for Directors and senior management, as well as making recommendations to the Board on the following matters:
- the remuneration of Directors and senior management;
- the formulation or amendment of equity incentive plans, employee stock ownership plans, and the granting of rights to incentive recipients and the achievement of conditions for the exercise of such rights by incentive recipients;
- the arrangement of stock ownership plans for Directors and senior management in the event of a proposed spin-off of a subsidiary; and
- other matters prescribed by laws, administrative regulations, listing rules in the jurisdiction where the shares of the Company are listed and the Articles of Association, and other matters as authorized by the Board.
---
# Nomination Committee
Please refer to the “Nomination Committee Report” set out on pages 176 to 177 of this Annual Report for details of the Nomination Committee, including its composition and annual work summary.
## The duties and responsibilities of the committee mainly include:
- To review the structure, size and composition (including the skills, knowledge and experience) of the Board on a regular basis annually, assist the Board in maintaining a Board skills matrix, and make recommendations on any proposed changes to the Board to complement the Company’s strategies;
- To study and formulate the selection criteria and procedures for Directors and senior management personnel;
- To recommend individuals suitably qualified to become Directors and senior management personnel, select and review the candidates for Directors and senior management personnel and their qualifications, and make recommendations to the Board on the nomination or appointment/dismissal (including matters related to appointment, re-appointment and succession planning) of Directors, and the appointment or dismissal of senior management personnel;
- To assess the independence of independent Directors;
- To review the policy on Board diversity and any measurable objectives for implementing such Board diversity policy as may be adopted by the Board from time to time, and review the progress on achieving the objectives; and
- To address matters prescribed by laws, administrative regulations, listing rules in the jurisdiction where the shares of the Company are listed and the Articles of Association, and other duties and responsibilities delegated by the Board.
---
# Corporate Governance Report
## Nuclear Safety Committee
Please refer to the “Nuclear Safety Committee Report” set out on page 178 of this Annual Report for details of the Nuclear Safety Committee, including its composition and annual work summary.
**The duties and responsibilities of the committee mainly include:**
- To listen to presentation of the Company relating to status of nuclear safety;
- To listen to independent nuclear safety assessment reports by third-party organizations obtained by the Company;
- To implement necessary nuclear safety oversight, offer guidance and conduct research activities in accordance with the needs;
- To report observations and recommendations to the Board;
- To give appropriate response to the general meeting on nuclear safety issues of concern; and
- Other matters prescribed by laws, administrative regulations, listing rules in the jurisdiction where the shares of the Company are listed and the Articles of Association, and other matters as authorized by the Board.
## Particulars of Board Meetings
The Company has adopted the practice of holding Board meetings on a regular basis. The Company set out the next year’s meeting schedule one year in advance. The notice of regular Board meeting and the meeting documents signed and issued by the management will be sent to all Directors at least 14 days prior to the date of convening the meeting to enable them to attend the meeting, have sufficient time to familiarize themselves with the meeting content and decision-making matters and include relevant matters for consideration in the agenda.
During the reporting period, we convened a total of seven Board meetings (including five regular meetings and two extraordinary meetings). The convening and voting procedures of such meetings were all in compliance with the requirements under the Articles of Association and the Procedural Rules of Board of Directors. Details of the meetings are as follows:
| No. | Meeting | Date | Mode |
|---|---|---|---|
| 1 | Eleventh meeting of the fourth session of the Board of Directors | January 8, 2025 | Physical |
| 2 | Twelfth meeting of the fourth session of the Board of Directors | March 26, 2025 | Physical |
| 3 | Thirteenth meeting of the fourth session of the Board of Directors | April 23, 2025 | Physical |
| 4 | Fourteenth meeting of the fourth session of the Board of Directors | July 21, 2025 | Writing |
| 5 | Fifteenth meeting of the fourth session of the Board of Directors | August 27, 2025 | Physical |
| 6 | Sixteenth meeting of the fourth session of the Board of Directors* * Before this Board meeting, the Chairman held a symposium with independent non-executive Directors, without attendance of other Directors. | October 28, 2025 | Physical |
| 7 | Seventeenth meeting of the fourth session of the Board of Directors | December 11, 2025 | Writing |
---
All resolutions proposed at above meetings were approved. Save for the resolutions passed at above general meetings, major resolutions considered and approved by the Board during the reporting period also include:
- 2025 Operational Plan
- 2025 Evaluation Report on Major Operational Risk Forecast
- 2025 Internal Audit Plan
- Amendments to the Management Rules on Fundraising Proceeds of CGN Power Co., Ltd.
- Approval of the Management Rules on Market Value of CGN Power Co., Ltd.
- Amendments to the Terms of Reference for the Audit and Risk Management Committee under the Board of Directors of CGN Power Co., Ltd.
- Amendments to the Terms of Reference for the Nomination Committee under the Board of Directors of CGN Power Co., Ltd.
- Amendments to the Terms of Reference for the Remuneration Committee under the Board of Directors of CGN Power Co., Ltd.
- Amendments to the Terms of Reference for the Nuclear Safety Committee under the Board of Directors of CGN Power Co., Ltd.
- Approval of the appointment and removal of the President of CGN Power Co., Ltd.
The Company maintains detailed minutes of the matters considered and decisions made at Board meetings, which include a record of the proceedings, any concerns raised by Directors, or dissenting opinions expressed. A draft of the minutes is circulated to all Directors for their comments after the Board meeting concludes. The final version of the minutes is then prepared for record-keeping purposes and archived.
---
# Corporate Governance Report
## Attendance of Directors at the Board Meetings, Board Committee Meetings and General Meetings
The table below shows details of attendance of Directors at the Board meetings, Board Committee meetings and general meetings during the reporting period.
| Name | Position | Board Meeting | Audit and Risk Management Committee | Remuneration Committee | Nomination Committee | Nuclear Safety Committee | General Meeting |
| :--- | :--- | :---: | :---: | :---: | :---: | :---: | :---: |
| Yang Changli | Chairman of the Board and Non-executive Director, NS (Chairman), P | 7/7 | – | – | 3/3 | 3/3 | 2/2 |
| Pang Songtao | Executive Director and President, NS | 7/7 | – | – | – | – | 1/2 |
| Gao Ligang | Executive Director and President, NS | 6/6 | – | – | – | 3/3 | 1/2 |
| Li Li | Non-executive Director | 7/7 | – | – | – | – | 2/2 |
| Feng Jian | Non-executive Director, S, NS | 7/7 | – | 5/5 | – | 3/3 | 2/2 |
| Liu Huanbing | Non-executive Director, NS | 7/7 | – | – | – | 3/3 | 2/2 |
| Wong Ming Fung | Independent non-executive Director, S (Chairman), A, P | 7/7 | 5/5 | 5/5 | 1/1 | – | 2/2 |
| Li Fuyou | Independent non-executive Director, P (Chairman), A, NS | 7/7 | 5/5 | – | 3/3 | 3/3 | 1/2 |
| Xu Hua | Independent non-executive Director, A (Chairman), S, P | 7/7 | 5/5 | 5/5 | 2/2 | – | 2/2 |
**A: Audit and Risk Management Committee P: Nomination Committee NS: Nuclear Safety Committee S: Remuneration Committee**
**Notes:**
1. On August 27, 2025, the Board approved the adjustment to the members of the Nomination Committee of the fourth session of the Board. Ms. Xu Hua was appointed as a member of the committee, and Mr. Wong Ming Fung ceased to be a member of the committee.
2. On December 11, 2025, Mr. Gao Ligang, a former executive Director and the President of the Company, as well as a member of the Nuclear Safety Committee of the Board, resigned from his positions as he had reached the age of retirement. On the same day, Mr. Pang Songtao, a non-executive Director, was re-designated as an executive Director, and was appointed by the Board as the President of the Company, as well as a member of the Nuclear Safety Committee of the Board.
3. Certain Directors did not attend all general meetings due to other business engagements.
---
# Board Skills
To better leverage the effectiveness of the combination of skills, experience and diversity of our Directors, we have prepared a Board Skills Matrix to analyze the current combination of skills of the Board in detail. Supported by annual training and research initiatives provided by the Board, our Directors are able to stay abreast of new information, adapt to emerging requirements, and develop new competencies, which empowers them in performing their duties in a more scientific, efficient and rational manner, building a high-performance governance engine and promoting sustainable value creation for shareholders.
## Board skill dimensions and descriptions
| Core skill dimension | Description and requirements |
| :--- | :--- |
| Strategy & commercial insight | Identify industry trends and competitive landscapes, steer the Company’s formulation and execution of long-term strategies, and possess the ability for grounded decision-making and risk anticipation. |
| Team effectiveness & soft skills | Promote efficient communication and collaboration within the Board, encourage fact-based discussions, and enhance the quality of decision-making through diverse perspectives. |
| Finance & capital management | Demonstrate a deep understanding of financial statements, assess the Company’s financial health, and be proficient in a variety of financing instruments and capital management approaches to create value for shareholders. |
| Corporate governance & compliance management | Ensure the Company complies with laws, regulations, and the regulatory requirements where its shares are listed, and establish a robust internal control and compliance system and ensure its effective operation. |
| Supervision & risk management | Effectively oversee the Company’s financial and operational performance through the Audit and Risk Management Committee and other agencies, establish a risk management system, and secure high-quality development. |
| Innovation & technology insight | Understand the impact of technological changes on business models, guide the Company’s digital transformation, and pay attention to emerging risks such as network and data security. |
| Brand building & public opinion management | Gain market trust and advantages through brand value creation. Strengthen the management of the online public opinion environment to prevent and respond to the impact of negative information on the Company. |
---
# Corporate Governance Report
## Board skills combination in detail
| Director name | Position | Age | Gender | Education | Professional title/qualification | Experience and expertise | Strategy & commercial insight | Team effectiveness & soft skills | Finance & capital management | Corporate governance & compliance management | Supervision & risk management | Innovation & technology insight | Brand building & public opinion management | Plan to enhance skills |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **Yang Changli** | Chairman, non-executive Director, chairman of the Nuclear Safety Committee of the Board | 61 | Male | Master's degree | Senior engineer (researcher-level) | 30 years of experience in nuclear power, nuclear fuel, R&D of technology as well as safety and quality management | Proficient | Proficient | Informed | Familiar | Proficient | Proficient | Informed | Annual training programs provided by the Board |
| **Pang Songtao** | Executive Director and President | 54 | Male | Master's degree | Senior engineer (researcher-level) | 30 years of experience in the nuclear power industry | Proficient | Familiar | Informed | Familiar | Proficient | Proficient | Informed | Annual training programs provided by the Board |
| **Li Li** | Non-executive Director | 56 | Female | Master's degree | Lawyer | 30 years of experience in macroeconomics, administrative management, law, supervision of state-owned assets and other areas | Proficient | Familiar | Informed | Proficient | Proficient | Informed | Proficient | Annual training programs provided by the Board |
| **Feng Jian** | Non-executive Director | 58 | Male | Master's degree | Accountant | Extensive experience in corporate management, financial management, investment management and other areas | Proficient | Familiar | Proficient | Familiar | Familiar | Informed | Informed | Annual training programs provided by the Board; Annual research initiatives provided by the Board |
| **Liu Huanbing** | Non-executive Director | 52 | Male | Master's degree | Senior accountant (researcher-level) | 25 years of experience in financial management, investment and financing management and other areas | Proficient | Familiar | Proficient | Familiar | Familiar | Informed | Informed | Annual training programs provided by the Board; Annual research initiatives provided by the Board |
| **Wong Ming Fung** | Independent non-executive Director, chairman of the Remuneration Committee of the Board | 54 | Male | Doctorate | Senior counsel in Hong Kong | Extensive experience in law, management and other areas | Proficient | Familiar | Informed | Proficient | Familiar | Informed | Informed | Annual training programs provided by the Board; Annual research initiatives provided by the Board |
| **Li Fuyou** | Independent non-executive Director, chairman of the Nomination Committee of the Board | 70 | Male | Bachelor's Degree | Senior engineer (professor-level) | Extensive experience in energy, coal, safety management and other areas | Proficient | Familiar | Informed | Familiar | Proficient | Informed | Informed | Annual training programs provided by the Board; Annual research initiatives provided by the Board |
| **Xu Hua** | Independent non-executive Director, chairlady of the Audit and Risk Management Committee of the Board | 65 | Female | Master's degree | Senior accountant | Extensive experience in financial management, corporate management and supervision and other areas | Proficient | Familiar | Proficient | Familiar | Proficient | Informed | Informed | Annual training programs provided by the Board; Annual research initiatives provided by the Board |
---
# Board Evaluation
In accordance with the requirements of Code Provision B.1.4 of the Hong Kong Stock Exchange Code, the Company will conduct a review of Board effectiveness at least once every two years to ensure that the Board continues to perform its oversight functions effectively and efficiently. The Company plans to conduct its first Board evaluation in 2026.
# Training for Directors
As stipulated by the Listing Rules, a director shall be aware of his/her duties. All newly appointed Directors have been provided with necessary induction training and information to ensure that they will have proper understanding of the operation and business of the Company and their responsibilities under the relevant laws, regulations and rules.
In order to provide better assistance to the Directors for performing their duties, we have actively made arrangements for the Directors to participate in trainings in relation to, among others, the business and corporate governance aspects of a listed company. Furthermore, we provide the Directors with written information on applicable policies and regulations issued by the regulators from time to time.
In addition, the management of the Company monthly provides the Directors with a monthly management report, which sets out the particulars such as achievements of our operating indicators, safety and environmental management, production and operation, project construction, the Company's performance in the capital market and other important matters.
We arrange the Directors to participate in research initiatives from time to time every year to enable them to have a better understanding of our operation and business, and invite and encourage them to furnish reasonable suggestions and advice to the Company based on their respective areas of expertise.
The current Directors have received the following trainings in relation to the roles, functions and duties of directors of listed companies for the year ended December 31, 2025.
| Director | Reading materials | Specific training | On-site research |
| :--- | :---: | :---: | :---: |
| Yang Changli | √ | √ | |
| Pang Songtao | √ | √ | |
| Li Li | √ | √ | |
| Feng Jian | √ | √ | √ |
| Liu Huanbing | √ | √ | |
| Wong Ming Fung | √ | √ | |
| Li Fuyou | √ | √ | √ |
| Xu Hua | √ | √ | √ |
Reading materials:
Company Management Monthly Report once a month and a total of 12 issues.
---
# Corporate Governance Report
### Specific trainings:
| Training date | Training name | Main content | Organizer | Training format | Yang Changli (H) | Gao Ligang (H) | Pang Songtao (H) | Li Li (H) | Li Fuyou (H) | Xu Hua (H) | Wong Ming Fung (H) | Feng Jian (H) | Liu Huanbing (H) |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| March 2025 | Capacity Building Training for Independent Directors (Session 4) | 1. Audit of financial statements of listed companies
2. Analysis of key points on data compliance upon listing
3. Standardization of general meetings and performance of duties by directors from the perspective of exercising shareholder rights
4. Latest legislation and practices on corporate governance of listed companies | China Association for Public Companies | Videos on the website of the China Association for Public Companies | - | - | - | - | 6 | 5.5 | - | - | - |
| April 23, 2025 | Reflections on the Path of Electricity Market Reform and the Construction of the Spot Market | Development, new business trends and strategies of the power industry | The Company | In-person | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
| September 3-10, 2025 | Briefing on the Supervision of Listed Companies | Briefing on the supervision of listed companies in Shenzhen (2025 Issue 1, Total Issue 8) | China Securities Regulatory Commission Shenzhen Bureau | Written | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
| October 28, 2025 | Training on Anti-Corruption and Anti-Commercial Bribery: Directors' Responsibilities | Anti-corruption and anti-commercial bribery | The Company | In-person | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
| November 24-28, 2025 | Special Training (November) - Roles, Functions and Responsibilities of the Board | 1. General legal liabilities of directors
2. Specific legal liabilities of directors
3. Model Code for Securities Transactions by Directors of Listed Issuers
4. Other continuing obligations – Listing Rules
5. Other continuing obligations – Companies Ordinance
6. Other continuing obligations – Securities and Futures Ordinance
7. Other continuing obligations – The Codes on Takeovers and Mergers and Share Buy-backs
8. Corporate Governance Code
9. Environmental, Social and Governance Reporting Code
10. Market misconduct | The Company | Written | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
---
# Training hours (H)
| Training date | Training name | Main content | Organizer | Training format | Yang Changli | Gao Ligang | Pang Songtao | Li Li | Li Fuyou | Xu Hua | Wong Ming Fung | Feng Jian | Liu Huanbing |
| :--- | :--- | :--- | :--- | :--- | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: |
| December 3-10, 2025 | Special Training for Directors (December) - ESG, Corporate Governance, Related Party Transactions and Continuing Obligations | 1. Corporate governance and environmental, social and governance matters; 2. Related party transactions; 3. Continuing obligations | Hong Kong Stock Exchange | Written and videos on the website of the Hong Kong Stock Exchange | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 |
| December 4, 2025 | Regulatory News Express for December 2025 | 1. Content of relevant meetings of the CSRC; 2. Announcement of the CSRC on Launching the Pilot Program of Commercial Real Estate Investment Trusts (Draft for Comments); 3. Measures for the Implementation of Supervisory and Administrative Actions in the Securities and Futures Markets (Draft for Comments) of the CSRC; 4. Case study of serious financial fraud by a certain enterprise | Shenzhen Public Companies Association | Written | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 |
| December 2025 | Capacity Building Training for Independent Directors (Session 6) | 1. Interpretation of the Code of Professional Ethics for Independent Directors of Listed Companies and latest case studies; 2. Introduction to the background and main content of the amendments to the Company Law; 3. How to be a competent independent director; 4. Key points for performing duties of independent directors of listed companies and case studies; 5. Amendments to the Company Law and the duties and responsibilities of directors, supervisors and senior management | China Association for Public Companies | Videos on the website of the China Association for Public Companies | - | - | - | - | - | 4 | 4 | - | - |
| **Total training hours for 2025** | | | | | **14** | **14** | **14** | **14** | **20** | **23.5** | **18** | **14** | **14** |
**Note:** Training organized by the Company is classified as internal training; all other training is classified as external training.
---
# Corporate Governance Report
## On-site research:
- From February 25 to 28, 2025, conducted on-site research at two key suppliers of nuclear power equipment, and at Hongyanhe Nuclear.
- From May 26 to 30, 2025, conducted on-site research at Qinshan Nuclear Power Plant, and at Shanghai Nuclear Engineering Research & Design Institute, which is an important partner in the Company’s nuclear power construction; visited CGN Digital Technology Co., Ltd. and two other external entities to further understand new trends in digital technology applications; and conducted research at CGN Shengsi Offshore Wind Farm and the Shengsi Xiaoyangshan Bodaojue Photovoltaic Power Station to gain an in-depth understanding of new energy development in the Zhejiang region, providing input for exploring development models that leverage the complementary advantages of nuclear power with offshore wind and offshore photovoltaic power.
- From September 16 to 17, 2025, conducted on-site research at Hongyanhe Nuclear to look into the implementation of cooling source management.
## Appointment and Re-election of Directors
According to the Articles of Association, the Directors shall be elected at the general meeting and each term of office shall be three years. Directors must retire by rotation at least once every three years and may be re-elected for continuous appointment. The Company formulated the procedures for selection, appointment and re-election of Directors, and specified the working process and duties in appointment and re-election of Directors.
1. **Nomination by Shareholders**: Shareholders nominate Director candidates in accordance with the Articles of Association.
2. **Consideration by the Nomination Committee**: Examine the qualification for the appointment of Directors (especially the qualifications and independence of independent non-executive Directors) according to the laws, regulations, the Listing Rules and the Articles of Association. Make appropriate recommendations to the Board.
3. **Consideration by the Board**: Consider the resolution for the election of Directors which shall be submitted for election at the general meeting.
4. **Election at the General Meeting**
5. **Entering into Service Contract**
---
# Board Diversity
## Policy on Board Diversity
The Board has approved the Board Diversity Policy of the Company, setting forth: (1) purpose of the policy; (2) vision; (3) principles; (4) candidates of the Board should be considered for various factors including but not limited to gender, age, culture and education background, race, professional experience, skills, knowledge and term of services; and (5) review and report. The policy is available on the Company’s website.
Pursuant to the above policy, the Company formulated the assessment indicators for reviewing the structure and composition of the Board, including age, gender and profession. The relevant indicators complied with the Listing Rules and the Board Diversity Policy of the Company.
The Board and the Nomination Committee have reviewed the implementation and effectiveness of the Board Diversity Policy of the Company. The Directors of the current Board have professional backgrounds in technology, finance, audit, management, legal affairs and economics as well as extensive management experience. The Directors have gender diversity, a reasonable age structure, diverse educational backgrounds, extensive professional experience, and reasonable terms of service. The implementation of the Board Diversity Policy has met expectations, and no further revision is currently required.
## Gender Diversity
After the change of Board session on October 9, 2023, the fourth session of the Board includes two female Directors, achieving the Company’s long-term goal of gender differentiation on the Board members. Following the adjustment to the members of the Nomination Committee of the Board on August 27, 2025, the Nomination Committee of the fourth session of the Board has included a female member, thereby achieving the goal of gender diversity within the Nomination Committee.
---
# Corporate Governance Report
## Employee Diversity Policy
The Company strictly complies with relevant laws and regulations such as the Company Law, the Labor Law of the People's Republic of China and the Labor Contract Law of the People's Republic of China, and have formulated internal rules and regulations, including the Labor Management System, the Recruitment and Employment Staffing Management System, the Professional and Technical Staff Recruitment Management System, the Management Staff Selection and Appointment Management System, the Salary Management System and the Employee Performance Management System. We are committed to building harmonious and stable labor relations, promoting employee diversity and equality, and adhering to the principle of non-discrimination in employment. We strictly prohibit differential treatment based on gender, age, educational background, ethnicity, religion, or marital status, and actively seek employees whose attributes align with the Company's development. We continuously foster a diverse working environment that respects different opinions, perspectives, and beliefs. We have improved the position management system across multiple career paths, including management, technology and technical skills, supported by corresponding transition mechanisms. This further broadens the career paths for talents in various fields and enables well-grounded and rational allocation of employees. We have established a performance appraisal system for all employees, with appraisal results effectively linked to bonus allocation, remuneration adjustments, job rotations, and training and development opportunities, which promotes the mutual growth of our employees and the Company.
As at December 31, 2025, the proportion of female employees in the Company's senior management was approximately 4%, and the proportion of female employees in the overall workforce was approximately 12%, which is in line with the Company's targets regarding employee gender ratio. For detailed information on the Company's human resources management, please refer to "Human Capital" on pages 67 to 76 of this Annual Report and the 2025 ESG Report.
## Directors' Undertakings
Directors have confirmed that they have devoted sufficient time and attention to the affairs of the Company during the year. All Directors have also disclosed to the Company the number and nature of their positions held in public companies or entities listed in mainland China, Hong Kong and overseas and other significant commitments, and have provided the names of the public companies and entities and the time involved in working for the relevant positions.
Each of the Directors has signed the declaration for dealing in the Company's securities, undertaking to comply with the relevant confidentiality provisions and the securities dealing requirements, and has undertaken to obtain the prior written approval from the Chairman of the Board or the designated Directors before dealing in the Company's securities and report and disclose the same to the Hong Kong Stock Exchange and the SZSE. All Directors have signed the confirmation for disclosure of interests at both Board meetings for annual and interim results. Directors shall notify the Company in writing of any changes in their personal information on a timely basis in order for the Company to timely report the same to the Hong Kong Stock Exchange, the SZSE and the Hong Kong Companies Registry within the prescribed period.
---
The Board office of the Company will regularly remind Directors to provide the company secretaries with the information required to be disclosed in connection with matters needing disclosure by individuals under the Listing Rules on a timely basis.
## Directors' Interest
As recorded in the register required to be kept pursuant to Section 352 of Part XV of the Hong Kong Securities and Futures Ordinance, none of the Directors held any shares of the Company or any of the Company’s associated corporations as at December 31, 2025.
## Model Code for Securities Transactions
The Company has formulated and adopted the Code for Securities Transactions by Directors and Specific Persons, the provisions of which are not less stringent than the Model Code in Appendix C3 to the Listing Rules. After making specific enquiries by the Company, the Directors of the Company have all confirmed that they have complied with the above two codes for the year 2025.
## Roles of Chairman and President
According to the requirements of provision C.2.1 of the Hong Kong Stock Exchange Code, the roles of chairman and chief executive should be separated and should not be performed by the same individual. In 2025, Mr. Yang Changli served as the Chairman, while Mr. Gao Ligang and Mr. Pang Songtao successively served as the President. The Articles of Association have expressly specified the functions and powers of the Chairman and the President. The main functions and powers of the Chairman include presiding over the general meetings, convening and presiding over meetings of the Board and reviewing the implementation status of passed Board resolutions. The main functions and powers of the President include being in charge of the Company’s production, operation and management.
Pursuant to the Articles of Association, the President shall coordinate the implementation of the passed Board resolutions and report his/her work to the Board; the Chairman shall prepare the Directors’ Report on behalf of the Board and submit the same to the Company’s AGM for consideration.
## Directors' Financial Reporting Responsibilities in respect of Financial Statements
The Directors acknowledge their responsibilities for preparing the financial statements of the Company for the year ended December 31, 2025 which give a true and fair view of the affairs of the Company and the Group and of the Group’s results and cash flows.
The management has provided the necessary explanations and information to the Board enabling the Board to make an informed assessment on the Company’s financial statements submitted to the Board for approval.
The statement made by the auditors of the Company on their reporting responsibilities in respect of the Company’s financial statements is contained in the “Audit Report” on page 192 of this Annual Report.
---
# Corporate Governance Report
## Company Secretaries
Mr. Yin Engang, being the chief financial officer, the secretary of the Board and a joint company secretary, serves as the main contact person of the Company. To comply with the Listing Rules, the Company has appointed Ms. Ng Sau Mei of TMF Hong Kong Limited as a joint company secretary of the Company, to provide assistance to Mr. Yin Engang. The joint company secretaries also play essential roles in supporting the Chairman, the Board of Directors and the specialized committees of the Board by ensuring on time and precise information flow, so the Board policies, procedures and decisions are followed. The joint company secretaries have the right to advise on the corporate governance matters and assist Directors to familiarize themselves with the affairs of the Company and acquire professional development.
In 2025, Mr. Yin Engang was rated as “5A” (the highest grade) in the Performance Evaluation of the Secretary of the Board of Directors of Listed Companies of the China Association for Public Companies for the fourth consecutive year.
According to Rule 3.29 of the Listing Rules, the current joint company secretaries of the Company, Mr. Yin Engang and Ms. Ng Sau Mei, had taken not less than 15 hours of relevant professional training during the financial year ended December 31, 2025.
---
# Management and Staff
As at the end of the reporting period, the total number of employees of the Company (excluding associates and joint ventures) was 22,928, and the percentage of male employees and female employees was 88.37% and 11.63% respectively. The Group adheres to an employment policy of equality and diversity. We oppose any form of discrimination, including gender discrimination, and are committed to achieving gender diversity in our workforce by ensuring that female employees constitute no less than 10% of total headcount. For more information on the Company’s efforts regarding employee diversity and equality, please refer to the 2025 ESG Report published by the Company.
The management and staff of the Company are responsible for the successful implementation of strategy and direction determined by the Board, and they must observe national and local laws and regulations, and safeguard the interest of shareholders.
The delegation of specific authorities by the Board to the management is stated in the Provisions on the Corporate Governance Authorization (《治理授權規定》), and any amendment to the corporate governance authorization of the Company is subject to approval by the Board. The authorization delegated to the management and staff below the level of President has been stated in the provisions on the management authorization, and any amendment to the management authorization of the Company is subject to approval by the President.
The Staff Manual (《員工手冊》), which is compiled by the Company as an appendix to the employment contract, has the same effect as that of the employment contract. All staff who have signed employment contracts with the Company shall sign for receipt of the Staff Manual and make a statement that they have received, been aware of and will comply with all provisions set out in the Staff Manual. All management and staff are subject to the specific obligations as set out in the Staff Manual in respect of the work time, disciplines, workplace code, confidentiality and non-competition restriction, conflict of interests, value and code of conduct.
The Company has formulated handling measures of non-compliance and disciplinary matters by employees, Code of Conduct of Listed Companies, Detailed Implementing Measures of the Eight-point Decision of the Central Government, as well as management measures on discipline inspection. These applicable rules for handling non-compliance and disciplinary matters should be strictly abided by all management and employees.
---
# Corporate Governance Report
In 2025, the Company strengthened its dedicated supervision capabilities. Through various initiatives such as making videos for alerting awareness, convening education conferences, initiating analysis of typical cases, and establishing an exhibition hall dedicated to promoting integrity, we reinforced the dissemination of typical cases of violations of regulations, discipline and law among our employees, and further strengthened the promotion of honest practices among our staff. In 2025, the Company found a total of 26 breaches of discipline and regulations, all of which were handled in strict accordance with relevant systems and procedures. The disciplinary actions carried out included warnings, demerits, major demerits, demotions (reduction in rank), removal from office, and dismissals, etc. Such cases did not have a significant impact on our financial statements and overall operations. The rigorous handling of the non-compliance with discipline and regulations served as an effective deterrent, effectively promoted risk prevention, institutional improvement, and management enhancement, and facilitated the further improvement in corporate governance ability and standards of the Company. The Company has established smooth and effective whistleblower channels, which can be used to report any malpractices or irregularity in any matters related to the Company.
The principles and details of the remuneration paid by the Company to senior management officers are set out in the “Remuneration Committee Report” on page 175 of this Annual Report.
The Company attaches great importance to the continuous professional development of management and staff. The details of its talent cultivation are set out in “Human Capital” on pages 69 to 74 of this Annual Report.
## Internal Auditors
The Company has established an internal audit department, which plays a major role in monitoring the internal governance of the Company. The Group has 55 audit staff with related professional qualifications (such as intermediate and senior auditors, internal auditors with international certifications, international certified information systems auditors, international internal control self-assessment professional qualifications, PRC certified public accountants, members of the Association of Chartered Certified Accountants in UK, legal professional qualification, cost engineers and nuclear safety engineers).
Duties of the internal audit department include:
- Unrestricted access to review all aspects of the activities and internal controls of the Company;
- Specific audits on the business, procedures, expenditures and internal controls of all functional departments, business units, subsidiaries and major affiliates of the Company on a regular basis; and
- Specific reviews or audits of areas of concern identified by management or the Audit and Risk Management Committee.
---
The manager of the internal audit department is nominated by the Audit and Risk Management Committee and engaged by the Board, reports directly to the Audit and Risk Management Committee and the President, and his/her audit opinions will be reflected directly to the Board through the chairman of the Audit and Risk Management Committee.
In 2025, the internal audit department of the Group conducted specific audits on key management areas such as project pre-development management, financial management, fund management, nuclear power project construction and installation cost management, key R&D project management, management of rectification for issues identified in audits, as well as internal control and risk management, carried out special inspections on areas of concern identified by the management, and issued reports to senior management officers.
# External Auditors
KPMG Huazhen LLP has audited the consolidated financial statements for the year 2025 prepared by the Company in accordance with the CASBE. Pan-China Certified Public Accountants LLP has expressed its audit opinion on the effectiveness of financial report internal control of the Company in 2025 according to the relevant requirements in the Guidelines for Auditing of Enterprise Internal Controls and the Practice Standards for Certified Public Accountants of China. The auditing expenses of the Group for 2025 were about RMB10.2 million in total and the auditors of the Company did not provide non-audit services.
KPMG Huazhen LLP was proposed to be reappointed by the Company as the external auditor of the Company for 2026 to undertake audit and interim review for 2026, and Pan-China Certified Public Accountants LLP was proposed to be reappointed to undertake internal control audit for 2026. Their terms of appointment will last until the conclusion of the 2026 AGM (subject to approval at the 2025 AGM). The Company has not changed its external auditors over the past three years.
---
# Corporate Governance Report
## Other Stakeholders
Other stakeholders of the Company include customers, partners, social environment and regulators, details of which are set out in the 2025 ESG Report of the Company.
## Internal Control
### Board Statement
The Board acknowledges its responsibility for the Company’s risk management and internal control systems, and confirms that the Company’s risk management and internal control systems are appropriate and effective in achieving the objectives set out in Principle D2 of the Hong Kong Stock Exchange Code. The Board has respectively approved the 2025 Internal Control Evaluation Report and the 2025 Risk Management Evaluation Report of the Company. An unqualified opinion on the 2025 Internal Control Audit Report of the Company was issued by Pan-China Certified Public Accountants LLP.
### Risk Management
The Company has established a comprehensive risk management system with the principle of “**Unified Leadership, Hierarchical Management**”, including risk management strategy, organizational function system of risk management and risk executive information system. The Company identifies the risks and adopts qualitative and quantitative approaches to analyze and categorize the risks identified based on the possibility of occurrence and seriousness of impact of risks. Based on the result of risk analysis and the risk tolerance, the Company considers relevant risks and benefits and determines the focus points and major risks that require control, based on which it formulates risk control strategies. Please refer to the “Risk Management Report” for details of risk management.
### Structure of the Internal Control System
Based on the principle of “**unified theory and methods, multi-layer establishment and divided responsibilities**”, the Basic Standards of Internal Control for Enterprises (《企業內部控制基本規範》) and its guidelines, and taking into account of the business characteristics of the Company, the Company established the standards for internal control construction and management, and formed a collaborative system of internal control within the Company. The internal control system of the Company is designed to manage rather than completely eliminate the risk of failure to achieve its business objectives, and can only provide reasonable and not absolute assurance against material misstatement or loss.
The Board is the decision maker for internal control, and is responsible for the establishment and effective implementation of sound and effective internal control. The Audit and Risk Management Committee established under the Board exercises the functions and powers of the Supervisory Committee as stipulated in the Company Law, and oversees the implementation and evaluation of internal controls. The management is the executive body in charge of internal control, and is responsible for organizing and being in charge of the daily operation of internal control.
---
The Company formulated and the Board approved the Internal Control Manual of CGN Power Co., Ltd. The manual standardizes the relevant management systems and procedures of various businesses and functions of the Company, breaks down and specifies the internal control responsibilities, reasonably guarantees legal and compliant operation and management, and ensures the authenticity of financial reports.
| Key elements of internal control | Initiatives |
| :--- | :--- |
| **Internal environment** | - The corporate governance structure specifies the management authority at various levels
- Internal organizations and posts clearly define the allocation of responsibilities and powers
- Internal supervision system
- Corporate strategies
- Integrity and moral values and corporate culture
- Competency of staff |
| **Risk assessment** | Timely identifying and systematically analyzing risks associated with the realization of internal control objectives in the process of operation activities and reasonably determines strategies in response to risks |
| **Control activities** | - Taking corresponding control measures and formulating internal rules, systems and procedures based on the risk assessment results to ensure the implementation of control measures
- Covering major business areas such as funding activities, procurement, sales, engineering projects management, guarantee, R&D, business outsourcing, asset management and financial reporting
- Formulating control measures from the perspectives of, among others, separation of incompatible duties, authority approval, accounting system control, property protection, budgets, operation analyses and evaluation |
| **Information and communication** | Collecting and transmitting information related to internal control in a timely and accurate manner to ensure that the information is effectively transmitted within the Company, and between the company and external parties |
| **Internal supervision** | - Regularly evaluating the implementation of systems and procedures
- Independent internal monitoring and audit activities
- Self-assessment of internal control system on a regular basis |
---
# Corporate Governance Report
## Internal Control Evaluation
According to the relevant provisions of the Corporate Governance Code of the Company, we have prepared the Internal Control Assessment Proposal for 2025 of the Company. The Internal Control Assessment Proposal clearly provides the evaluation covers the full 2025 financial year, and determines the major units, businesses and matters to be included in the scope of evaluation as well as high-risk areas based on the risk-oriented principle. Such proposal was approved by the Audit and Risk Management Committee of the Board in August 2025.
The Board shall be responsible for the internal control system of the Group, and has obtained confirmation from the management of the Company on the effectiveness of the risk management and internal control systems of the Company and completed the review on the effectiveness of the operation of internal control system of the Group in 2025. In accordance with the approved internal control assessment proposal, entities included in the scope of the current internal control evaluation mainly comprised the Company and 45 major subsidiaries, which covered all business segments and major business areas of the Company; as at December 31, 2025, the aggregate net assets and operating revenue of the aforesaid companies represented 100% and 100% of the net assets and operating revenue of the Group, respectively. Each of those entities which are included in the relevant evaluation shall, based on its own business characteristics and key points of management, follow the principles of comprehensiveness and importance to incorporate key business areas and major business processes into the scope of evaluation. Overall, high-risk areas that need to be focused on mainly include, among others, construction projects, procurement business, and contract management. The aforesaid businesses and matters included in the scope of evaluation together with high-risk areas cover the major aspects of the Company’s operational management and there is no material omission.
Based on the determination of material defects in the internal control on the Company’s financial reporting, as at the benchmark date (December 31, 2025) of the internal control evaluation report, there were no material defects in the internal controls on the financial reporting of the Company, and the Board considers that the Company has maintained effective and adequate internal control on financial reporting in all material aspects in compliance with the requirements of the Regulated System of Internal Control for Enterprises (《企業內部控制規範體系》) and the relevant provisions.
Based on the determination of material defects in the internal control on the Company’s non-financial reporting, as at the benchmark date (December 31, 2025) of the internal control evaluation report, the Company was not aware of any material defect in the internal control on non-financial reporting. From the benchmark date of the internal control evaluation report up to the issue date of the internal control evaluation report, there were no factors which would affect the evaluation conclusion of effectiveness and adequacy of internal controls.
---
# Monitoring Inside Information
The measures for the management and control of inside information by the Company
- Specifying in the Staff Manual that unauthorized use of confidential or inside information is strictly prohibited.
- Regulating the channels of disseminating information externally.
- Formulating the information disclosure management system and its ancillary procedures in order to regulate the management requirements and handling procedures of inside information, and reviewing the implementation of these procedures every year.
- Providing relevant trainings on information disclosure to the Company’s management and staff of the subsidiaries and major affiliates on a sustained basis every year.
- Publishing special issues of case studies on typical capital market violations related to information disclosure and securities trading on a regular basis, and strengthening warnings on information disclosure and insider trading violations.
In 2025, we continued to provide training on information disclosure through various ways such as in-person training, video conferences, online examinations, and reading written materials. The Company conducted a learning session on the 1st issue of the regulatory briefings from the Shenzhen Securities Regulatory Bureau for all Directors, then incumbent supervisors and senior management in written form; provided special video conference training for newly appointed spokespersons and their support team staff of subsidiaries, and delivered special training combining on-site teaching and video conferences for the information disclosure contacts of the Company and its subsidiaries; organized an online examination on the fundamentals of information disclosure for all employees to promote learning through assessment, with over 90% of employees completing the training; and released three issues of a publication featuring case studies on capital market violation penalties, covering areas such as transactions and related party transactions, internal information coordination, appointment of senior management and changes in shareholdings of substantial shareholders, with its distribution progressively expanded to include the controlling shareholder. We conducted internal audits on information disclosure every six months to continuously improve our management level. In 2025, the Company achieved Grade A in the information disclosure assessment by the SZSE for the fifth consecutive year, and received recognition from the capital market.
# Conclusion
The Company is committed to improving its corporate governance. We believe that good corporate governance serves as a solid foundation for the continuous development of the Company, and is an indispensable element in creating value for our shareholders. The Company will further reinforce the commendable practices in corporate governance, continuously monitor the changes in relevant regulatory requirements, actively incorporate the opinions and recommendations from the investors, and constantly optimize corporate governance-related systems, thereby providing powerful support to the long-term and sustainable development of the Company.
---
# Directors' Report
## Operations
Major operations: We build, operate and manage NPPs, sell electricity generated by these NPPs, and organize and develop the design and R&D of NPPs.
## Financial Statements
For the Group's financial statements for the financial year ended December 31, 2025, please refer to pages 197 to 351.
## Five-Year Financial Highlights
The summary of operating results and financial information of the Group in the previous five financial years are set out in "Financial Highlights" on page 4 of this Annual Report. This summary does not form part of the audited consolidated financial statements.
## Earnings and Dividends
The details about the earnings of the Group for the year are set out in "Consolidated Income Statement" on pages 201 to 202 of this Annual Report.
Details of dividend payments and policy are set out in "Shareholder Value" on pages 24 to 26 and "Corporate Governance Report" on page 124 of this Annual Report.
## Business Review and Performance
For the analysis of business performance and its impact factors in 2025, please refer to "Finance, Assets and Investments" on pages 30 to 35 and "Business Performance and Outlook" on pages 38 to 55 of this Annual Report.
For the major risks and uncertainties faced by the Group, please refer to the "Risk Management Report" on pages 179 to 189 of this Annual Report.
The business outlook of the Group is discussed in different sections of this Annual Report, including the "Chairman's Statement" on pages 10 to 15, the "President's Review" on pages 16 to 23, the "Business Performance and Outlook" on pages 38 to 55, and the "Risk Management Report" on pages 179 to 189.
The relationships between the Group and its connected persons of major business are set out in the "Directors' Report" under "Corporate Governance" on pages 154 to 171 of this Annual Report.
Besides, the environment-related performance and policy of the Group are set out in the section headed "Environmental Capital" of this Annual Report. The social welfare-related performance and policy of the Group are set out in the section headed "Social and Relationship Capital" of this Annual Report. The discussion on compliance of relevant laws and regulations that would have a material impact on the Group is set out in the "Business Performance and Analysis" on pages 38 to 55, and the "Corporate Governance Report" on pages 101 to 153 of this Annual Report.
---
Save as disclosed in “Events after the Reporting Period” on page 164, no events that have a significant impact on the operations, financial condition, or business prospects of the Group had occurred from January 1, 2026 to the date of this Annual Report.
The above discussions form part of this Directors’ Report.
# Assets
## Fixed Assets and Construction in Progress
Additions to fixed assets and construction in progress of the Group for the year amounted to a total of approximately RMB33,459.4 million. In 2024 (restated), a total amount of approximately RMB28,292.9 million was added to fixed assets and construction in progress. Details of changes in fixed assets and construction in progress of the Group are set out in Note (V)13 and 14 to the Financial Statements.
## Bank Borrowings and Other Borrowings
The total borrowings of the Group as of December 31, 2025 amounted to approximately RMB271,943.2 million (2024 (restated): approximately RMB234,997.4 million). Details of borrowings are set out in Note (V)21, 29, 30, 31 and 32 to the Financial Statements.
## Finance Costs Capitalized
Finance costs amounting to approximately RMB1,926.4 million (2024 (restated): approximately RMB1,740.8 million) were capitalized by the Group during the year. The details are as set out in Note (V)49 to the Financial Statements.
## Major Subsidiaries
For the details of the Company’s major subsidiaries, please refer to Note (VIII) 1 to the Financial Statements and “Business at a Glance for the Year” on pages 5 to 8 of this Annual Report.
# Share Capital
## Issuance and Listing of Securities
The initial registered share capital of the Company at incorporation was RMB35,300,000,000, being divided into 35,300,000,000 domestic shares with a nominal value of RMB1.00 per share, and all the domestic shares were held by three promoters.
On December 10, 2014, the Company completed the IPO. The registered share capital of the Company was RMB45,448,750,000, being made up of 34,285,125,000 domestic shares and 11,163,625,000 H Shares.
On August 26, 2019, the Company completed the A Share IPO. The registered share capital of the Company increased to RMB50,498,611,100, being made up of 11,163,625,000 H Shares, 34,285,125,000 A Shares converted from original domestic shares and 5,049,861,100 newly issued A Shares.
---
# Directors' Report
On July 15, 2025 and July 25, 2025, the Company completed the issuance and listing of the A-share convertible bonds on the SZSE. As of the end of 2025, the A-share convertible bonds have not yet entered the conversion period.
## Purchase, Sale or Redemption of the Company's Listed Shares
During the year ended December 31, 2025, neither the Company nor any of its subsidiaries purchased, sold or redeemed any of the Company's listed shares or held any treasury shares.
## Equity-Linked Agreements
During the year ended December 31, 2025, neither the Company nor any of its subsidiaries entered into any equity-linked agreement.
## Changes in the Number of Shares and Shareholding Structure during the Reporting Period
| | December 31, 2024 | Increase/ (decrease) due to changes during the reporting period | December 31, 2025 |
| :--- | :---: | :---: | :---: |
| A Shares | 39,334,986,100 | 0 | 39,334,986,100 |
| H Shares | 11,163,625,000 | 0 | 11,163,625,000 |
| **Total number (Shares)** | **50,498,611,100** | **0** | **50,498,611,100** |
## Corporate Governance
The Company's corporate governance principles and practices are set out in the "Corporate Governance Report" on pages 101 to 107 of this Annual Report.
## Particulars of Board Meetings
The details of 2025 Board meetings of the Company are set out in "Particulars of Board Meetings" on page 134 of this Annual Report.
## Directors
On December 11, 2025, **Mr. Gao Ligang** resigned from his position as an executive Director as he had reached the age of retirement. On the same day, the role of **Mr. Pang Songtao** on the Board was re-designated from a non-executive Director to an executive Director.
The biographical details of current Directors are set out in "Board of Directors and Senior Management" on pages 94 to 97 of this Annual Report. Details of Directors' remuneration are set out in the "Remuneration Committee Report" on page 175 of this Annual Report and Note (XI)5(5) to the Financial Statements.
---
# Senior Management
On December 11, 2025, Mr. Gao Ligang resigned from his position as the president of the Company as he had reached the age of retirement. On the same day, the Board appointed Mr. Pang Songtao as the president of the Company with a term of office until December 31, 2027.
The biographical details of the senior management are set out in "Board of Directors and Senior Management" on pages 98 to 100 of this Annual Report. Details of the remuneration of the senior management are set out in the "Remuneration Committee Report" on page 175 of this Annual Report and Note (XI)5(5) to the Financial Statements.
# Interests
## Interests of Directors and Chief Executive Officer
Pursuant to the register required to be kept pursuant to Section 352 of Part XV of the Hong Kong Securities and Futures Ordinance, none of the Directors and Chief Executive Officer has any interests/short positions in the shares, underlying shares and debentures of the Company and its associated corporations as of December 31, 2025.
## Shareholders' Interests must be Disclosed under the Hong Kong Securities and Futures Ordinance
Pursuant to Divisions 2 and 3 of Part XV of the Hong Kong Securities and Futures Ordinance or the record in the register required to be kept pursuant to Section 336 of the Securities and Futures Ordinance, the interests/short positions of the following persons (other than the Directors and Chief Executive Officer of the Company) in the shares and underlying shares of the Company as at December 31, 2025 are set out in the following table.
### Aggregate long positions in the shares and underlying shares of the Company
The Company had been notified of the following shareholders' interests in the shares (other than equity derivatives under share options, call warrants or convertible bonds) of the Company as of December 31, 2025:
| Shareholders | Capacity as holder of shares | Number and class of the shares held in the Company | Approximate % of the underlying shares classes | Approximate % of the total issued shares of the Company |
| :--- | :--- | :--- | :--- | :--- |
| CGNPC | Beneficial owner | 29,176,641,375 (A Shares) | 74.17% | 57.78% |
| | | 560,235,000 (H Shares) | 5.02% | 1.11% |
| Hengjian Investment | Beneficial owner | 3,428,512,500 (A Shares) | 8.72% | 6.79% |
---
# Directors' Report
| Shareholders | Capacity as holder of shares | Number and class of the shares held in the Company | Approximate % of the underlying shares classes | Approximate % of the total issued shares of the Company |
| :--- | :--- | :--- | :--- | :--- |
| CITIC Securities Company Limited | Interest of controlled corporation | 2,281,563 (A Shares) | 0.01% | 0.00% |
| | | 2,016,018,000 (H Shares) | 18.06% | 3.99% |
| | Beneficial owner | 6,731,496 (A Shares) | 0.02% | 0.01% |
| | | 10,000,000 (H Shares) | 0.09% | 0.02% |
| Citigroup Inc.(Note 1) (Note 1: Among which 800,000 H Shares were held in listed derivatives and settled physically, and 18,547,000 H Shares were held in unlisted derivatives and settled in cash.) | Interest of controlled corporation | 147,217,888 (H Shares) | 1.32% | 0.29% |
| | Approved lending agent | 529,268,349 (H Shares) | 4.74% | 1.05% |
| BlackRock, Inc.(Note 2) (Note 2: Among which 24,696,000 H Shares were held in unlisted derivatives and settled in cash.) | Interest of controlled corporation | 660,841,416 (H Shares) | 5.92% | 1.31% |
## Aggregate short positions in the shares and underlying shares of the Company
**The Company had been notified of the following shareholders' holding short positions in the shares of the Company as of December 31, 2025:**
| Shareholders | Capacity as holder of shares | Number and class of the shares held in the Company | Approximate % of the underlying shares classes | Approximate % of the total issued shares of the Company |
| :--- | :--- | :--- | :--- | :--- |
| CITIC Securities Company Limited(Note 1) (Note 1: Among which 28,666,000 H Shares were held in unlisted derivatives and settled in cash, and 143,000 H Shares were held in unlisted derivatives and settled physically.) | Interest of controlled corporation | 28,809,000 (H Shares) | 0.26% | 0.06% |
| Citigroup Inc.(Note 2) (Note 2: Among which 1,598,400 H Shares were held in unlisted derivatives and settled in cash, and 22,875,723 H Shares were held in unlisted derivatives and settled physically.) | Interest of controlled corporation | 162,001,366 (H Shares) | 1.45% | 0.32% |
| BlackRock, Inc.(Note 3) (Note 3: Among which 103,237,000 H Shares were held in unlisted derivatives and settled in cash.) | Interest of controlled corporation | 155,763,000 (H Shares) | 1.40% | 0.31% |
---
# Interests of Other Persons
As of December 31, 2025, the Company had not been notified of any persons other than the above shareholders who had interests or short positions in the shares or underlying shares of the Company, under Divisions 2 and 3 of Part XV of the Hong Kong Securities and Futures Ordinance.
# Material Contracts with the Controlling Shareholder
Save as disclosed in the section headed "Connected Transactions" on pages 164 to 170 of this Annual Report, none of the Company or any of its subsidiaries entered into any material contract with the controlling shareholder or any of its subsidiaries other than the Group, nor was there any material contract between the Group and the controlling shareholder or any of its subsidiaries other than the Group in relation to provision of services.
# Controlling Shareholder's Interests in Material Contracts
The details of the material contracts entered into between the Company and the controlling shareholder or its subsidiaries have been disclosed in "Connected Transactions" on pages 164 to 170 of this Annual Report.
# Interests of Directors and Supervisors or Entities Connected with Directors and Supervisors in Material Transactions, Arrangements and Contracts
For the year ended December 31, 2025, none of the Company or any of its subsidiaries entered into any material transaction, arrangement or contract which the Directors and Supervisors (then incumbent) or the entities connected with Directors and Supervisors (then incumbent) of the Company had material interests, either directly or indirectly.
# Directors' Interests in Competing Businesses
For the year ended December 31, 2025, save as disclosed below, none of the Directors or their associates had any competing interests in any business which competed or was likely to compete, either directly or indirectly, with the business of the Company:
| Name of Director | Position in the Company | Other interests |
| :--- | :--- | :--- |
| Yang Changli | Chairman of the Board and non-executive Director | Chairman of CGNPC |
| Pang Songtao | Executive Director and president | Director and general manager of CGNPC |
| Li Li | Non-executive Director | Director of CGNPC |
---
# Directors’ Report
## Controlling Shareholder’s Non-competition Undertakings
CGNPC has undertaken that it would not, and it would procure that its associates and connected persons (other than any members of the Group) do not and would not, directly or indirectly, whether on its own account or in conjunction with or on behalf of any person, firm or company, among other things, carry on, participate, be interested or engaged in or acquire or hold (in each case whether as a shareholder, director, partner, agent, employee or otherwise be involved, whether for profit, reward or otherwise), any restricted business during the agreed restricted period.
CGNPC undertook to avoid horizontal competition in the Company’s A Share IPO prospectus, i.e. on the basis that CGNPC will continue to comply with the Deed of Non-competition and the China General Nuclear Power Corporation’s Undertaking to Avoid Horizontal Competition, CGNPC issued the China General Nuclear Power Corporation’s Letter of Undertaking on Further Avoiding Horizontal Competition (the “**Undertaking**”) to further avoid horizontal competition with the issuer. In December 2024, as approved at the 2024 second extraordinary general meeting of the Company, it was agreed that CGNPC would extend the deadline for investing its retained business in the Company by one year. Pursuant to which, CGNPC confirmed, undertook and guaranteed that:
1. CGN Power is the sole platform for final integration of nuclear power generation business of CGNPC.
2. If CGNPC acquires a business opportunity for new development or acquisition of nuclear power projects in the PRC, it will procure that such business opportunity is provided to CGN Power in priority, subject to applicable laws and regulations and the national requirements such as those in relation to qualification of major developer. If CGN Power waives or does not explicitly accept such business opportunity within a reasonable period of time, CGNPC may engage in such business opportunity on terms and conditions no less favourable than those provided to CGN Power.
3. Regarding the domestic retained business owned by CGNPC on the date of this Letter of Undertaking, taking into account the special nature of the nuclear power industry, CGNPC undertakes that it will invest in CGN Power in accordance with legal procedures no later than six years after the official commencement of construction of the nuclear power project (i.e. FCD), when such assets meet the requirements for investing in a listed company or upon agreement with CGN Power. Requirements for investing in a listed company include: (1) assets and equity are with clear titles; (2) there was no major administrative penalty in the past 36 months; (3) preservation and appreciation of state-owned assets; and (4) there are no other circumstances that are detrimental to the issuer’s continued stable development or to the interests of the issuer and its minority shareholders. When such assets are invested in a listed company, the valuation will be based on the results of asset appraisals filed with relevant authorities or valuation methods that meet the requirements of laws and regulations and relevant authorities, while fully taking into account the interests of the minority shareholders.
---
4. In the process of transferring the retained business, CGNPC undertakes that the issuer is entitled to the right of first refusal and acquisition option for the retained business proposed to be disposed of by CGNPC. Subject to the applicable laws and regulations, CGN Power has the right to acquire any equity, assets and other interests in the retained business and/or competitive business from CGNPC at one time or multiple times at any time, or CGN Power may, in ways as permitted by applicable laws and regulations, choose (including but not limited to) to entrust, lease or contract to operate the assets or business of CGNPC in such retained business and/or competitive business.
5. CGNPC undertakes that, if CGNPC violates this undertaking and causes CGN Power to suffer any loss from the effective date of this Letter of Undertaking, CGNPC shall bear the liability of compensation.
CGNPC confirms that it has complied with the above undertakings during the reporting period. For details of the material contracts under which CGNPC provided services to the Group, please refer to "Connected Transactions" on pages 164 to 170 of this Annual Report.
## Pre-emptive Rights
There are no provisions for pre-emptive rights under the Articles of Association or the relevant laws of the PRC, under which the Company is required to issue new shares to its existing shareholders on a pro rata basis.
## Distributable Reserves
As of December 31, 2025, our reserves available for distribution to our equity holders amounted to approximately RMB33,276.0 million (representing retained earnings of the parent company of approximately RMB33,276.0 million).
## Management Contracts
For the year ended December 31, 2025, except for the service contracts entered into with Directors and Supervisors (then incumbent), the Company did not enter into or had any contract in respect of the management or administration of the entire or any substantial part of its business.
---
# Directors’ Report
## Major Customers and Suppliers
### Major Customers
Most of our revenue comes from the sales of electricity generated by NPPs in which we have controlling interest. During the year, our total sales to our top five customers accounted for 96.39% of the Group’s total revenue. Below is the information of our top five customers in descending order:
1. **China Southern Power Grid Company Limited (“CSG”)** (representing 58.70% of our total revenue): The Group did not hold any interest in this company. CSG is a company under the SASAC. It is engaged in the investment, construction and operation management of the power grid in southern China, operation of relevant power transmission and distribution, power dispatch control, operation and maintenance of the power grid. Under a long-term agreement, the Group sold the electricity generated by the NPPs in Daya Bay, Ling’ao, Lingdong, Yangjiang, Taishan and Fangchenggang to Guangdong Power Grid Co., Ltd. and Guangxi Power Grid Co., Ltd. under CSG.
2. **State Grid Fujian Electric Power Co., Ltd.** (representing 14.70% of our total revenue): The Group did not hold any interest in this company. State Grid Fujian Electric Power Co., Ltd. is a company under State Grid Corporation of China. It is engaged in the operation of relevant power transmission and distribution, power dispatch control, operation and maintenance of the power grid. Under a long-term agreement, the Group sold the electricity generated by Ningde NPP to State Grid Fujian Electric Power Co., Ltd.
3. **CGNPC** (representing 12.69% of our total revenue): CGNPC, the controlling shareholder of the Company, is a large-scale power group engaging in the production and supply of clean energy-based electricity, and provision of related professional technical services. The Group mainly offers engineering services, technical support and maintenance services and general services to CGN Group.
4. **HKNIC** (representing 8.18% of our total revenue): This company is a subsidiary of CLP Holdings Limited (a company listed on the Hong Kong Stock Exchange (stock code: 0002)), holding a 25% equity interest in GNPJVC. It is a connected person of the Group. Under a long-term agreement, the Group sold some of the electricity generated by Daya Bay NPP to HKNIC.
5. **Ningde Second Nuclear** (representing 2.12% of our total revenue): During the reporting period, this company was a joint venture and a connected person of the Group, and is responsible for the investment, construction and operation of Ningde Phase II Project. The Group offers engineering services, technical support and maintenance services and general services to Ningde Second Nuclear.
---
# Major Suppliers
Our major suppliers include providers of nuclear fuel and related services, project construction and technical support. During the year, our purchases from our top five suppliers accounted for 59.44% of the Group’s total annual procurement. Below is the information of our top five suppliers in descending order:
1. **CGNPC (representing 31.46% of our total procurement):** CGNPC, the controlling shareholder of the Company, is a large-scale power group engaging in the production and supply of clean energy-based electricity, and provision of related professional technical services. The Group mainly purchases nuclear fuel supplies and services, general services and technical support and maintenance services from CGN Group.
2. **CNNC (representing 17.81% of our total procurement):** The Group did not hold any interest in this company. CNNC is mainly engaged in nuclear power, nuclear fuel cycle, nuclear technology application, nuclear environmental engineering and other fields of power production and supply, scientific and technology R&D, engineering construction and provision of related professional technical services and other businesses. The Group mainly purchases nuclear island construction and unit maintenance services from CNNC.
3. **China State Construction Engineering Corporation (“CSCEC”) (representing 4.16% of our total procurement):** The Group did not hold any interest in this company. CSCEC is mainly engaged in the construction and installation of infrastructure projects. The Group mainly purchases conventional islands construction and installation services from CSCEC.
4. **China Energy Engineering Group Co., Ltd. (中國能源建設集團有限公司) (representing 3.13% of our total procurement):** The Group did not hold any interest in this company. China Energy Engineering Group Co., Ltd. is mainly engaged in planning, consulting, surveying, design, engineering construction, and management services for energy projects such as hydropower, thermal power and nuclear power, as well as infrastructure projects such as water conservancy. The Group mainly purchases construction and installation services for conventional islands and NPP supporting facilities systems from China Energy Engineering Group Co., Ltd..
5. **Dongfang Electric Corporation (representing 2.88% of our total procurement):** The Group did not hold any interest in this company. Dongfang Electric Corporation is mainly engaged in the provision of various energy, environmental protection, chemical and other products and systems packages, trade, logistics and other services to global energy operators and other users. The Group mainly purchases nuclear power equipment, including nuclear islands and conventional islands, from Dongfang Electric Corporation.
---
# Directors' Report
Save as disclosed above, during the year, to the knowledge of Directors, none of our Directors or Supervisors (then incumbent), their respective close associates or any of our shareholders holding more than 5% of our issued shares (excluding treasury shares), held any interest in any of our top five suppliers or top five customers.
We uphold the philosophy of mutual benefit and win-win cooperation, and maintain close connections with our stakeholders including customers and suppliers. We adhere to the principles of openness, fairness, impartiality and compliance, and are committed to establishing a comprehensive tender system and supplier management system to enhance the quality management of upstream and downstream in the industry chain. Through constructive communication, we strive to balance the opinions and interests of various stakeholders, thereby setting the long-term development direction for the Company and the regions where we operate. Please refer to the 2025 ESG Report published by the Company for more information.
## Exchange Rate
For the year ended December 31, 2025, the Group has not encountered any major difficulty of its operations or liquidity due to exchange rate fluctuations. For the exposure to exchange rate fluctuations, we have been adhering to the principle of prudence, conducting timely debt hedging and risk prevention arrangements to reduce the impact of financial market volatility on the Company’s operating costs, expected earnings and cash flow. For the risk management of exchange rate volatility, please refer to the section headed “Financial Capital” on pages 77 to 82 of this Annual Report.
## Events after the Reporting Period
On January 5, 2026, Guangdong Nuclear Power Investment Co., Ltd., a subsidiary of the Company, and China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) entered into the Concerted Party Agreement. China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) agreed to act in concert with Guangdong Nuclear Power Investment Co., Ltd. at the shareholders’ meetings and the meetings of board of directors of Ningde Second Nuclear. The Group can lead the relevant activities of Ningde Second Nuclear.
The Concerted Party Agreement has taken effect from the date of signing and shall remain in effect for the duration of Ningde Second Nuclear. The Group acquired control of Ningde Second Nuclear from January 5, 2026, and included it in the scope of consolidated financial statements. Ningde Second Nuclear also changed from a joint venture of the Group to a subsidiary of the Group.
Save as disclosed above, no other events that have a significant impact on the operations, financial condition, or business prospects of the Group had occurred from January 1, 2026 to the date of this report.
## Connected Transactions
We follow the principles of fairness, impartiality, honesty, credibility, and competitive priorities in the course of our transactions with suppliers. For business with an open market, we employ competitive procurement methods and continue to require our connected persons to provide us with the relevant materials, products and services through a bidding process for regulating connected transactions. In the course of actual business operations, we have entered into one-off connected transaction agreements and continuing connected transaction agreements with our connected persons, which constitute major connected transactions of the Group in 2025, after taking into consideration our partnership established with connected persons, familiarity with their respective businesses, as well as factors such as service quality, price and work efficiency.
---
# One-off Connected Transactions
CGNPC is the controlling shareholder and a substantial shareholder of the Company, and thus CGNPC and its associates are our connected persons under Rules 14A.07(1) and (4) of the Listing Rules. The following transaction constitutes an one-off connected transaction between the Group and our connected persons.
## Acquisition of the Equity Interests in Five Companies from CGNPC
Reference is made to “Business at a Glance for the Year” in this report, in relation to the overview of Taishan Second Nuclear, Huizhou Nuclear, Huizhou Second Nuclear, Huizhou Third Nuclear and Zhanjiang Nuclear. In order to reduce the potential competition between the Group and CGNPC, expand the scale of the operating, constructing and potential installed capacity controlled by the Company, and further consolidate the leading industry status of the Company, the Company exercised its acquisition rights over the equity interests in the aforesaid companies on January 8 and October 16, 2025 respectively, and entered into relevant equity transfer agreements with CGNPC, pursuant to which CGNPC agreed to sell and the Company agreed to acquire the equity interests held by CGNPC in the aforementioned companies.
On January 8, 2025, the Board considered and approved the Company’s acquisition of 100% equity interest in Taishan Second Nuclear held by CGNPC. The consideration for the acquisition of the target interest was approximately RMB1,203.9 million, and the acquisition was completed in January 2025. On October 16, 2025, the Board considered and approved the Company’s acquisition of 82% equity interest in Huizhou Nuclear, 100% equity interest in Huizhou Second Nuclear, 100% equity interest in Huizhou Third Nuclear and 100% equity interest in Zhanjiang Nuclear held by CGNPC. The consideration for the acquisition of the target interest was approximately RMB9,375.4 million, and the acquisition was completed in October 2025. Taishan Second Nuclear, Huizhou Nuclear, Huizhou Second Nuclear, Huizhou Third Nuclear and Zhanjiang Nuclear have all become subsidiaries of the Company.
# Continuing Connected Transactions
Due to the fact that: (1) CGNPC is the controlling shareholder and a substantial shareholder of the Company; and (2) HKNIC, a wholly-owned subsidiary of CLP Holdings Limited, CLP Nuclear Power Operations & Management (China) Limited (中電核電運營管理(中國)有限公司), and CLP Nuclear Power (Yangjiang) Limited hold 25%, 12.5% and 17% of the equity interests in the Company’s subsidiaries GNPJVC, DNMC and Yangjiang Nuclear, respectively; under Rules 14A.07(1) and (4) of the Listing Rules, CGNPC and its associates, and CLP Holdings Limited and its associates are our connected persons.
---
# Directors' Report
During the year, the Company had entered into the following continuing connected transaction agreements with the connected persons as defined in the Listing Rules, and carried out the specific transactions according to the terms (including pricing policies) of such agreements. The continuing connected transactions carried out in 2025 are as follows:
| Nature of transaction | Annual Cap for 2025 (RMB million) | Actual Transaction Amount for 2025 (RMB million) |
| :--- | :---: | :---: |
| **General Services Framework Agreement⁽¹⁾** | | |
| Payment to CGN Group | 2,200.00 | 2,036.42 |
| Receipt from CGN Group | 100.00 | 54.94 |
| **Technical Support and Maintenance Services Framework Agreement⁽²⁾** | | |
| Payment to CGN Group | 5,400.00 | 3,811.56 |
| Receipt from CGN Group | 430.00 | 332.69 |
| **Engineering Services Framework Agreement⁽³⁾** | | |
| Receipt from CGN Group | 43,111.00 | 9,215.95 |
| **Financial Services Framework Agreement⁽⁴⁾** | | |
| Payment to CGN Group in relation to settlement, entrustment loans and other financial services | 10.00 | 4.17 |
| Maximum daily balance of deposits placed by the Group with CGN Group and interest income | 39,000.00 | 30,016.24 |
| Maximum daily balance of loans provided by CGN Group to the Group | 43,000.00 | 31,249.38 |
| **Nuclear Fuel Supply and Services Framework Agreement⁽⁵⁾** | | |
| Payment to CGN Group | 16,290.00 | 9,892.81 |
| **Electricity Supply Arrangement under the Joint Venture Contract⁽⁶⁾** | | |
| Tariff on sale of electricity to HKNIC | 8,331.00 | 6,194.69 |
---
## Notes:
1. It was renewed on October 23, 2024 on normal commercial terms, which would be valid until December 31, 2027, pursuant to which the Group and CGN Group will provide general services to each other. According to the 2025-2027 General Services Framework Agreement, the annual cap payable to CGN Group by the Group for 2025 amounted to RMB1,810.00 million. The annual cap were revised, and the related amounts are set out in the above table.
2. It was renewed on October 23, 2024 on normal commercial terms, which would be valid until December 31, 2027, pursuant to which the Group and CGN Group would provide technical services to each other. According to the 2025-2027 Technical Support and Maintenance Services Framework Agreement, the annual cap payable to CGN Group by the Group and the annual cap receivable from CGN Group for 2025 amounted to RMB3,430.00 million and RMB300.00 million, respectively. The above annual caps were revised, and the related amounts are set out in the above table.
3. It was renewed on March 17, 2022 on normal commercial terms, which would be valid until December 31, 2025, pursuant to which the Group would provide engineering services to CGN Group.
On March 26, 2025, the Company and CGNPC renewed the Engineering Services Framework Agreement on normal commercial terms, which would be valid until December 31, 2028, pursuant to which the Group would provide engineering services to CGN Group.
4. It was renewed on March 15, 2023 on normal commercial terms, which would be valid until December 31, 2026, pursuant to which CGN Group would provide financial services to the Group.
5. It was renewed on March 15, 2023 on normal commercial terms, which would be valid until December 31, 2026, pursuant to which CGN Group would provide nuclear fuel supplies and services to the Group.
6. It was entered into on January 18, 1985 and renewed on September 29, 2009 and would be valid until May 6, 2034, pursuant to which the Group would sell electricity to HKNIC.
On December 27, 2023, the 2023 Agreement on Increased Sales of Electricity to HKNIC was entered into on normal commercial terms, which would be valid until December 31, 2028, pursuant to which the Group would provide increased electricity sales services to HKNIC.
In addition to the above continuing connected transactions, our continuing connected transactions in 2025 included trademark license agreement and custodian service framework agreement, which were exempted from the reporting, annual review, announcement and independent shareholders’ approval requirements under Chapter 14A of the Listing Rules.
# Connected Transaction Management
To ensure the fairness, impartiality and openness of procurement business, we have formulated the internal control standards related to contract procurement management, whereby all departments of the Company shall mutually monitor and constrain each other, and the procurements that are within the scope of mandatory tendering as required by the Bidding Law and its related regulations shall be carried out through tendering in strict accordance with the relevant laws and regulations.
In accordance with the relevant requirements of the Hong Kong Stock Exchange and the SZSE in relation to the management of related party transactions and the experience of and feedback from the related party transaction management of the Company, we continue to improve our related party transaction management system and management procedures to standardize the pricing principles, methods, division of management responsibilities, decision-making authority and clarify information disclosure requirements for related party transactions. With regard to the management rules on related party transactions approved by the Board, the pricing principles for related party transactions are applied in the following order:
---
# Directors' Report
1. If the transaction is subject to a government-prescribed price, the price shall be directly applied;
2. If the transaction is subject to a government-guided price, the transaction price shall be reasonably determined within the range of the government-guided price;
3. In addition to the adoption of government-prescribed prices or government-guided prices, if the transaction has a comparable market price or charging standard of an independent third party, the transaction price shall be determined with priority reference to such price or standard;
4. If there is no comparable independent third-party market price for related matters, the transaction price shall be determined with reference to the transaction price between the seller and the third party independent of the transaction parties; and
5. If there is neither the market price of an independent third party nor the independent non-related transaction price for reference, a reasonable price shall be used as the basis for pricing, and such price shall be reasonable costs plus reasonable profits.
The related party transactions of the Group strictly adhere to the above pricing principles. For specific framework agreements and/or contracts, one or more pricing principles shall be applied in sequence according to the specific circumstances. The specific application of the pricing principles of the Company's other related party transaction framework agreements and/or contracts will be announced when such framework agreements and/or contracts are signed or renewed at an appropriate time in accordance with the applicable regulatory requirements.
The internal control measures we have adopted in the course of related party transactions are as follows:
1. We established a related party transaction management system, and all subsidiaries shall designate personnel for related party transaction management;
2. The Company's audit department conducts internal audits on related party transaction management on a semi-annual basis;
3. We conducted regular training and communication, covering the Group's personnel for related party transaction management and key related parties of CGNPC;
---
4. We update the list of related parties at least on a semi-annual basis; and
5. We conduct quarterly inspections and share good internal practices.
In 2025, we strictly complied with the latest regulatory requirements of the Hong Kong Stock Exchange and the SZSE in relation to related party transactions. The effective implementation of the Company’s rules and procedures on related party transactions ensured the effectiveness of internal control measures and ensured that the related party transactions took place are in compliance with the relevant laws and regulations.
### The independent non-executive Directors of the Company have examined the specific implementation of the continuing connected transactions, and confirmed that:
- The transactions were entered into in the ordinary and usual course of business of the Company;
- The transactions were carried out on normal commercial terms or more favorable terms;
- The transactions were carried out in accordance with the framework agreements in respect thereof, the terms of which were fair and reasonable and in the interest of our shareholders as a whole; and
- The Company has formulated appropriate and effective internal control procedures with sound operation.
We have also engaged an external auditor to review the Group’s continuing connected transactions to ensure that the transactions carried out under the framework agreements would be in compliance with the requirements under the Listing Rules. The Board has confirmed that the auditor has issued an unqualified letter in respect of the aforesaid continuing connected transactions in accordance with Rule 14A.56 of the Listing Rules and reported the results in this letter to the Board.
---
# Directors' Report
## The letter stated that:
- Nothing has come to their attention that causes them to believe that the disclosed continuing connected transactions have not been approved by the Board;
- For transactions involving the provision of goods or services by the Group, nothing has come to their attention that causes them to believe that the disclosed continuing connected transactions were not, in all material respects, in accordance with the pricing policies of the Group;
- Nothing has come to their attention that causes them to believe that the disclosed continuing connected transactions were not entered into, in all material respects, in accordance with the relevant framework agreements governing such transactions; and
- With respect to the aggregate amount of the continuing connected transactions, nothing has come to their attention that causes them to believe that the disclosed continuing connected transactions have exceeded the annual cap as set by the Company.
The Company has complied with the disclosure requirements under the listing rules of the places where the shares of the Company are listed.
## Related Party Transactions
Details of the significant related party transactions carried out in the normal course of business are set out in Note (XI) to the Financial Statements. Save as the connected transactions disclosed above, none of these related party transactions constitutes a discloseable connected transaction as defined under the Listing Rules.
## Permitted Indemnity Provisions
At no time during the year ended December 31, 2025 and up to the date of this report, there was or is, any permitted indemnity provision being in force for the benefit of any of the Directors and then incumbent Supervisors (whether made by the Company or other parties) or any of those of an associated company (if made by the Company).
The Company took out directors’ liability insurance for Directors and Supervisors (then incumbent) during the year. The relevant insurance covers the liability of Directors and Supervisors (then incumbent) and the related costs incurred by the Directors and Supervisors (then incumbent) in respect of potential legal proceedings against them arising out of corporate activities.
---
## Auditor
The consolidated financial statements for the year have been audited by KPMG Huazhen LLP, and its term of appointment shall expire on the date of the AGM of the Company.
## Remuneration Policy
For details of the Company’s remuneration policy, please refer to the section headed “Human Capital” on page 74 and the section headed “Remuneration Committee Report” on page 175 of this Annual Report.
## Remuneration of Directors and Five Individuals with the Highest Remuneration
Details of the remuneration of the Directors and the five individuals with the highest remuneration are set out in Note (XI)5(5) to the Financial Statements.
## Employee Retirement Benefits
For details of the Company’s employee retirement benefits, please refer to the section headed “Remuneration Committee Report” on page 175.
## Charitable Donations
For the year ended December 31, 2025, the Group adhered to the national planning on strengthening and amplifying the outcomes of poverty alleviation and full implementation of rural revitalization, and make active efforts in poverty alleviation to fulfill its social responsibilities. In 2025, the Group incurred a total of RMB28.5 million for rural revitalization, disaster relief and other donations.
**The Board of Directors**
March 25, 2026
---
# Audit and Risk Management Committee Report
## Composition and Duties
The members of the Audit and Risk Management Committee are appointed by the Board, and comprise three members, namely Ms. Xu Hua (徐華) (the chairman of the Audit and Risk Management Committee and an independent non-executive Director), Mr. Wong Ming Fung (王鳴峰) (an independent non-executive Director) and Mr. Li Fuyou (李馥友) (an independent non-executive Director). Their biographical details are set out in "Board of Directors and Senior Management" on pages 96 to 97 of this Annual Report.
The Board has delegated to the Audit and Risk Management Committee with written terms of reference prepared according to the Articles of Association, the Company Law, the listing rules of the places where the shares of the Company are listed, the Guide for Effective Audit Committees published by the Hong Kong Institute of Certified Public Accountants and other related provisions. The Audit and Risk Management Committee shall be responsible for examining the regular financial statements of the Company, the appointment of independent auditors, audit fees and other matters. The terms of reference are detailed in the Terms of Reference for the Audit and Risk Management Committee under the Board of Directors of CGN Power Co., Ltd. and are available on the websites of the Company, the SZSE and the Hong Kong Stock Exchange. For details, please refer to the "Corporate Governance Report" on pages 130 to 131 of this Annual Report.
The Audit and Risk Management Committee shall meet on a regular basis every year or convene any extraordinary meeting when necessary. The meetings shall discuss financial report, internal audit work plan and internal control and risk management related issues, and listen to work reports from the Company’s management, review the Company’s regular reports, etc. The Audit and Risk Management Committee may, if needed, engage relevant professional institutions and listen to experts’ advice from professional institutions before making decisions and recommendations to the Board.
## Annual Work Summary
In 2025, the Audit and Risk Management Committee paid full attention to the Company’s development, focused on the key areas and crucial process of the Company, and earnestly perform its duties in accordance with the national policies and regulations and the annual work plan of the Board. With the support from the Board and the cooperation of the relevant departments of the Company, the committee also advised on the Company’s management and operation based on the key focuses of the Company, enabling the Company to enhance the level of internal control and strengthen risk prevention and control capabilities, and thus exercised its functions as a special committee effectively.
---
In 2025, the Audit and Risk Management Committee convened five meetings to consider and review 34 resolutions. All members expressed independent opinions, which were reported to the Board by the chairman of the committee. The Audit and Risk Management Committee considered resolutions in relation to the interim and annual financial reports, quarterly reports, amendments to the terms of reference of the committee, the evaluation report on the duty performance of the independent auditors of the Company for 2024, the report on its oversight of the performance of the independent auditors for 2024, the appointment of audit firms of the Company for 2025, the 2024 ESG Report of the Company, the internal control assessment report of the Company for 2024, the risk management assessment report for 2024, the internal control assessment plan for 2025, the risk management assessment plan, and the independent auditors selection and engagement plan of the Company for 2026. The committee also considered the resolutions in relation to the annual plans concerning the relevant work such as the 2025 internal audit plan of the Company and work plan of the committee so as to make reasonable arrangement for the relevant audit and the work of the committee; reviewed the Company’s ESG management performance for 2024 and made recommendations for subsequent work.
All members actively performed the duties of the Audit and Risk Management Committee, reviewed and considered each and every resolution, made recommendations and requested relevant departments to implement them; provided advice on the reappointment and remuneration of the audit firms of the Company for the year, and regularly communicated with the independent auditors on audit plans and financial reports; oversaw the effective implementation of risk management and internal control and self-evaluation of internal control; monitored the preparation process of regular financial reports and reviewed the information related to regular financial reports and financial results announcements; understood the work status of the internal audit department and regularly listened to and formulated internal audit work, etc.
**Audit and Risk Management Committee**
March 25, 2026
---
# Remuneration Committee Report
## Composition and Duties
The members of the Remuneration Committee are appointed by the Board, and comprise three members, namely Mr. Wong Ming Fung (王鳴峰) (the chairman of the Remuneration Committee and an independent non-executive Director), Ms. Xu Hua (徐華) (an independent non-executive Director) and Mr. Feng Jian (馮堅) (a non-executive Director). Their biographical details are set out in "Board of Directors and Senior Management" on pages 95 to 97 of this Annual Report.
The Board has delegated to the Remuneration Committee with written terms of reference prepared according to the Articles of Association, the Company Law, the listing rules of the places where the shares of the Company are listed and other related provisions. The Remuneration Committee shall be mainly responsible for making recommendations on the remuneration of the Directors, Supervisors and senior management of the Company and other matters. The terms of reference are detailed in Terms of Reference for the Remuneration Committee under the Board of Directors of CGN Power Co., Ltd. and available on the websites of the Company, the SZSE and the Hong Kong Stock Exchange. For details, please refer to the "Corporate Governance Report" on page 132 of this Annual Report.
The Remuneration Committee shall meet at least once a year or convene any extraordinary meeting when necessary. The meetings shall listen to the work report of the Company's management, review the report of the Remuneration Committee, establish appraisal criteria for Directors and senior management and conduct appraisals accordingly, as well as formulate and review the remuneration policies and schemes for Directors and senior management, etc. The Remuneration Committee may, if needed, engage professionals and listen to expert advice from professional institutions before making decisions and recommendations to the Board.
## Annual Work Summary
In 2025, the Remuneration Committee convened five meetings to consider and review 10 resolutions. Independent opinions were expressed at each committee meeting, which were reported to the Board by the chairman of the committee. The Remuneration Committee considered the appraisal results of the Company's senior management for 2024, the appraisal results during their term of office for 2022-2024, the performance contracts for 2025, the performance contracts during their term of office for 2025-2027, the remuneration package for 2025, and also considered the performance evaluation results of independent non-executive Directors of the Company for 2024, the amendments to and rename of the Remuneration Proposal for the Directors of the Fourth Session of the Board of Directors and the Supervisors of the Fourth Session of the Supervisory Committee, the amendments to the Terms of Reference for the Remuneration Committee under the Board of Directors of CGN Power Co., Ltd, the amendments to the Remuneration Proposal for the Senior Management of the Company for 2025 and other resolutions, and made recommendation to the Board, and reviewed the its 2024 Work Report.
---
# Remuneration for Directors and Senior Management
The remuneration for the non-executive Directors appointed by the controlling shareholder and the participating shareholders of the Company shall be paid by the company they work for. The remuneration for the independent non-executive Directors appointed by the Company is determined according to the Measures on Performance Evaluation of Independent Directors (Trial) of CGN Power Co., Ltd. approved at the 2023 first EGM convened by the Company on February 10, 2023 as well as the results of the performance evaluation for the year.
The remuneration for executive Directors and employee representative Director of the Company is determined in accordance with the remuneration requirements of the Company.
The remuneration of senior management of the Company is determined in accordance with the remuneration requirements of the Company.
The sum of remunerations for Directors and senior management in 2025 are set out below. For details of the remuneration for Directors and senior management and the details of the remunerations for the five individuals with the highest remuneration, please refer to Note (XI)5(5) to the Financial Statements.
| | Fees RMB’000 | Salaries, other allowances and discretionary bonus RMB’000 | Pension scheme* contributions RMB’000 | Total RMB’000 |
| :--- | :---: | :---: | :---: | :---: |
| Directors | 300 | 1,863 | 135 | 2,298 |
| Senior management ** | – | 7,478 | 536 | 8,014 |
\# Remuneration data includes the settlement of bonuses under the performance evaluation plan for the three-year period from 2022 to 2024.
\* The Company contributes a certain proportion of the salaries of all the staff for their basic pension insurance according to the national and local regulations on pensions, and the staff will collect their pension according to the local polices upon retirement. In addition, the Company has also launched a corporate annuity plan. According to the plan, the Company will contribute an amount of not exceeding 8% of the individual contracted remuneration per month and the individuals will contribute an amount of not exceeding half of the contribution from the Company, and the staff can collect such pension from their individual accounts every month upon retirement. Other than these, the Company has no other responsibility for the pension scheme of the staff. The Company will not use forfeited contributions to reduce the existing contribution level.
\** The remuneration of executive Directors concurrently serving as senior management members is only listed in the remuneration of Directors. The figures in the table have been rounded.
**Remuneration Committee**
March 25, 2026
---
# Nomination Committee Report
## Composition and Duties
The members of the Nomination Committee are appointed by the Board, and comprise three members, namely Mr. Li Fuyou (李馥友) (the chairman of the Nomination Committee and an independent non-executive Director), Mr. Yang Changli (楊長利) (the Chairman and a non-executive Director) and Ms. Xu Hua (徐華) (an independent non-executive Director). Their biographical details are set out in “Board of Directors and Senior Management” on pages 94 to 97 of this Annual Report.
The Board has delegated to the Nomination Committee with written terms of reference prepared according to the Articles of Association, the Company Law, the listing rules of the places where the shares of the Company are listed and other related provisions. The Nomination Committee shall be responsible for reviewing the structure of the Board on a regular basis, making recommendations on the members of the Board and senior management officers, and verifying the independence of independent non-executive Directors. The terms of reference are detailed in the Terms of Reference for the Nomination Committee under the Board of Directors of CGN Power Co., Ltd. and are available on the websites of the Company, the SZSE and the Hong Kong Stock Exchange. For details, please refer to the “Corporate Governance Report” on page 133 of this Annual Report.
The Nomination Committee shall meet at least once a year or convene any extraordinary meeting where necessary. The meetings shall review the composition of the Board and the policy on Board diversity and the appointment of senior management, etc. The Nomination Committee may, if needed, engage relevant professional institutions and listen to their advice before making decisions and recommendations to the Board.
## Annual Work Summary
### Particulars of Meetings
In 2025, the Nomination Committee convened four meetings to consider and review 11 resolutions, which mainly included consideration of the appointment of senior management of the Company including the president, vice presidents, the secretary of the Board, the chief financial officer and the general counsel, consideration of the amendments to the terms of reference of the Nomination Committee, the plan for the re-election of the Board and other matters, and review of the Nomination Committee Report for 2024 and the structure and composition of the Board and other matters. Opinions were expressed by each committee member, which were reported to the Board by the chairman of the committee.
### Review of the Structure and Composition of the Board
The Nomination Committee reviewed the structure and composition of the Board in accordance with the Board Diversity Policy of the Company and confirmed the independence of independent non-executive Directors. The Nomination Committee considered that: the Board has a reasonable structure, the skills, knowledge, experience and diversity of Directors meet the governance requirements, and independent non-executive Directors express their opinions on profit distribution, execution of non-competition deeds, connected transactions and other matters by convening special meetings; the independent non-executive Directors have confirmed their independence by signing the independence confirmation letters, and the Company has yet to receive any personal information feedback from the independent non-executive Directors which will affect their independence.
---
The Nomination Committee has formulated a gender diversity plan for the Board members in accordance with the Board Diversity Policy of the Company and the latest requirements of the Listing Rules. This plan aims to ensure that there is at least one female member on the Board. This goal has been achieved following the re-election of the third session of the Board. According to the requirements of code provision B.3.5 of the Hong Kong Stock Exchange Code, the Company should appoint at least one director of a different gender to the Nomination Committee. On August 27, 2025, the Company adjusted the composition of the Nomination Committee by replacing Mr. Wong Ming Fung with Ms. Xu Hua as a member of the Nomination Committee. The current composition of the committee meets the gender diversity requirements for the Nomination Committee. Details of the Board Diversity Policy of the Company and the gender diversity of the Board members are set out in the Corporate Governance Report on page 143.
## Review of the Qualifications of Senior Management Candidates
The Nomination Committee reviewed the qualifications for the appointment of the president, vice presidents, the chief financial officer, the secretary of the Board and the general counsel, and reported to the Board.
## Director Nomination Policy
The Director Nomination Policy of CGN Power Co., Ltd. (《中國廣核電力股份有限公司董事提名政策》) sets forth (1) the responsibility of Director selection; (2) the nomination body for Directors; (3) the nomination procedure for Directors; (4) the qualifications of independent non-executive Directors; and (5) the resignation and term of office of directors, the re-election and selection of new session of the Board, and other matters.
The policy is available on the Company’s website.
**Nomination Committee**
March 25, 2026
---
# Nuclear Safety Committee Report
## Composition and Duties
The members of the Nuclear Safety Committee are appointed by the Board, and comprise five members, namely Mr. Yang Changli (楊長利) (the chairman of the Nuclear Safety Committee, the Chairman and a non-executive Director), Mr. Pang Songtao (龐松濤) (an executive Director), Mr. Feng Jian (馮堅) (a non-executive Director), Mr. Liu Huanbing (劉煥冰) (a non-executive Director) and Mr. Li Fuyou (李馥友) (an independent non-executive Director). Their biographical details are set out in “Board of Directors and Senior Management” on pages 94 to 97 of this Annual Report.
The Board has delegated to the Nuclear Safety Committee with written terms of reference prepared according to the relevant national laws, regulations, regulatory documents, the Articles of Association, the Procedural Rules of Board of Directors, and the actual situation of the Company. The terms of reference are detailed in the Terms of Reference for the Nuclear Safety Committee under the Board of Directors of CGN Power Co., Ltd. and are available on the websites of the Company, the SZSE and the Hong Kong Stock Exchange. For details, please refer to the “Corporate Governance Report” on page 134 of this Annual Report.
The Nuclear Safety Committee shall meet at least twice a year. The meetings shall discuss the internal nuclear safety management plan of the Company and listen to the reports on nuclear safety of the Company from the relevant departments of the Company and the assessment report on the Company by third party institutions and other matters. The Nuclear Safety Committee may, if needed, engage relevant professional institutions and listen to experts’ advice from professional institutions before making recommendations to the Board.
## Annual Work Summary
In 2025, the chairman and members of the Nuclear Safety Committee conducted inspections on safety management at Yangjiang, Huizhou and Lufeng Nuclear NPPs, respectively, emphasizing that the Company should always give utmost priority to safety, and adhere to the work style of “Strict Compliance, Prudent Decision-making, Detail-oriented and Fact-based Approach”, so as to ensure the safe and stable operation of all nuclear power generating units in operation and the high-quality production of all nuclear power generating units under construction.
In 2025, the Nuclear Safety Committee convened three meetings to consider and review five resolutions, namely consideration of the amendments to the terms of reference of the Nuclear Safety Committee, review of the periodic reports (two issues) on the Company’s safety and quality, its 2024 work report, and the 2025 safety inspection report of the Company. All members expressed independent opinions, which were reported to the Board by the chairman of the committee. The committee considered that the Company achieved sound performance in safety and quality in 2025, with various indicators exceeding expectations; the operation of the generating units in operation was stable in general, and all refuelling outages were completed as planned; the project construction of the generating units under construction made steady and orderly progress, and the three major control indicators, namely quality, progress and investment, were under control; the actions and requirements set forth by regulatory authorities concerning the enhancement of nuclear safety management were diligently implemented.
In 2026, the Nuclear Safety Committee will listen to the regular reports on safety and quality of the Company, and advise on tasks including the special rectification initiatives on comprehensive enhancement in nuclear safety management in the nuclear power industry, the safety and quality in the batch construction process of nuclear power projects and the improvement of the effectiveness of the quality assurance system, in order to continue to promote high-quality development of the Company, and ensure the achievement of operational objectives.
**Nuclear Safety Committee**
March 25, 2026
---
# Risk Management Report
## Risk Management Philosophy
We focus on our development strategies and objectives. We face various internal and external risks during the development of the business of the Company. It is imperative that we proactively identify and manage these risks by adopting risk management strategies to mitigate, avoid, transfer or manage such risks, while at the same time enhance operational effectiveness and efficiency, to create and safeguard the Company’s values. To this end, we are committed to improving our comprehensive risk management structure, strengthening our risk management capabilities, and nurturing a sound risk management culture. Risk management permeates every aspect of our operations and every stage of our business processes. Every employee of the Company is a safeguard to risk management.
## Risk Management Objectives, Strategies, Systems and Procedures
### Risk Management Objectives and Strategies
The risk tolerance of the Company refers to the level of risk that the Company is willing to undertake in order to achieve its own strategic and business objectives. The Board of the Company is responsible for assessing the risk the Company is willing to undertake, mainly based on the Company’s values, goals and resources, as well as compliance with laws and regulations. The reasonable level of risk that is acceptable to the Company must align with its development strategy, must be fully understood and controlled, and must not place the Company into the following risk scenarios: having a disruptive impact on the Company’s development; causing material financial losses that impair the Company’s business development capacity and/or cause serious damage to the Company’s financial management capacity; resulting in serious accidents that cause disruptions of operation/supply; constituting serious violations of external regulations that could lead to suspension of operations/license revocation and/or imposition of substantial fines; affecting the safety and the health of employees, contractors and the public; and harming the Company’s reputation or brand name.
We set up a risk management team that holds monthly meetings to assess and prioritize risks, while requiring all business units to identify the consequences and likelihood of risks, set risk control targets, and take corresponding risk mitigation strategies.
---
# Risk Management Report
## Risk Management Systems
The Company's risk management systems:
- To promote full identification and delivery of risk information to support the Board's access to risk information;
- To ensure the effective operation of the risk management system, and to clarify the roles and responsibilities for risk management; and
- To cover the following three different roles and responsibilities.
### (1) Decision making and monitoring – The Board
- To consider risk management report for the year, and to supervise, assess and examine the effectiveness of the operation of the Company's internal comprehensive risk management system;
- To monitor the major risks for the year, and to fulfill the management responsibilities of major risks;
- To discuss risk management and internal control systems with the management, and to ensure that the management has fulfilled its obligation on establishing effective systems;
- To study the significant or unusual matters reflected or to be reflected in the Company's reports and accounts, and to make adequate reference to the matters proposed by the Company's subordinate accounting and finance departments, supervision departments or auditors; and
- To study the important findings of risk management and internal control matters, and the relevant measures taken by the management.
---
## (2) Setting goals and solutions – Management of the Company
### The President
- To continuously improve risk management systems;
- To understand and know the various significant risks faced by the Company and their current status, and to approve major risk management solutions of the Company; and
- To continuously supervise and evaluate the effectiveness of establishing and operating the Company’s comprehensive risk management system.
### Risk Management Department
- To promote and facilitate the normal operation of the Company’s comprehensive risk management system and related risk management workflows;
- To organize and coordinate the routine work of comprehensive risk management;
- To guide and supervise all units to carry out comprehensive risk management; and
- To prepare the Company’s risk monitoring bulletins and risk assessment reports for the year.
## (3) Execution and reporting – the Company, its subsidiaries and affiliated companies
- To be responsible for the comprehensive risk management duties within their respective scope of business operation;
- To manage their respective specific risks;
- To submit their respective monthly risk monitoring reports and risk assessment reports for the year;
- To conduct their respective risk assessments according to the supervision of the Risk Management Department; and
- To perform investigations, assessments and analyses on their respective relevant risk incidents before, during and after such incidents take place.
---
# Risk Management Report
## Risk Management Procedures
We incorporate the Company’s social responsibilities, economic performance and development prospects into our risk management. With reference to the risk management of IAEA-TECDOC-1209, the risk management framework of the Committee of Sponsoring Organizations of the Treadway Commission (COSO) and ISO 31000:2009 risk management – principles and guidelines, we make continuous improvement to align with the leading standards and practices in the industry. Centered on our overall development and operational objectives, we implement fundamental risk management processes across all aspects of corporate management and in the course of business operation, which fosters a robust risk management culture and establishes a sound and comprehensive risk management system, thereby providing reasonably assured processes and methods for achieving our overall risk management objectives.
We always adhere to our consistent philosophy on risk management. By strengthening dynamic identification, regular assessment and active management of risk events, setting up a dedicated risk management team to manage risks, and taking other effective management initiatives, we continuously improve our risk management structure, and facilitate all business units to transition from risk warning to proactive risk management to consolidate the front line of risk management and prevention.
### Assessment of the Company
- To identify significant risks which may affect the Company’s business development and operation through risk assessment during the Company’s annual business planning for the next year.
- To analyze the internal and external situations for the next year by the Risk Management Department through procedures such as collecting, screening and sorting to find out significant risks the Company will face, and incorporate counter-measures against the significant risks identified into the Company’s business plans to ensure that appropriate management or monitoring measures will be adopted to avoid the negative effects of material risks on the Company’s business development and operation.
- To organize President specific meetings to consider and prepare the risk estimate and assessment report for the year which will be submitted to the Audit and Risk Management Committee for consideration and to the Board for approval.
### Quarterly risk monitoring
- To identify significant risks, and report them to the Board for review on a quarterly basis.
---
## Monthly risk monitoring
- The major business units of the Company will prepare their respective monthly risk monitoring reports as the basis for risk information collection.
- To assign the risk management team to assess, prioritize, report and discuss risks. They will selectively track risks that reveal a tendency of negative changes in the current month, and request the relevant business department or business unit to handle in a timely manner.
- The Risk Management Department will prepare a monthly risk monitoring report and submit it to the President and the Chairman for reporting the risk status of the current month.
## Risk management during the business development process
- When a business unit conduct major investment, such business unit must identify significant investment risks and put forward corresponding counter-measures according to the risk management requirements of the Company.
In our routine risk monitoring, we will identify new risks through a bottom-up aggregation of risk information, and assign the risk management team to conduct monthly risk assessments and identify the changes in the priority of major risks, and uncover potential risks that have not yet been identified, so as to address the impacts of risk changes for the year. Meanwhile, in the course of daily business operations and development, we will understand and detect emerging risks through various channels. We will timely evaluate and analyze new risks arising from changes in the external environmental, with a particular focus on monitoring those that escalate into major risk concerns.
# Key Risk Management Initiatives in 2025
In 2025, the Company actively responded to the internal and external challenges and opportunities. According to the changes of internal and external environment, we analyzed the situations, explored internal drivers, made active response and seized the opportunities to resolve the impacts of internal and external uncertainties on the Company’s development.
---
# Risk Management Report
In 2025, we identified the following major risks in our business development practices and took corresponding measures.
| Description of risks | Key changes | Key measures |
| :--- | :--- | :--- |
| **Safe and stable operation of NPPs**
We paid attention to the possible impacts of internal and external factors such as the potential risks and hidden dangers of the units, and seasonal natural disasters on the safe and stable operation of the units. | ↔
In 2025, the Group managed 28 nuclear power generating units in operation, same as compared with last year. | - Upheld a “zero tolerance” attitude towards nuclear safety hazards, and strengthened the investigation and management of hidden dangers and defects;
- Continued to promote the development of safety culture, pioneered a dynamic tracking mechanism for weaknesses in nuclear safety culture, made in-depth improvements in human performance with a focus on single-point failure and barrier repair, organized and carried out benchmarking for human performance maturity assessment, and persistently implemented the “Four Prohibitions and One Stringent Requirement” (prohibition of operation without rules and regulations, prohibition of non-compliance with procedures, prohibition of unmonitored operation, prohibition of operation with doubts, and strict implementation of STAR), to continuously consolidate and enhance human performance management;
- Strengthened management responsibilities for common technical issues, pushed forward the mitigation of common technical issues within a set timeframe through a “classified and tiered” approach, enhanced the management of major equipment, and formulated dedicated improvement plans to continuously improve equipment reliability;
- Strengthened precautions against seasonal natural disaster risks such as typhoons, floods and high temperatures, organized and conducted special inspections of thermal sinks, and continued to promote improvements to thermal sinks to ensure high-quality completion of energy supply tasks. |
**Legend:**
- ↓ Lower than the risk level of last year
- ↔ Same as the risk level of last year
- ↑ Higher than the risk level of last year
---
# Risks of sales of electricity
| Description of risks | Key changes | Key measures |
| :--- | :--- | :--- |
| The impact of the local economic development, local demand for electricity, accelerated power market reform and local power generation policies of the places in which they are located are posing challenges to the nuclear power sites in terms of sales of electricity. | ↑
- Demand and supply of power were eased in some provinces and regions where our nuclear power generating units are located during certain time periods;
- Power grid line construction projects affected power transmission;
- The spot electricity markets where our nuclear power generating units are located have gradually been rolled out and commenced operation, with new energy sources fully engaging in market-based transactions. Both the prices in the spot electricity markets and the prices of medium-to long-term contract transactions experienced a year-on-year decline;
- Due to extreme weather conditions such as typhoons and rainstorms, the units are operated at reduced power at the request of the power grid. | - Strengthened research and evaluation of policies related to electricity market reform, closely monitored policy directions regarding market-based nuclear power transactions, actively participated in the formulation of pilot implementation plans, increased communication and coordination with national competent departments, local governments and power grids, reduced external load, sought favorable arrangements for power generation, and increased on-grid power generation;
- Strengthened marketing efforts to cultivate quality major users and expand small-and medium-sized users through multiple channels. |
**Risk Level Indicators:**
- **↓**: Lower than the risk level of last year
- **⟷**: Same as the risk level of last year
- **↑**: Higher than the risk level of last year
---
# Risk Management Report
| Description of risks | Key changes | Key measures |
| :--- | :--- | :--- |
| **Control on projects under construction** | | |
| Project construction was in full swing, which required continuous attention to various risks during the construction phase to ensure high quality construction. | $\longleftrightarrow$
The Group’s batch construction of nuclear power projects applying HPR1000 technology made steady progress, presenting a trend of “continuous improvement in generating units”;
The Company managed 20 nuclear power generating units under construction, an increase of 4 units as compared to the end of last year. | - Insisted on “Safety First, Quality Foremost” as well as safety-based production and quality-oriented progress, continuously optimized the project construction management and control mechanism, implemented the primary responsibilities, and continued to pay close attention to the “six major controls” consisting of project safety, quality, environment, technology, progress, and investment;
- Further improved the closed-loop management mechanism for experience feedback, strengthened the feedback of operational experience to engineering, continued to promote the application of advanced construction technologies, and enhanced the digital and intelligent level of project construction;
- Continued to carry out nuclear safety education, improved the workers’ technical skills and awareness of safety and quality, enhanced the management on high-risk operations and major sources of danger, and pushed ahead the construction of units under construction with high quality. |
- $\downarrow$ Lower than the risk level of last year
- $\longleftrightarrow$ Same as the risk level of last year
- $\uparrow$ Higher than the risk level of last year
---
# Financial risks
| Description of risks | Key changes | Key measures |
| :--- | :--- | :--- |
| **As the Euro/RMB exchange rate fluctuated**, the foreign currency debts (mainly denominated in Euro) of the Company caused continuous fluctuation in our profit and loss of exchange rate.
**The fluctuating market interest rates** affected the debt financing cost of the Company. | ↔
In 2025, the Euro appreciated against the RMB;
In 2025, the RMB loan prime rate (“LPR”) was overall at a lower level, with both one-year and more than five-year LPRs declining. | - Reduced Euro debt exposure by repaying debts denominated in Euro through forward and spot purchase of foreign exchange;
- Managed new foreign currency debts by payments for foreign commercial contracts through spot purchase of foreign exchange in RMB;
- Set a solid term structure of debts to match our cash flows, thus reducing the effect of the fluctuating interest rates on the operations of the Company and the risk of refinancing;
- Issued A-share convertible bonds and medium-term notes to expand the size of direct financing, and secured support from the national “Special Bonds for Stabilizing Growth and Expanding Investment” for nuclear power project construction to optimize debt structure and reduce financing costs;
- Seized market opportunities to reasonably utilize domestic low-interest bank loans for loan replacement and further reduction in financing costs. |
**Risk Level Key:**
* **↓**: Lower than the risk level of last year
* **↔**: Same as the risk level of last year
* **↑**: Higher than the risk level of last year
In 2025, under our inspection, we are of opinion that the overall nuclear safety of nuclear power generating units in operation are under control; the overall project quality, progress and construction cost of the projects under construction are under control without material and adverse changes. In 2025, through internal and external efforts, we substantially achieved the power generation plan for the year.
---
# Risk Management Report
## Outlook for 2026 and Important Measures
In 2026, the Company will continue to promote risk management initiatives. Focusing on the operational objectives and key tasks for 2026, we will identify the significant risks that could impede the achievement of our targets, further enhance the effectiveness of our risk management, strengthen risk management responsibilities, and formulate and implement risk prevention and control measures, so as to ensure the achievement of the Company's development and operational objectives and create value for our shareholders.
The risk management objectives of the Company for 2026 are to adhere to the fundamental principles of "Safety First, Quality Foremost, Pursuit of Excellence" to ensure absolute safety and reliability in nuclear power operations; to persist in tackling challenges and properly mitigate major risks and potential issues; to reinforce the foundation and enhance our risk prevention and control capabilities and standards.
We will continue to fulfill our risk management responsibilities through internal control functions as well as business departments and units, and optimize our risk monitoring methods, so as to mitigate the impacts of significant risks on business development.
### As for safe and stable operation across multiple sites
- Continue to strengthen the management direction prioritizing nuclear safety, and consolidate and enhance outcomes in nuclear safety culture and leadership development; actively enhance internal safety levels, and promote the development of a risk-informed nuclear safety regulatory framework; systematically prevent and mitigate risks in safety, quality and environmental protection, continuously improve the effectiveness of the quality assurance system, and ensure absolute nuclear safety with zero failures.
- Focus on the goal of "zero unplanned outages and reduction of forced outage losses", and promote the elimination of hazards within a set timeframe; persistently facilitate improvements to cooling sources, prioritize enhancing power supply reliability, continuously improve the defense-in-depth capabilities against extreme natural disasters, and resolutely prevent unplanned shutdowns of multiple units within the same site; continuously promote excellence in outage management and complete the annual outage tasks with high quality; carry out special initiatives to enhance human performance, and continuously strengthen human error prevention management; intensify efforts to advance digital and intelligent operations, improve and refine the integrated construction-operation experience feedback system, and continuously enhance the effectiveness of experience feedback; formulate special plans for the safe and stable operation of newly commissioned units to ensure their high-quality commissioning and subsequent safe and stable operation.
---
# As for risks of sales of electricity
- Actively respond to market reforms, closely monitor policy directions regarding the entry of nuclear power into market-based transactions, actively participate in the formulation of pilot implementation plans, formulate marketing plans on a province-by-province basis, effectively control transaction risks, continuously optimize transaction strategies, develop major market users, and strive for more on-grid power generation and better price differential.
- Optimize the marketing system and mechanism of electricity market, adapt to the development of a new power system and the requirements of building a unified national power market, strengthen the team building capacity, and enhance the forward-looking, systematic and professional level of the marketing of electricity market.
# As for controls on projects under construction
- Continue to step up efforts to develop projects and push hard for project approval.
- Continuously improve and consolidate the capacity for project construction in batches, improve resource assurance levels, optimize management systems, actively manage potential risks, promote project construction in a "balanced, smooth and stable" manner, empower project construction quality and efficiency improvement through digital transformation, and achieve annual project construction goals while ensuring safety and quality.
- Reinforce skills training for employees, strengthen the feedback system, and continuously enhance the effectiveness of feedback.
- Continue to work on design optimization and technical improvement, and promote the implementation of design standardization to ensure safety and competitiveness.
In the face of increasing uncertainties in the business environment, the Company will monitor risks continuously and rigorously to safeguard the achievement of ours operational and strategic objectives.
---
# FINANCIAL REPORT
- 192 Audit Report
- 197 Consolidated Balance Sheet
- 199 Balance Sheet of the Parent Company
- 201 Consolidated Income Statement
- 203 Income Statement of the Parent Company
- 204 Consolidated Cash Flow Statement
- 206 Cash Flow Statement of the Parent Company
- 207 Consolidated Statement of Changes in Shareholders' Equity
- 208 Statement of Changes in Shareholders' Equity of the Parent Company
- 209 Notes to the Financial Statements
---
This page contains only a photograph and does not include any transcribable text, headings, lists, or tables according to the provided rules.
---
# Audit Report
KPMG Huazhen Shen Zi No. 2605512
To the Shareholders of 中國廣核電力股份有限公司 CGN Power Co., Ltd.,
## I. Opinion
We have audited the accompanying financial statements of 中國廣核電力股份有限公司 CGN Power Co., Ltd. (“CGN Power”), which comprise the consolidated and company balance sheets as at December 31, 2025, the consolidated and company income statements, the consolidated and company cash flow statements, the consolidated and company statements of changes in shareholders’ equity for the year then ended, and notes to the financial statements.
In our opinion, the accompanying financial statements present fairly, in all material respects, the consolidated and company financial position of CGN Power as at December 31, 2025, and the consolidated and company financial performance and cash flows of CGN Power for the year then ended in accordance with Accounting Standards for Business Enterprises issued by the Ministry of Finance of the People’s Republic of China.
## II. Basis for Opinion
We conducted our audit in accordance with China Standards on Auditing for Certified Public Accountants (“CSAs”). Our responsibilities under those standards are further described in the Auditor’s Responsibilities for the Audit of the Financial Statements section of our report. We are independent of CGN Power in accordance with the China Code of Ethics for Certified Public Accountants (“the Code”) and the independence requirements applicable to the audit of financial statements of public interest entities under the Chinese CPA Independence Standard No. 1 – Requirements for Independence in Auditing and Reviewing Financial Statements, and we have fulfilled our other ethical responsibilities in accordance with the Code. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
---
# III. Key Audit Matters
Key audit matters are those matters that, in our professional judgment, were of most significance in our audit of the financial statements of the current period. These matters were addressed in the context of our audit of the financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on these matters.
## Recognition of revenue from construction, installation and design services
Please refer to the accounting policy stated in “(III) Significant Accounting Policies and Accounting Estimates” 26 and “(V) Notes to Items in the Consolidated Financial Statements” 44 in Notes to the Financial Statements.
| Key audit matter | How the matter was addressed in our audit |
| :--- | :--- |
| In 2025, the revenue of CGN Power and its subsidiaries (“CGN Power Group”) comprised the revenue from construction, installation and design services of RMB11,341,026,494.18.
The construction, installation and design services of CGN Power Group were performance obligations to be satisfied over time, and CGN Power Group recognized revenue over the contract performance period by measuring the progress towards completion which was determined based on the proportion of contract costs incurred to the estimated total contract costs. | The audit procedures related to the recognition of revenue from construction, installation and design services primarily included:
- Understanding and evaluating the design and operational effectiveness of the key internal control of financial reporting regarding the recognition of revenue from construction, installation and design services;
- Selecting the construction, installation and design service contracts signed with customers, checking the principal terms therein, and evaluating whether the accounting policy for revenue recognition of the construction, installation and design service business of CGN Power Group complies with the requirements of the Accounting Standards for Business Enterprises;
- Selecting samples of actual costs incurred during the current year, and checking the costs against relevant supporting documents such as procurement contracts, acceptance certificates, payment application letters;
- Selecting samples of contract costs recognized before and after the balance sheet date, checking procurement contracts, acceptance certificates, payment application letters and other relevant supporting documents, in order to evaluate whether the actual costs incurred have been recorded in the appropriate accounting period; |
---
# Audit Report
## Recognition of revenue from construction, installation and design services (cont'd)
Please refer to the accounting policy stated in “(III) Significant Accounting Policies and Accounting Estimates” 26 and “(V) Notes to Items in the Consolidated Financial Statements” 44 in Notes to the Financial Statements.
| Key audit matter | How the matter was addressed in our audit |
| :--- | :--- |
| The management needs to make reasonable judgments on the progress of performing construction, installation and design services. Factors such as the estimated total contract cost require continuous evaluation and adjustment during contract execution, which involves significant management judgment and may be influenced by management bias. Accordingly, we identified the recognition of revenue from construction, installation and design services as a key audit matter. | - Selecting the completed contracts during the year, and comparing the management's estimated total contract costs at the end of the previous year with the actual costs to identify whether there is any indication of management bias;
- Selecting the projects for which the estimated total contract costs were adjusted during the year, inquiring of the management for the reasons of the adjustments, and checking the corresponding basis for the adjustments and whether they were properly approved;
- Selecting contracts that have not been completed at the end of the year, and checking the cost budget information;
- Selecting contracts that have not yet been completed by the end of the year, and inspecting construction site on-site, and interviewing project management department personnel to understand the actual progress of the projects; and
- Selecting contracts that have not yet been completed at the end of the year, and checking the performance progress at the end of the year and the accuracy of calculating the revenue recognized during the year. |
---
# IV. Other Information
CGN Power’s management is responsible for the other information. The other information comprises all the information included in 2025 annual report of CGN Power, other than the financial statements and our auditor’s report thereon.
Our opinion on the financial statements does not cover the other information and we do not express any form of assurance conclusion thereon.
In connection with our audit of the financial statements, our responsibility is to read the other information and, in doing so, consider whether the other information is materially inconsistent with the financial statements or our knowledge obtained in the audit or otherwise appears to be materially misstated.
If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.
# V. Responsibilities of Management and Those Charged with Governance for the Financial Statements
Management is responsible for the preparation and fair presentation of the financial statements in accordance with the Accounting Standards for Business Enterprises, and for the design, implementation and maintenance of such internal control necessary to enable that the financial statements are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, management is responsible for assessing CGN Power’s ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless management either intends to liquidate CGN Power or to cease operations, or has no realistic alternative but to do so.
Those charged with governance are responsible for overseeing CGN Power’s financial reporting process.
# VI. Auditor’s Responsibilities for the Audit of the Financial Statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditor’s report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with CSAs will always detect a material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these financial statements.
As part of an audit in accordance with CSAs, we exercise professional judgment and maintain professional skepticism throughout the audit. We also:
1. Identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control.
2. Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances.
3. Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by management.
---
# Audit Report
4. Conclude on the appropriateness of management’s use of the going concern basis of accounting and, based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on CGN Power’s ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditor’s report to the related disclosures in the financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditor’s report. However, future events or conditions may cause CGN Power to cease to continue as a going concern.
5. Evaluate the overall presentation, including the disclosures, structure and content of the financial statements, and whether the financial statements represent the underlying transactions and events in a manner that achieves fair presentation.
6. Obtain sufficient appropriate audit evidence regarding the financial information of the entities or business activities within CGN Power to express an opinion on the financial statements. We are responsible for the direction, supervision and performance of the group audit. We remain solely responsible for our audit opinion.
We communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.
We also provide those charged with governance with a statement that we have complied with relevant ethical requirements regarding independence, and communicate with them all relationships and other matters that may reasonably be thought to bear on our independence and, where applicable, related safeguards.
From the matters communicated with those charged with governance, we determine those matters that were of most significance in the audit of the financial statements of the current period and are therefore the key audit matters. We describe these matters in our auditor’s report unless law or regulation precludes public disclosure about the matter or when, in extremely rare circumstances, we determine that a matter should not be communicated in our report because the adverse consequences of doing so would reasonably be expected to outweigh the public interest benefits of such communication.
**KPMG Huazhen LLP**
Beijing, China
**Certified Public Accountants Registered in the People’s Republic of China**
Lin Qixing (The engagement partner)
Lin Xi
March 25, 2026
---
# Consolidated Balance Sheet
December 31, 2025
(Unit: RMB)
| Item | Notes | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- | :--- |
| | | | (Restated) |
| **Assets** | | | |
| Current assets: | | | |
| Cash at bank and in hand | (V)1 | 20,826,720,819.03 | 17,026,296,200.85 |
| Bills receivable | (V)2 | 3,597,149.26 | 9,681,081.65 |
| Accounts receivable | (V)3 | 8,012,247,248.15 | 9,107,069,903.30 |
| Prepayments | (V)4 | 20,492,880,205.04 | 20,077,549,379.52 |
| Other receivables | (V)5 | 848,384,841.25 | 1,083,868,581.41 |
| Inventories | (V)6 | 22,421,891,549.62 | 20,350,163,780.15 |
| Contract assets | (V)7 | 2,367,697,249.82 | 2,755,412,484.99 |
| Other current assets | (V)8 | 2,918,035,959.51 | 2,301,328,447.49 |
| **Total current assets** | | 77,891,455,021.68 | 72,711,369,859.36 |
| Non-current assets: | | | |
| Debt investments | (V)9 | 59,785,414.49 | 59,767,538.42 |
| Long-term equity investments | (V)10 | 17,431,133,822.99 | 15,636,457,668.96 |
| Other investment in equity instruments | (V)11 | 829,036,670.13 | 661,717,070.13 |
| Investment properties | (V)12 | 107,774,567.63 | 125,664,024.42 |
| Fixed assets | (V)13 | 252,433,030,622.08 | 263,048,805,386.72 |
| Construction in progress | (V)14 | 113,930,910,684.24 | 85,051,505,657.57 |
| Right-of-use assets | (V)15 | 1,095,543,026.88 | 1,230,139,018.25 |
| Intangible assets | (V)16 | 8,624,438,061.38 | 6,662,639,473.07 |
| Development costs | (VI)2 | 8,358,925,465.42 | 7,346,432,933.33 |
| Goodwill | (V)17 | 419,242,673.32 | 419,242,673.32 |
| Long-term deferred expenses | (V)18 | 690,330,119.82 | 1,792,436,070.41 |
| Deferred tax assets | (V)19 | 2,813,629,611.36 | 2,701,507,578.80 |
| Other non-current assets | (V)20 | 20,970,882,302.49 | 14,084,913,548.50 |
| **Total non-current assets** | | 427,764,663,042.23 | 398,821,228,641.90 |
| **Total assets** | | 505,656,118,063.91 | 471,532,598,501.26 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Consolidated Balance Sheet
December 31, 2025
(Unit: RMB)
| Item | Notes | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| **Liabilities and shareholders' equity** | | | |
| **Current liabilities:** | | | |
| Short-term loans | (V)21 | 42,151,119,949.93 | 17,734,748,583.43 |
| Derivative financial liabilities | (V)22 | - | 6,322,000.00 |
| Bills payable | (V)23 | 6,686,401,730.25 | 6,664,549,111.26 |
| Accounts payable | (V)24 | 20,236,601,119.62 | 20,600,854,664.66 |
| Receipts in advance | | 1,083,492.00 | 428,571.43 |
| Contract liabilities | (V)25 | 6,395,168,696.93 | 5,583,320,259.05 |
| Employee benefits payable | (V)26 | 61,625,774.08 | 57,374,371.90 |
| Taxes payable | (V)27 | 1,514,224,451.24 | 1,943,731,657.57 |
| Other payables | (V)28 | 9,551,632,550.49 | 5,949,386,815.58 |
| Non-current liabilities due within one year | (V)29 | 30,982,569,519.49 | 21,446,824,196.83 |
| Other current liabilities | (V)30 | 181,728,109.55 | 2,712,516,573.47 |
| **Total current liabilities** | | 117,762,155,393.58 | 82,700,056,805.18 |
| **Non-current liabilities:** | | | |
| Long-term loans | (V)31 | 190,203,390,940.15 | 191,999,218,538.11 |
| Bonds payable | (V)32 | 9,666,397,858.16 | 2,396,804,008.97 |
| Lease liabilities | (V)33 | 756,690,282.72 | 856,786,358.07 |
| Long-term employee benefits payable | (V)34 | 44,276,000.00 | 48,751,000.00 |
| Provisions | (V)35 | 7,501,521,532.93 | 6,994,417,652.42 |
| Deferred income | (V)36 | 1,864,975,031.64 | 2,089,726,062.19 |
| Deferred tax liabilities | (V)19 | 1,642,383,824.31 | 1,502,097,021.66 |
| **Total non-current liabilities** | | 211,679,635,469.91 | 205,887,800,641.42 |
| **Total liabilities** | | 329,441,790,863.49 | 288,587,857,446.60 |
| **Shareholders' equity:** | | | |
| Share capital | (V)37 | 50,498,611,100.00 | 50,498,611,100.00 |
| Other equity instruments | (V)38 | 52,207,895.90 | - |
| Capital reserve | (V)39 | 9,684,000,153.13 | 20,083,473,075.27 |
| Other comprehensive income | (V)40 | 868,746,595.95 | 875,151,998.05 |
| Specific reserve | (V)41 | 33,405,086.85 | 48,899,762.39 |
| Surplus reserve | (V)42 | 8,603,463,660.87 | 6,933,033,957.19 |
| Retained earnings | (V)43 | 53,448,039,580.41 | 50,145,960,763.40 |
| Total equity attributable to shareholders of the parent company | | 123,188,474,073.11 | 128,585,130,656.30 |
| Non-controlling interests | | 53,025,853,127.31 | 54,359,610,398.36 |
| **Total shareholders' equity** | | 176,214,327,200.42 | 182,944,741,054.66 |
| **Total liabilities and shareholders' equity** | | 505,656,118,063.91 | 471,532,598,501.26 |
These financial statements were approved by the board of directors on March 25, 2026.
The accompanying notes to the financial statements form an integral part of these financial statements.
The financial statements and notes were signed by the following persons in charge.
**Yang Changli**
Legal Representative (Chairman)
**Pang Songtao**
Executive Director
**Yin Engang**
Chief Financial Officer
**Wang Benfu**
Head of the Accounting Department
---
# Balance Sheet of the Parent Company
December 31, 2025
(Unit: RMB)
| Item | Notes | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- | :--- |
| **Assets** | | | |
| **Current assets:** | | | |
| Cash at bank and in hand | | 6,309,566,418.66 | 7,623,042,087.21 |
| Accounts receivable | (XV)1 | 421,608,392.33 | 421,437,861.53 |
| Prepayments | | 106,719,820.21 | 10,342,301.50 |
| Other receivables | (XV)2 | 2,960,051,493.38 | 2,242,158,593.27 |
| Non-current assets due within one year | | 3,109,333.35 | 2,875,331,944.47 |
| Other current assets | (XV)3 | 12,062,618,371.13 | 17,818,887,855.00 |
| **Total current assets** | | **21,863,673,829.06** | **30,991,200,642.98** |
| **Non-current assets:** | | | |
| Debt investments | (XV)4 | 5,139,785,414.49 | 4,024,767,538.42 |
| Long-term equity investments | (XV)5 | 111,583,364,002.37 | 93,743,431,153.41 |
| Fixed assets | | 35,202,854.27 | 51,186,150.92 |
| Construction in progress | | 80,994,796.89 | 84,819,061.91 |
| Right-of-use assets | | 99,838,608.46 | 159,741,773.50 |
| Intangible assets | | 661,158,545.07 | 182,771,262.37 |
| Development costs | | 6,993,178,515.92 | 6,139,777,729.54 |
| Other non-current assets | | 941,605,800.00 | 289,500,000.00 |
| **Total non-current assets** | | **125,535,128,537.47** | **104,675,994,670.07** |
| **Total assets** | | **147,398,802,366.53** | **135,667,195,313.05** |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Balance Sheet of the Parent Company
December 31, 2025
(Unit: RMB)
| Item | Notes | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- | :--- |
| **Liabilities and shareholders' equity** | | | |
| Current liabilities: | | | |
| Short-term loans | (XV)6 | 3,001,800,000.00 | – |
| Accounts payable | | 967,439,422.73 | 594,686,320.68 |
| Contract liabilities | | – | 5,008,743.69 |
| Employee benefits payable | | 5,366,449.55 | 2,064,728.95 |
| Taxes payable | | 31,088,766.82 | 32,288,203.21 |
| Other payables | | 7,396,726,962.11 | 14,282,382,196.35 |
| Non-current liabilities due within one year | | 136,524,636.50 | 3,596,487,821.15 |
| Other current liabilities | (V)30(1) | – | 2,522,489,178.08 |
| **Total current liabilities** | | **11,538,946,237.71** | **21,035,407,192.11** |
| Non-current liabilities: | | | |
| Long-term loans | (XV)7 | 3,636,000,000.00 | 260,000,000.00 |
| Bonds payable | (V)32 | 9,666,397,858.16 | 2,396,804,008.97 |
| Lease liabilities | | 41,369,728.38 | 101,866,807.83 |
| Deferred income | | 450,000.00 | 450,000.00 |
| Deferred tax liabilities | | 17,661,995.18 | – |
| **Total non-current liabilities** | | **13,361,879,581.72** | **2,759,120,816.80** |
| **Total liabilities** | | **24,900,825,819.43** | **23,794,528,008.91** |
| Shareholders' equity: | | | |
| Share capital | | 50,498,611,100.00 | 50,498,611,100.00 |
| Other equity instruments | (V)38 | 52,207,895.90 | – |
| Capital reserve | | 30,479,380,367.23 | 31,817,725,617.73 |
| Surplus reserve | | 8,191,772,220.77 | 6,521,342,517.09 |
| Retained earnings | | 33,276,004,963.20 | 23,034,988,069.32 |
| **Total shareholders' equity** | | **122,497,976,547.10** | **111,872,667,304.14** |
| **Total liabilities and shareholders' equity** | | **147,398,802,366.53** | **135,667,195,313.05** |
These financial statements were approved by the board of directors on March 25, 2026.
The accompanying notes to the financial statements form an integral part of these financial statements.
The financial statements and notes were signed by the following persons in charge.
**Yang Changli**
Legal Representative (Chairman)
**Pang Songtao**
Executive Director
**Yin Engang**
Chief Financial Officer
**Wang Benfu**
Head of the Accounting Department
---
# Consolidated Income Statement
2025
(Unit: RMB)
| Item | Notes | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| **I. Operating revenue** | (V)44 | 75,696,558,973.53 | 78,944,669,623.05 |
| Less: Operating costs | (V)44 | 51,478,963,727.86 | 49,395,836,080.96 |
| Tax and surcharges | (V)45 | 901,847,006.01 | 915,074,268.68 |
| Selling expenses | (V)46 | 36,516,264.02 | 47,454,286.64 |
| Administrative expenses | (V)47 | 2,861,892,008.23 | 2,679,046,988.30 |
| Research and development expenses | (V)48 | 1,916,903,471.42 | 2,442,885,957.10 |
| Finance costs | (V)49 | 4,523,422,012.41 | 5,133,290,991.25 |
| Including: Interest expenses | | 4,801,744,225.58 | 5,524,691,866.40 |
| Interest income | | 211,486,979.20 | 267,959,998.72 |
| Add: Other gains | (V)50 | 2,041,530,912.71 | 1,696,195,095.42 |
| Investment income | (V)51 | 2,353,145,464.96 | 1,932,890,838.93 |
| Including: Income from investment in associates and joint ventures | | 2,263,089,556.14 | 1,835,884,747.88 |
| Gains/(losses) from changes in fair value | (V)52 | 6,322,000.00 | (6,322,000.00) |
| Reversals of credit impairment | (V)53 | 36,990,594.36 | 164,096,533.21 |
| Asset impairment losses | (V)54 | (12,409,873.77) | (123,983,386.76) |
| Gains from disposal of assets | (V)55 | 22,852,022.34 | 11,390,954.31 |
| **II. Operating profit** | | 18,425,445,604.18 | 22,005,349,085.23 |
| Add: Non-operating income | (V)56 | 29,844,735.98 | 50,033,016.18 |
| Less: Non-operating expenses | (V)57 | (147,424,813.21) | 427,765,273.12 |
| **III. Total profit** | | 18,602,715,153.37 | 21,627,616,828.29 |
| Less: Income tax expenses | (V)58 | 3,871,570,988.37 | 4,159,486,181.63 |
| **IV. Net profit** | | 14,731,144,165.00 | 17,468,130,646.66 |
| (I) Classified by continuity of operations | | | |
| 1. Net profit from continuing operations | | 14,731,144,165.00 | 17,468,130,646.66 |
| 2. Net profit from discontinued operations | | - | - |
| (II) Classified by ownership | | | |
| 1. Net profit attributable to shareholders of the parent company | | 9,765,358,959.88 | 10,838,120,422.43 |
| 2. Non-controlling interests | | 4,965,785,205.12 | 6,630,010,224.23 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Consolidated Income Statement
## 2025
(Unit: RMB)
| Item | Notes | 2025 | 2024 (Restated) |
| :--- | :---: | :---: | :---: |
| **V. Other comprehensive income, net of tax** | | (47,977,775.35) | 175,790,782.38 |
| Other comprehensive income attributable to shareholders of the parent company, net of tax | | (6,405,402.10) | 145,794,385.85 |
| (I) Other comprehensive income that will not be reclassified to profit or loss | | 118,411,092.67 | 55,435,821.17 |
| 1. Change arising from remeasurement of defined benefit plan | | 1,022,875.00 | (2,368,875.00) |
| 2. Other comprehensive income that cannot be transferred to profit or loss under the equity method | | 401,035.48 | 642,174.55 |
| 3. Change in fair value of investment in other equity instruments | | 116,987,182.19 | 57,162,521.62 |
| (II) Other comprehensive income that may be reclassified to profit or loss | | (124,816,494.77) | 90,358,564.68 |
| 1. Other comprehensive income that can be transferred to profit or loss under the equity method | | – | – |
| 2. Translation differences arising from translation of foreign currency financial statements | | (124,816,494.77) | 90,358,564.68 |
| Other comprehensive income attributable to non-controlling interests, net of tax | | (41,572,373.25) | 29,996,396.53 |
| **VI. Total comprehensive income** | | 14,683,166,389.65 | 17,643,921,429.04 |
| Total comprehensive income attributable to shareholders of the parent company | | 9,758,953,557.78 | 10,983,914,808.28 |
| Total comprehensive income attributable to non-controlling interests | | 4,924,212,831.87 | 6,660,006,620.76 |
| **VII. Earnings per share** | | | |
| (I) Basic earnings per share | (V)59 | 0.193 | 0.215 |
| (II) Diluted earnings per share | (V)59 | 0.192 | 0.215 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Income Statement of the Parent Company
2025
(Unit: RMB)
| Item | Notes | 2025 | 2024 |
| :--- | :--- | :--- | :--- |
| **I. Operating revenue** | (XV)8 | 169,757,963.74 | 144,157,801.24 |
| Less: Operating costs | (XV)8 | 123,275,148.16 | 71,900,366.83 |
| Tax and surcharges | | 2,991,762.63 | 288,462.57 |
| Administrative expenses | | 683,278,587.93 | 562,864,604.25 |
| Research and development expenses | | 120,094,107.65 | 302,604,056.79 |
| Finance costs | | 233,858,178.94 | 176,810,815.42 |
| Including: Interest expenses | | 257,458,906.58 | 232,074,418.47 |
| Interest income | | 24,986,979.41 | 62,542,236.26 |
| Add: Other gains | | 1,639,824.50 | 1,983,359.48 |
| Investment income | (XV)9 | 17,696,143,610.52 | 3,532,584,927.84 |
| Including: Income from investment in associates and joint ventures | | 461,282,871.46 | 474,340,242.57 |
| Losses from credit impairment | | (304,075.68) | (5,094,713.94) |
| **II. Operating profit** | | 16,703,739,537.77 | 2,559,163,068.76 |
| Add: Non-operating income | | 938,191.44 | 261.84 |
| Less: Non-operating expenses | | 121,329.25 | — |
| **III. Total profit** | | 16,704,556,399.96 | 2,559,163,330.60 |
| Less: Income tax expenses | | 259,363.21 | — |
| **IV. Net profit** | | 16,704,297,036.75 | 2,559,163,330.60 |
| (I) Net profit from continuing operations | | 16,704,297,036.75 | 2,559,163,330.60 |
| **V. Other comprehensive income, net of tax** | | — | — |
| **VI. Total comprehensive income** | | 16,704,297,036.75 | 2,559,163,330.60 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Consolidated Cash Flow Statement
2025
(Unit: RMB)
| Item | Notes | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| **I. Cash flows from operating activities:** | | | |
| Cash received from the sales of goods and rendering of services | | 88,319,518,652.17 | 93,259,875,311.33 |
| Tax rebate received | | 1,801,838,972.39 | 1,489,890,546.91 |
| Other cash received relating to operating activities | (V)61(1) | 3,912,804,792.32 | 3,221,726,180.09 |
| **Subtotal of cash inflow from operating activities** | | **94,034,162,416.88** | **97,971,492,038.33** |
| Cash payments for goods purchased and services received | | 40,299,242,530.93 | 36,972,397,938.36 |
| Cash payments to and on behalf of employees | | 9,499,905,346.80 | 9,208,800,227.79 |
| Payments of various types of taxes | | 9,605,626,275.59 | 9,764,537,657.65 |
| Other cash payments relating to operating activities | (V)61(1) | 4,658,858,871.55 | 4,520,028,172.83 |
| **Subtotal of cash outflow from operating activities** | | **64,063,633,024.87** | **60,465,763,996.63** |
| **Net cash flows from operating activities** | (V)62(1) | **29,970,529,392.01** | **37,505,728,041.70** |
| **II. Cash flows from investing activities:** | | | |
| Cash received from disposal of investments | | 5,866,116.11 | – |
| Cash received from investment income | | 1,968,810,661.65 | 938,874,084.82 |
| Net cash received from disposal of fixed assets, intangible assets and other long-term assets | | 627,291,078.96 | 71,823,698.16 |
| Net cash received from disposal of subsidiaries | (V)62(2) | 2,252,840.76 | 91,213,852.23 |
| Other cash received relating to investing activities | (V)61(2) | 8,795,960,815.97 | 4,099,762,109.68 |
| **Subtotal of cash inflow from investing activities** | | **11,400,181,513.45** | **5,201,673,744.89** |
| Cash paid to purchase and construct fixed assets, intangible assets and other long-term assets | | 34,056,772,387.98 | 31,932,774,769.31 |
| Cash paid for investments | | 950,503,038.46 | 537,477,300.00 |
| Other cash paid relating to investing activities | (V)61(2) | 8,728,454,668.22 | 5,179,714,948.32 |
| **Subtotal of cash outflow from investing activities** | | **43,735,730,094.66** | **37,649,967,017.63** |
| **Net cash flow used in investing activities** | | **(32,335,548,581.21)** | **(32,448,293,272.74)** |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
(Unit: RMB)
| Item | Notes | 2025 | 2024 (Restated) |
| :--- | :---: | :---: | :---: |
| **III. Cash flows from financing activities:** | | | |
| Cash receipts from capital contributions | | 1,760,210,000.00 | 2,287,900,000.00 |
| Including: Cash receipts from capital contributions by minority shareholders of subsidiaries | | 378,460,000.00 | 101,930,000.00 |
| Cash received from borrowings | | 115,065,280,830.86 | 106,757,108,828.27 |
| Other cash received relating to financing activities | (V)61(3) | 4,201,000,000.00 | 36,399,291.72 |
| **Subtotal of cash inflow from financing activities** | | **121,026,490,830.86** | **109,081,408,119.99** |
| Cash repayments of borrowings | | 83,512,681,860.73 | 98,591,508,098.66 |
| Cash payments for distribution of dividends or profits or settlement of interest expenses | | 18,518,568,814.71 | 16,800,800,184.50 |
| Including: Payments for distribution of dividends or profits to minority shareholders of subsidiaries | | 7,377,978,139.76 | 5,248,842,945.82 |
| Other cash payments relating to financing activities | (V)61(3) | 12,318,345,410.37 | 345,534,050.65 |
| **Subtotal of cash outflow from financing activities** | | **114,349,596,085.81** | **115,737,842,333.81** |
| **Net cash flow from/(used in) financing activities** | | **6,676,894,745.05** | **(6,656,434,213.82)** |
| **IV. Effect of foreign exchange rate changes on cash and cash equivalents** | | **4,430,332.50** | **12,523,333.22** |
| **V. Net increase/(decrease) in cash and cash equivalents** | | **4,316,305,888.35** | **(1,586,476,111.64)** |
| Add: Opening balance of cash and cash equivalents | (V)62(3) | 9,133,709,620.39 | 10,720,185,732.03 |
| **VI. Closing balance of cash and cash equivalents** | (V)62(3) | **13,450,015,508.74** | **9,133,709,620.39** |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Cash Flow Statement of the Parent Company
2025
(Unit: RMB)
| Item | Notes | 2025 | 2024 |
| :--- | :--- | :--- | :--- |
| **I. Cash flows from operating activities:** | | | |
| Cash received from the sales of goods and rendering of services | | 172,824,406.83 | 173,522,007.87 |
| Other cash received relating to operating activities | | 34,940,682.81 | 88,324,914.14 |
| Subtotal of cash inflow from operating activities | | 207,765,089.64 | 261,846,922.01 |
| Cash payments for goods purchased and services received | | 89,317,728.91 | 84,116,100.00 |
| Cash payments to and on behalf of employees | | 269,699,902.53 | 273,593,653.71 |
| Payments of various types of taxes | | 2,994,382.98 | 288,462.57 |
| Other cash payments relating to operating activities | | 305,868,276.56 | 305,196,599.65 |
| Subtotal of cash outflow from operating activities | | 667,880,290.98 | 663,194,815.93 |
| **Net cash flows used in operating activities** | (XV)10 | (460,115,201.34) | (401,347,893.92) |
| **II. Cash flows from investing activities:** | | | |
| Cash received from disposal of investments | | 32,995,653,422.49 | 35,917,762,126.36 |
| Cash received from investment income | | 17,020,636,284.21 | 4,367,508,134.80 |
| Net cash received from disposal of fixed assets, intangible assets and other long-term assets | | 60,628.00 | 5,583,474.82 |
| Net cash received from disposal of subsidiaries | | 2,252,840.76 | 91,215,134.38 |
| Subtotal of cash inflow from investing activities | | 50,018,603,175.46 | 40,382,068,870.36 |
| Cash paid to purchase and construct fixed assets, intangible assets and other long-term assets | | 1,969,761,320.49 | 1,526,627,951.20 |
| Cash paid for investments | | 32,668,584,156.65 | 45,521,298,800.00 |
| Net cash paid for acquisition of subsidiaries and other business entities | | 11,961,058,100.00 | – |
| Other cash paid relating to investing activities | | 3,688,574.20 | 4,297,805.13 |
| Subtotal of cash outflow from investing activities | | 46,603,092,151.34 | 47,052,224,556.33 |
| **Net cash flow from/(used in) investing activities** | | 3,415,511,024.12 | (6,670,155,685.97) |
| **III. Cash flows from financing activities:** | | | |
| Cash received from borrowings | | 17,845,194,588.42 | 15,318,592,840.69 |
| Other cash received relating to financing activities | | 1,000,000.00 | 36,399,291.72 |
| Subtotal of cash inflow from financing activities | | 17,846,194,588.42 | 15,354,992,132.41 |
| Cash repayments of borrowings | | 17,010,290,741.56 | 3,424,222,000.51 |
| Cash payments for distribution of dividends or settlement of interest expenses | | 5,043,139,351.32 | 4,994,895,034.62 |
| Other cash payments relating to financing activities | | 62,015,648.23 | 67,793,050.55 |
| Subtotal of cash outflow from financing activities | | 22,115,445,741.11 | 8,486,910,085.68 |
| **Net cash flow (used in)/from financing activities** | | (4,269,251,152.69) | 6,868,082,046.73 |
| **IV. Effect of foreign exchange rate changes on cash and cash equivalents** | | 1,194.45 | (3,675.27) |
| **V. Net decrease in cash and cash equivalents** | | (1,313,854,135.46) | (203,425,208.43) |
| Add: Opening balance of cash and cash equivalents | (XV)10 | 7,620,333,054.12 | 7,823,758,262.55 |
| **VI. Closing balance of cash and cash equivalents** | (XV)10 | 6,306,478,918.66 | 7,620,333,054.12 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Consolidated Statement of Changes in Shareholders' Equity
2025
(Unit: RMB)
## 2025
| Item | Notes | Share capital | Other equity instruments | Capital reserve | Other comprehensive income | Specific reserve | Surplus reserve | Retained earnings | Subtotal (Attributable to shareholders of the Parent Company) | Non-controlling interests | Total shareholders' equity |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| I. Balance at January 1, 2025 | | 50,498,611,100.00 | - | 10,844,043,600.22 | 875,151,998.05 | 48,899,762.39 | 6,933,033,957.19 | 50,241,553,089.92 | 119,441,293,507.77 | 52,874,947,639.26 | 172,316,241,147.03 |
| Add: Business combination involving enterprises under common control | | - | - | 9,239,429,475.05 | - | - | - | (95,592,326.52) | 9,143,837,148.53 | 1,484,662,759.10 | 10,628,499,907.63 |
| II. Adjusted balance at January 1, 2025 | | 50,498,611,100.00 | - | 20,083,473,075.27 | 875,151,998.05 | 48,899,762.39 | 6,933,033,957.19 | 50,145,960,763.40 | 128,585,130,656.30 | 54,359,610,398.36 | 182,944,741,054.66 |
| III. Changes in the current year | | - | 52,207,895.90 | (10,399,472,922.14) | (6,405,402.10) | (15,494,675.54) | 1,670,429,703.68 | 3,302,078,817.01 | (5,396,656,583.19) | (1,333,757,271.05) | (6,730,413,854.24) |
| (I) Total comprehensive income | | - | - | - | (6,405,402.10) | - | - | 9,765,358,959.88 | 9,758,953,557.78 | 4,924,212,831.87 | 14,683,166,389.65 |
| (II) Shareholders' contributions and reduction in capital | | - | 52,207,895.90 | (10,399,472,922.14) | - | - | - | - | (10,347,265,026.24) | 374,549,255.97 | (9,972,715,770.27) |
| 1. Shareholders' capital contributions | | - | - | 1,381,750,000.00 | - | - | - | - | 1,381,750,000.00 | 378,460,000.00 | 1,760,210,000.00 |
| 2. Business combination involving enterprises under common control | (V)39 | - | - | (11,961,058,100.00) | - | - | - | - | (11,961,058,100.00) | - | (11,961,058,100.00) |
| 3. Capital contributions by holders of other equity instruments | (V)38 | - | 52,207,895.90 | - | - | - | - | - | 52,207,895.90 | - | 52,207,895.90 |
| 4. Others | (V)39 | - | - | 179,835,177.86 | - | - | - | - | 179,835,177.86 | (3,910,744.03) | 175,924,433.83 |
| (III) Profit distribution | | - | - | - | - | - | 1,670,429,703.68 | (6,463,280,142.87) | (4,792,850,439.19) | (6,658,953,016.47) | (11,451,803,455.66) |
| 1. Transfer to surplus reserve | (V)42 | - | - | - | - | - | 1,670,429,703.68 | (1,670,429,703.68) | - | - | - |
| 2. Distribution to shareholders | (V)43 | - | - | - | - | - | - | (4,792,850,439.19) | (4,792,850,439.19) | (6,658,953,016.47) | (11,451,803,455.66) |
| (IV) Specific reserve | (V)41 | - | - | - | - | (15,494,675.54) | - | - | (15,494,675.54) | 26,433,657.58 | 10,938,982.04 |
| 1. Transfer to specific reserve in the year | | - | - | - | - | 630,869,388.17 | - | - | 630,869,388.17 | 191,233,583.37 | 822,102,971.54 |
| 2. Amount utilized in the year | | - | - | - | - | (646,364,063.71) | - | - | (646,364,063.71) | (164,799,925.79) | (811,163,989.50) |
| IV. Balance at December 31, 2025 | | 50,498,611,100.00 | 52,207,895.90 | 9,684,000,153.13 | 868,746,595.95 | 33,405,086.85 | 8,603,463,660.87 | 53,448,039,580.41 | 123,188,474,073.11 | 53,025,853,127.31 | 176,214,327,200.42 |
## 2024
(Unit: RMB)
| Item | Notes | Share capital | Capital reserve | Other comprehensive income | Specific reserve | Surplus reserve | Retained earnings | Subtotal (Attributable to shareholders of the Parent Company) | Non-controlling interests | Total shareholders' equity |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| I. Balance at December 31, 2023 | | 50,498,611,100.00 | 10,794,337,306.25 | 729,357,612.20 | 104,420,586.57 | 6,677,117,624.13 | 44,432,050,938.38 | 113,235,895,167.53 | 52,068,051,691.54 | 165,303,946,859.07 |
| Add: Business combination involving enterprises under common control | | - | 7,269,459,475.05 | - | - | - | (119,839,524.13) | 7,149,619,950.92 | 1,268,662,759.10 | 8,418,282,710.02 |
| II. Adjusted balance at January 1, 2024 | | 50,498,611,100.00 | 18,063,796,781.30 | 729,357,612.20 | 104,420,586.57 | 6,677,117,624.13 | 44,312,211,414.25 | 120,385,515,118.45 | 53,336,714,450.64 | 173,722,229,569.09 |
| III. Changes in the current year | | - | 2,019,676,293.97 | 145,794,385.85 | (55,520,824.18) | 255,916,333.06 | 5,833,749,349.15 | 8,199,615,537.85 | 1,022,895,947.72 | 9,222,511,485.57 |
| (I) Total comprehensive income | | - | - | 145,794,385.85 | - | - | 10,838,120,422.43 | 10,983,914,808.28 | 6,660,006,620.76 | 17,643,921,429.04 |
| (II) Shareholders' contributions and reduction in capital | | - | 2,019,676,293.97 | - | - | - | - | 2,019,676,293.97 | 317,930,000.00 | 2,337,606,293.97 |
| 1. Shareholders' capital contributions | | - | 1,969,970,000.00 | - | - | - | - | 1,969,970,000.00 | 317,930,000.00 | 2,287,900,000.00 |
| 2. Others | | - | 49,706,293.97 | - | - | - | - | 49,706,293.97 | - | 49,706,293.97 |
| (III) Profit distribution | | - | - | - | - | 255,916,333.06 | (5,004,371,073.28) | (4,748,454,740.22) | (5,966,906,045.15) | (10,715,360,785.37) |
| 1. Transfer to surplus reserve | | - | - | - | - | 255,916,333.06 | (255,916,333.06) | - | - | - |
| 2. Distribution to shareholders | (V)43 | - | - | - | - | - | (4,748,454,740.22) | (4,748,454,740.22) | (5,966,906,045.15) | (10,715,360,785.37) |
| (IV) Specific reserve | | - | - | - | (55,520,824.18) | - | - | (55,520,824.18) | 11,865,372.11 | (43,655,452.07) |
| 1. Transfer to specific reserve in the year | | - | - | - | 736,466,935.35 | - | - | 736,466,935.35 | 210,808,412.27 | 947,275,347.62 |
| 2. Amount utilized in the year | | - | - | - | (791,987,759.53) | - | - | (791,987,759.53) | (198,943,040.16) | (990,930,799.69) |
| IV. Balance at December 31, 2024 | | 50,498,611,100.00 | 20,083,473,075.27 | 875,151,998.05 | 48,899,762.39 | 6,933,033,957.19 | 50,145,960,763.40 | 128,585,130,656.30 | 54,359,610,398.36 | 182,944,741,054.66 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Statement of Changes in Shareholders' Equity of the Parent Company
2025
(Unit: RMB)
## 2025
| Item | Share capital | Other equity instruments | Capital reserve | Surplus reserve | Retained earnings | Total shareholders' equity |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| I. Balance at January 1, 2025 | 50,498,611,100.00 | - | 31,817,725,617.73 | 6,521,342,517.09 | 23,034,988,069.32 | 111,872,667,304.14 |
| II. Changes in the current year | - | 52,207,895.90 | (1,338,345,250.50) | 1,670,429,703.68 | 10,241,016,893.88 | 10,625,309,242.96 |
| (I) Total comprehensive income | - | - | - | - | 16,704,297,036.75 | 16,704,297,036.75 |
| (II) Owners' contributions and reduction in capital | - | 52,207,895.90 | (1,338,345,250.50) | - | - | (1,286,137,354.60) |
| 1. Capital contributions by holders of other equity instruments | - | 52,207,895.90 | - | - | - | 52,207,895.90 |
| 2. Others | - | - | (1,338,345,250.50) | - | - | (1,338,345,250.50) |
| (III) Profit distribution | - | - | - | 1,670,429,703.68 | (6,463,280,142.87) | (4,792,850,439.19) |
| 1. Transfer to surplus reserve | - | - | - | 1,670,429,703.68 | (1,670,429,703.68) | - |
| 2. Distribution to shareholders | - | - | - | - | (4,792,850,439.19) | (4,792,850,439.19) |
| III. Balance at December 31, 2025 | 50,498,611,100.00 | 52,207,895.90 | 30,479,380,367.23 | 8,191,772,220.77 | 33,276,004,963.20 | 122,497,976,547.10 |
(Unit: RMB)
## 2024
| Item | Share capital | Capital reserve | Surplus reserve | Retained earnings | Total shareholders' equity |
| :--- | :--- | :--- | :--- | :--- | :--- |
| I. Balance at January 1, 2024 | 50,498,611,100.00 | 31,781,871,045.41 | 6,265,426,184.03 | 25,480,195,812.00 | 114,026,104,141.44 |
| II. Changes in the current year | - | 35,854,572.32 | 255,916,333.06 | (2,445,207,742.68) | (2,153,436,837.30) |
| (I) Total comprehensive income | - | - | - | 2,559,163,330.60 | 2,559,163,330.60 |
| (II) Owners' contributions and reduction in capital | - | 35,854,572.32 | - | - | 35,854,572.32 |
| 1. Others | - | 35,854,572.32 | - | - | 35,854,572.32 |
| (III) Profit distribution | - | - | 255,916,333.06 | (5,004,371,073.28) | (4,748,454,740.22) |
| 1. Transfer to surplus reserve | - | - | 255,916,333.06 | (255,916,333.06) | - |
| 2. Distribution to shareholders | - | - | - | (4,748,454,740.22) | (4,748,454,740.22) |
| III. Balance at December 31, 2024 | 50,498,611,100.00 | 31,817,725,617.73 | 6,521,342,517.09 | 23,034,988,069.32 | 111,872,667,304.14 |
The accompanying notes to the financial statements form an integral part of these financial statements.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (I) COMPANY OVERVIEW
CGN Power Co., Ltd. (the “Company”) is a joint stock company jointly established by 中國廣核集團有限公司 China General Nuclear Power Corporation (“CGNPC”), as the main promoter by way of contribution with equity of 11 companies involved in the development, investment, operation and R&D of NPPs as well as certain assets and liabilities in respect of the above businesses (the “Business Contribution”), together with other promoters by way of cash contribution in accordance with relevant provisions under PRC laws and administrative regulations, with approvals from the State-Owned Assets Supervision and Administration Commission of the State Council (the “SASAC”) through the Reply on the Matters Related to the Main Business Restructuring and Listing of China General Nuclear Power Corporation (Guo Zi Gai Ge [2013] No. 1005) (國資改革[2013]1005 號《關於中國廣核集團有限公司核電主業改制並上市有關事項的批覆》) dated December 4, 2013 and the Reply on the Establishment of CGN Power Co., Ltd. (Guo Zi Gai Ge [2014] No. 123) (國資改革[2014]123 號《關於設立中國廣核電力股份有限公司的批覆》) dated March 14, 2014. The Company was incorporated in Shenzhen, Guangdong Province on March 25, 2014, and obtained the business license (No. 440301109037551) issued by the State Administration of Industry and Commerce.
Upon establishment, the Company’s total share capital was RMB35,300,000,000.00, which was valued by 北京中企華資產評估有限責任公司(Beijing China Enterprise Appraisals Co., Ltd.), with final approval by the SASAC through the Reply on the Approval of the Asset Valuation Results to the Main Business Restructuring and Listing Project of China General Nuclear Power Corporation (Guo Zi Chan Quan [2014] No. 108) (《關於中國廣核集團有限公司核電主業改制並上市項目資產評估結果核准的批覆》(國資產權[2014]108 號)). CGNPC contributed RMB43,017,097,508.00, including valuation of the Business Contribution at RMB40,425,171,692.47 and cash contribution of RMB2,591,925,815.53, translating into 30,040,300,000 shares of the Company at a ratio of 69.83%, representing 85.10% of the total shares; Guangdong Hengjian Investment Holding Co., Ltd. contributed RMB5,054,888,074.00, translating into 3,530,000,000 shares at a ratio of 69.83%, representing 10.00% of the total shares; and China National Nuclear Corporation (formerly 中國核工業集團公司 China National Nuclear Corporation) (“CNNC”) contributed RMB2,476,895,156.00, translating into 1,729,700,000 shares at a ratio of 69.83%, representing 4.90% of the total shares.
As approved by the Reply on the Approval to Issue Overseas Listed Foreign Share of CGN Power Co., Ltd. (Zheng Jian Xu Ke [2014] No. 1165) (《關於核准中國廣核電力股份有限公司發行境外上市外資股的批覆》(證監許可[2014]1165 號)) issued by the China Securities Regulatory Commission (the “CSRC”) on November 3, 2014, and the Letter of Consent for Listing issued by the Stock Exchange of Hong Kong Limited (the “Hong Kong Stock Exchange”) on December 9, 2014, the Company publicly issued overseas listed foreign shares (H shares) in December 2014 and was listed on the Main Board of the Hong Kong Stock Exchange, with an initial offering size of 8,825,000,000 overseas listed foreign shares (H shares), and 1,323,750,000 shares issued and allotted due to the exercise of over-allotment option with a nominal value of RMB1.00 per share and an issuance price of HK$2.78 per share. Under the PRC regulations related to the disposal of state-owned shares, CGNPC, Guangdong Hengjian Investment Holding Co., Ltd. and CNNC are required to transfer the amount of domestic shares equivalent to 10% of offer shares to the National Council for Social Security Fund (“NCSSF”), totaling 1,014,875,000 shares. Upon the listing of the Company, shares held by the NCSSF were translated into H shares amounting to 1,014,875,000 shares on a one-for-one basis.
As approved by the Reply on Approval of the Initial Public Offer of Shares of CGN Power Co., Ltd. (Zheng Jian Xu Ke [2019] No. 1381) (《關於核准中國廣核電力股份有限公司首次公開發行股票的批覆》(證監許可[2019]1381 號)) issued by the CSRC on July 26, 2019, the Company issued RMB ordinary shares (A shares) under the public offer in August 2019 and the shares were listed on the SME Board of the Shenzhen Stock Exchange. A total of 5,049,861,100 RMB ordinary shares (A shares) were issued with a nominal value of RMB1.00 each. The issue price was RMB2.49 per share. The proceeds amounted to RMB12,574,154,139.00 in total. After deducting the issuance costs, the actual net proceeds amounted to RMB12,389,775,559.44, of which, RMB5,049,861,100.00 was included in the share capital and RMB7,339,914,459.44 was included in the capital reserve. The status of proceeds has been verified by Deloitte Touche Tohmatsu (Certified Public Accountants LLP), which has issued the Capital Verification Report (De Shi Bao (Yan) Zi (19) No. 00386).
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
The headquarters of the Company is located in Shenzhen, Guangdong Province. The parent of the Company is CGNPC. The ultimate beneficial owner of the Company is the SASAC.
The scope of business of the Company and its subsidiaries (the "Group") mainly includes: production and supply of electricity and heat generated mainly from nuclear energy, and provision of related professional technical services; organization and implementation of the construction and management for NPP construction projects; organization of the operation, repair and related services for NPPs; organization of the design development and scientific research for NPPs; and engagement in related investment, import and export businesses.
For the scope of consolidated financial statements for the reporting period, please refer to Note (VIII) "INTEREST IN OTHER ENTITIES". For the changes in the scope of consolidated financial statements, please refer to Note (VII) "CHANGES IN CONSOLIDATION SCOPE".
## (II) BASIS OF PREPARATION OF FINANCIAL STATEMENTS
### Basis of preparation
The Group adopts the Accounting Standards for Business Enterprises and relevant requirements promulgated by the Ministry of Finance of the People's Republic of China (the "Ministry of Finance"), and discloses relevant financial information in accordance with the Rules on the Preparation and Report of Information Disclosure for Companies Publicly Issuing Securities No. 15 – General Requirements for Financial Reports (Revised in 2023) (《公開發行證券的公司信息披露編報規則第 15 號 — 財務報告的一般規定(2023 年修訂)》). In addition, the financial statements also disclose information according to the relevant disclosure requirements under the Hong Kong Companies Ordinance and the Listing Rules of the Hong Kong Stock Exchange.
### Going concern
The Group has evaluated its ability of going concern for the next 12 months since January 1, 2026. There is no indication of major events that may affect the ability of going concern. Thus, the financial statements have been prepared under the assumption of going concern.
### Basis of accounting and principle of measurement
The Group's financial statements have been prepared on an accrual basis. Except for certain financial instruments which are measured at fair value, the financial statements are prepared under the historical cost convention. In the event that impairment of assets occurs, a provision for impairment is made accordingly in accordance with the relevant regulations. Under historical cost method, the amount of assets was measured at the fair value of cash or cash equivalents or consideration paid at the time of purchase. Liabilities were measured at the amount of money or assets and liabilities due to the current obligations actually received, or a present obligation of the contract amount, or the measurement of cash or cash equivalents in accordance with daily activities to repay the debts of the amount expected to be paid.
Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. Whether fair value is observable or measured by valuation techniques, the measurement and disclosure in these financial statements were all based on it.
Fair value measurements are categorized into three levels based on the degree to which the inputs to the fair value measurements are observable and the significance of the inputs to the fair value measurement in its entirety, which are described as follows:
- **Level 1 inputs** are quoted prices (unadjusted) in active markets for identical assets or liabilities that the entity can access at the measurement date.
- **Level 2 inputs** are inputs, other than the Level 1 inputs, that are observable for the asset or liability, either directly or indirectly.
- **Level 3 inputs** are unobservable inputs for the asset or liability.
---
# (III) SIGNIFICANT ACCOUNTING POLICIES AND ACCOUNTING ESTIMATES
## 1. Statement of compliance
The financial statements have been prepared in compliance with the Accounting Standards for Business Enterprises to truly and completely reflect consolidated and the parent company’s financial position of the Group as at December 31, 2025 and consolidated and the parent company’s operating results and cash flows for 2025.
In addition, the financial statements of the Group also complied with the Rules on the Preparation and Report of Information Disclosure for Companies Publicly Issuing Securities No. 15 – General Requirements for Financial Reports (《公開發行證券的公司信息披露編報規則第 15 號 - 財務報告的一般規定》) revised by the CSRC in 2023 on disclosure requirements regarding financial statements and notes thereto.
## 2. Accounting period
The Group has adopted the calendar year as its accounting year, i.e. from January 1 to December 31.
## 3. Operating cycle
Operating cycle refers to the period from assets purchased for production to cash or cash equivalents realized.
## 4. Functional currency
Apart from the functional currency of the primary economic environment of 廣東核電合營有限公司 Guangdong Nuclear Power Joint Venture Co., Ltd. (“GNPJVC”), a subsidiary of the Company, being USD, the functional currency of the primary economic environment that the Company and its other subsidiaries operate in is RMB. The Company adopts RMB to prepare the financial statements.
## 5. Determination method and selection basis of materiality standards
| Item | Materiality standards |
| :--- | :--- |
| Significant contract assets for which provision for bad debts has been individually made | A single amount accounts for 0.25% or more of the total assets |
| Significant prepayments aged more than one year | A single amount accounts for 0.25% or more of the total assets |
| Significant construction in progress | A single amount accounts for 0.50% or more of the total assets |
| Significant cash related to investing activities | A single cash flow accounts for 0.50% or more of total assets |
| Significant associates | The book value of long-term equity investments in associates accounts for 0.50% or more of the Group’s total assets |
| Significant non-wholly owned subsidiaries | The total revenue of non-wholly owned subsidiaries accounts for 5.00% or more of the Group’s total revenue |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 6. The accounting treatment of business combinations involving enterprises under common control and business combinations not involving enterprises under common control
If the Group obtains control of another or more companies (or a group of assets or net assets) which constitutes a business, such transaction or event constitutes a business combination. Business combinations are classified into business combination under common control and not under common control.
For transactions not involving enterprises under common control, the purchaser will consider whether to adopt the simplified judgment method of "concentration test" when determining whether the acquired assets combination constitute a business. If the combination passes the "concentration test", it is determined not to constitute a business. If the combination fails the "concentration test", it should still be determined according to business conditions. When the Group acquires a set of assets or net assets that do not constitute a business, the purchase cost shall be allocated on the basis of the relative fair value of the identifiable assets and liabilities acquired on the purchase date, instead of the being accounted for using the following accounting treatment methods for business combinations.
### (1) Business combinations involving enterprises under common control
A business combination involving enterprises under common control is a business combination in which all of the combining enterprises are ultimately controlled by the same party or parties both before and after the combination, and that control is not transitory. Assets and liabilities obtained in the business combination are recognized at their carrying amounts at the date of merger as recorded by the ultimate controlling party. The difference between the carrying amount of the portion of net assets obtained and the carrying amount of the consideration paid for the combination and/or aggregate face values of the shares issued is adjusted to the share premium in the capital reserves. If the share premium in the capital reserve is not sufficient to absorb the difference, any excess shall be offset with surplus reserve and retained earnings in sequence. Costs that are directly attributable to the business combination are charged to profit or loss when incurred.
### (2) Business combinations not involving enterprises under common control
A business combination involving enterprises not under common control is a business combination in which all of the combining enterprises are not ultimately controlled by the same party or parties before and after the combination.
The combination costs shall be the fair value of the assets paid, the liabilities incurred or assumed and the equity instruments issued by the acquirer in exchange for the control over the acquiree. For business combinations not involving enterprises under common control realized step by step through multiple transactions, the cost of combination is the sum of the consideration paid at the acquisition date and the fair value at the acquisition date of the acquirer's previously held interest in the acquiree. The overhead for the business combination of the combining party, including the expenses for audit, legal services, assessment, and other administrative expenses, shall be recorded in profit or loss for the period when incurred.
Identifiable assets, liabilities and contingent liabilities of acquiree qualifying for the conditions of recognition acquired by the acquirer in business combination are measured at fair value on the acquisition date.
For the difference that the combination cost is larger than the portion of fair value of net identifiable assets of acquiree acquired in combination, after taking into account the related deferred income tax effects, it is recognized as goodwill as an asset, and initially measured at cost. For those with combination cost lower than the portion of fair value of net identifiable assets of acquiree acquired in combination, re-verification is first carried out on the measurement of the fair value of all identifiable assets, liabilities and contingent liabilities as well as the combination cost. For those with combination cost still lower than the portion of fair value of net identifiable assets of acquire acquired in combination after re-verification, after taking into account the related deferred income tax effects, they are credited to profit or loss for the period.
Goodwill occurred as a result of business combination shall be recognized separately in the consolidated financial statements and measured at cost less accumulated impairment losses.
---
# 7. Judgment criteria of determining control and basis for preparation of consolidated financial statements
The scope of consolidated financial statements is determined on the basis of control. Control is achieved when the investor has power over the investee; is exposed, or has rights to receive variable returns from its involvement with the investee; and has the ability to use its power to affect its returns. Once the relevant facts and situation changed that altered the elements define control, the Group shall re-evaluate control.
Consolidation of a subsidiary begins when the Group obtains control over the subsidiary and ceases when the Group loses control of the subsidiary.
For a subsidiary disposed of by the Group, the operating results and cash flows before the date of disposal (the date when control is lost) are included in the consolidated income statement and consolidated statement of cash flows, as appropriate.
For a subsidiary acquired through a business combination involving enterprises not under common control, the operating results and cash flows from the acquisition date (the date when control is obtained) are included in the consolidated income statement and consolidated statement of cash flows, as appropriate.
No matter when the business combination occurs in the reporting period, subsidiaries acquired through a business combination involving enterprises under common control are included in the Group’s scope of consolidation as if they had been included in the scope of consolidation from the date when they first came under the common control of the ultimate controlling party. Their operating results and cash flows from the beginning of the earliest reporting period are included in the consolidated income statement and consolidated statement of cash flows, as appropriate.
The significant accounting policies and accounting periods adopted by the subsidiaries are determined based on the accounting policies and accounting periods consistently set out by the Company.
The effects of all intra-group transactions between the Company and subsidiaries and among the subsidiaries are eliminated on consolidation.
The portion of subsidiaries’ equity that is not attributable to the parent company is treated as non-controlling interests and presented as “non-controlling interests” in the consolidated balance sheet within shareholders’ equity. The portion of net profits or losses of subsidiaries for the period attributable to non-controlling interests is presented as “non-controlling interests” in the consolidated income statement below the “net profit” line item.
When the amount of loss for the period attributable to the minority shareholders of a subsidiary exceeds the minority shareholders’ portion of the opening balance of owners’ equity of the subsidiary, the excess amount is still allocated against non-controlling interests.
Acquisition of non-controlling interests or disposal of interest in a subsidiary that does not result in the loss of control over the subsidiary is accounted for as equity transactions. The carrying amounts attributable to shareholders of the parent company and non-controlling interests are adjusted to reflect the changes in their relative interests in the subsidiary. The difference between the amount by which the non-controlling interests are adjusted and the fair value of the consideration paid or received is adjusted to capital reserve. If the capital reserve is not sufficient to absorb the difference, any excess shall be offset with surplus reserve and retained earnings in sequence.
When the Group loses control over a subsidiary due to disposal of certain equity interest or other reasons, any retained interest is re-measured at its fair value at the date when control is lost. The difference between the aggregate of the consideration received on disposal and the fair value of any retained interest(s) and the share of the former subsidiary’s net assets cumulatively calculated from the acquisition date according to the original proportion of ownership interest is recognized as investment income in the period in which control is lost, and at the same time adjusted against goodwill. Except for the other comprehensive income arising from the change in net liabilities or net assets as a result of the remeasurement of defined benefit plan by the acquiree, other comprehensive income associated with investment in the former subsidiary is reclassified to investment income in the period in which control is lost.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 8. Classification of joint arrangements and accounting treatment for joint ventures
There are two types of joint arrangements – joint operations and joint ventures. The type of joint arrangements is determined based on the rights and obligations of joint operators to the joint arrangements by considering the factors, such as the structure, the legal form of the arrangements, and the contractual terms, etc. A joint operation is a joint arrangement whereby the joint operators have rights to the assets, and obligations for the liabilities, relating to the arrangement. A joint venture is a joint arrangement whereby the joint ventures have rights to the net assets of the arrangement.
## 9. Standards for determining cash and cash equivalents
Cash comprises cash in hand and deposits that can be readily withdrawn on demand. Cash equivalents are the Group’s short-term, highly liquid investments that are readily convertible to known amounts of cash and which are subject to an insignificant risk of changes in value.
## 10. Translation of transactions and financial statements denominated in foreign currencies
### (1) Transactions denominated in foreign currencies
A foreign currency transaction is recorded, on initial recognition, by applying the spot exchange rate on the date of the transaction.
At the balance sheet date, foreign currency monetary items are translated using the spot exchange rates at the balance sheet date. Exchange differences arising from the differences between the spot exchange rates prevailing at the balance sheet date and those on initial recognition or at the previous balance sheet date are recognized in profit or loss for the period, except that (1) exchange differences related to a specific-purpose borrowing denominated in foreign currency that qualify for capitalization are capitalized as part of the cost of the qualifying asset during the capitalization period; (2) exchange differences related to hedging instruments for the purpose of hedging against foreign currency risks are accounted for using hedge accounting.
Foreign currency non-monetary items measured at historical cost are translated into the amounts in functional currency at the spot exchange rates on the dates of the transactions. Foreign currency non-monetary items measured at fair value are re-translated at the spot exchange rate on the date the fair value is determined. Difference between the re-translated functional currency amount and the original functional currency amount is treated as changes in fair value (including changes of exchange rate) and is recognized in profit or loss or as other comprehensive income.
### (2) Translation of financial statements denominated in foreign currencies
For the purpose of preparing the consolidated financial statements, financial statements with USD as the functional currency are translated from the foreign currency into RMB using the following method: assets and liabilities on the balance sheet are translated at the spot exchange rate prevailing at the balance sheet date; owners’ equity items are translated at the spot exchange rates at the dates on which such items arose; all items in the income statement as well as items reflecting the distribution of profits are translated at exchange rates that approximate the actual spot exchange rates on the dates of the transactions; the difference between the translated assets and the aggregate of liabilities and owners’ equity items is recognized as other comprehensive income and included in shareholders’ equity in the consolidated financial statements.
Cash flows arising from a transaction in foreign currency and the cash flows of a foreign subsidiary are translated at an exchange rate which approximates the spot exchange rate on the date of the cash flows. The effect of exchange rate changes on cash and cash equivalents is regarded as a reconciling item and presented separately in the consolidated cash flow statement as “effect of foreign exchange rate changes on cash and cash equivalents”.
The opening balances and the comparative figures of previous year are presented at the translated amounts in the previous year’s financial statements.
---
On disposal of the Group’s entire interest in a foreign operation, or upon a loss of control over a foreign operation due to disposal of certain interest in it or other reasons, the Group transfers the accumulated exchange differences arising on translation of financial statements of this foreign operation attributable to the shareholders’ equity of the parent company and presented under shareholders’ equity in the consolidated balance sheet, to profit or loss in the period in which the disposal occurs.
In case of a disposal or other reason that results in a reduction in the proportional interest held but does not result in losing control over a foreign operation, the proportionate share of accumulated exchange differences arising on translation of financial statements are re-attributed to non-controlling interests and are not recognized in profit and loss. For partial disposals of equity interests in foreign operations which are associates or joint ventures, the proportionate share of the accumulated exchange differences arising on translation of financial statements of foreign operations is reclassified to profit or loss.
## 11. Financial instruments
Financial assets and financial liabilities are recognized when the Group becomes a party to the contractual provisions of the financial instrument.
For financial assets purchased and sold in regular way, the assets to be received or liabilities to be repaid on the settlement date are recognized on the transaction date, or the financial assets and receivables to be delivered on the settlement date are derecognized on the transaction date and the relevant profit or loss is recognized.
The financial assets and liabilities were initially recognized at fair value. For the financial assets and liabilities measured at fair value through profit or loss (“FVTPL”), related transaction expenses are charged to the profit or loss, for other financial assets and liabilities, related transaction expenses are included in the initial recognized amount. When initially recognized by the Group according to the Accounting Standards for Business Enterprises No. 14 – Revenue (the “New Standards for Revenue”), accounts receivable that do not contain a significant financing component or for which the financing component in the contract within 1 year is not considered are initially recognized at the transaction price defined under the New Standards for Revenue.
The effective interest rate method is a method of calculating the amortized cost of a financial asset or a financial liability and of allocating the interest income or interest expense over each accounting period.
The effective interest rate is the rate that exactly discounts estimated future cash flow through the expected life of the financial asset or financial liability to the book balance of a financial asset or to the amortized cost of a financial liability. In determining the effective interest rate, expected cash flow is estimated after taking into account all contract terms of financial assets or financial liabilities, including early repayment, extension, call option or other similar options, without considering expected credit loss.
The amortized cost of financial assets or financial liabilities is calculated by deducting repaid principal amount from initially recognized amount of the financial assets or financial liabilities, adding or subtracting the accumulated amortization amount which is the amortized difference between the initial recognition amount and the amount at the expiry date using the effective interest rate method, then further deducting the accumulated impairment of loss (only applicable to financial assets).
### (1) Classification, recognition and measurement of financial assets
#### (a) Classification of financial assets of the Group
The classification of financial assets is generally based on the business model in which a financial asset is managed and its contractual cash flow characteristics. On initial recognition, a financial asset is classified as measured at amortized cost, at fair value through other comprehensive income (“FVTOCI”), or at FVTPL.
If contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding, and the financial asset is held within the Group’s business model whose objective is to hold financial assets in order to collect contractual cash flows, such asset is classified into financial asset measured at amortized cost. Such financial asset mainly includes cash at bank and in hand, bills receivable, accounts receivable and other receivables, etc.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
If contractual terms of the financial asset give rise on specified dates to cash flows that are solely payments of principal and interest on the principal amount outstanding, and the financial asset is held within the Group’s business model whose objective is to hold financial assets in order to collect contractual cash flows and sell the financial asset, such asset is classified into financial asset measured at FVTOCI. Such financial asset is presented as other debt investments. The debt investments due within 1 year (inclusive) from the balance sheet date are presented in noncurrent assets due within one year; other debt investments due within 1 year (inclusive) when they are acquired are presented in other current assets.
On initial recognition, the Group may, on the basis of individual financial asset, irrevocably designate equity instrument investments not held for trading (excluding contingent considerations) recognized in business combination not under common control as financial assets at FVTOCI. Such financial assets are stated as investment in other equity instruments.
Apart from the derivative financial assets presented in financial assets held for trading, financial assets at FVTPL includes financial assets at FVTPL and those designated as at FVTPL. The assets due more than 1 year and expected to be held for more than 1 year are presented in other non-current financial assets.
- Both financial assets fail to qualify as at amortized cost or at FVTOCI are classified into financial assets at FVTPL.
- On initial recognition, the Group may irrevocably designate a financial asset as measured at FVTPL if doing so eliminates or significantly reduces an accounting mismatch and includes mixed contract conditions of embedded derivatives.
If a financial asset meets one of the following conditions, it is considered that such asset is held by the Group for trading:
- The purpose of obtaining such financial asset is mainly for selling in the near future.
- Such financial asset is part of the identifiable financial instrument portfolio that is centrally managed at initial recognition, and there is objective evidence that short-term profit model exists in the near future.
- Such financial asset is a derivative, except for derivatives that meet the definition given in the financial guarantee contract and derivatives that are designated as effective hedging instruments.
The business model for managing the financial assets refers to how the Group manages its financial assets in order to generate cash flows. That is, the Group’s business model determines whether cash flows from managing financial assets will result from collecting contractual cash flows, selling financial assets or both. The Group determines the business model for managing the financial assets according to the facts and based on the specific business objective for managing the financial assets determined by the Group’s key management personnel.
In determining whether the contractual cash flows generated from a financial asset on a specific date are solely payments of principal and interest based on the principal amount outstanding, the Group assesses the characteristics of the contractual cash flows of such financial asset. For such purposes, “principal” is defined as the fair value of the financial asset on initial recognition. “Interest” is defined as consideration for the time value of money and for the credit risk associated with the principal amount outstanding during a particular period of time and for other basic lending risks and costs, as well as a profit margin. The Group also assesses whether the financial asset contains a contractual term that could change the timing or amount of contractual cash flows such that it would not meet this condition.
---
## (b) Subsequent measurement of financial assets of the Group
### Financial assets at amortized cost
Financial assets at amortized cost adopt the effective interest rate method and subsequently measured at amortized cost. Gains or losses arising from impairment, reclassification or derecognition is recognized in profit or loss.
The Group adopts the effective interest rate method to recognize interest income for financial assets at amortized cost. Interest income is calculated by the carrying amount of financial assets multiplied by effective interest rate, with the following exception:
- A purchased or originated credit-impaired (“POCI”) financial asset, whose interest income is calculated since initial recognition by applying the credit-adjusted effective interest rate to its amortized cost.
### Financial assets at FVTOCI
Except for impairment losses or gains of financial assets classified as measured at FVTOCI, and interest income and exchange gains or losses calculated at effective interest rate recognized in profit or loss, the changes in fair value of the financial asset are recognized in the other comprehensive income. When the financial assets are derecognized, the accumulated gains or losses previously included in other comprehensive income shall be transferred from other comprehensive income and included in profit or loss.
After designating equity instrument investments not held for trading as financial assets at FVTOCI, changes in fair value of such financial assets are recognized in other comprehensive income. Upon derecognition, accumulated gains or losses previously recognized in other comprehensive income shall be transferred and included in retained earnings. In the duration of holding such equity instrument investments not held for trading, when the Group’s right to receive dividends is established, economic benefits related to dividends are likely to flow into the Group, and the amount of dividends may be reliably measured, dividend income shall be calculated and recognized in profit or loss.
### Financial assets at FVTPL
Financial assets at FVTPL shall be subsequently measured at fair value. Relevant gains or loss as well as dividends and interest income related to such financial assets shall be recognized in profit or loss.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Impairment of financial instruments
For financial assets measured at amortized cost, financial assets classified as measured at FVTOCI and contract assets, impairment shall be accounted for on the basis of expected credit loss and loss impairment shall be recognized.
The Group makes a loss allowance against amount of expected credit losses equal to the whole life of the contract assets or accounts receivable that exclude significant financing component or do not consider the financing component in the contract within one year arising from transactions adopting the New Standards for Revenue.
As for other financial instruments, other than purchased or POCI financial assets, the Group assesses the changes in credit risk of such financial instruments since the initial recognition at each balance sheet date. If the credit risk of such financial instrument has significantly increased since initial recognition, the Group shall make loss allowance equivalent to the amount of expected credit loss during its whole life; if the credit risk of such financial instrument has not significantly increased since initial recognition, the Group shall make loss allowance equivalent to the amount of expected credit loss for the next 12 months. Apart from financial assets classified as measured at FVTOCI, increase or reversal of credit loss allowance are recognized in profit or loss as impairment losses or gains. The Group recognizes the credit loss allowance of financial assets classified as measured at FVTOCI, while allowance losses or gains are recognized in profit or loss, without deducting its carrying amount stated in the balance sheet.
The Group has made a loss allowance against amount of expected credit losses equal to the whole life in the prior accounting period. However, at the balance sheet date, the credit risk on a financial instrument has not increased significantly since initial recognition; the Group will measure the loss allowance for that financial instrument at an amount equal to 12-month expected credit losses. Reversed amount of loss allowance arising from such circumstances shall be included in profit or loss as impairment gains.
### Significant increase of credit risk
The Group will make use of reasonable and supportable forward-looking information that is available to determine whether credit risk has increased significantly since initial recognition through comparing the risk of a default occurring on the financial instrument on the balance sheet date with the risk of a default occurring on the financial instrument as at the date of initial recognition.
The Group will take the following factors into consideration when assessing whether credit risk has increased significantly:
- Debtor’s failure to make payments of principal and interest on their contractually due dates;
- An actual or expected significant deterioration in a financial instrument’s external or internal credit rating (if available);
- An actual or expected significant deterioration in the operating results of the debtor; and
- Existing or forecast changes in the technological, market, economic or legal environment that have a significant adverse effect on the debtor’s ability to meet its obligation to the Group.
Regardless if the above assessment indicates any significant changes in credit risk, if contractual payment of a financial instrument is over due by 30 days (inclusive), it is considered that the credit risk of such instrument has significantly increased.
---
## Credit-impaired financial assets
When the Group expected occurrence of one or more events which may cause adverse impact on future cash flows of a financial asset, the financial asset will become a credit-impaired financial asset. Objective evidence that a financial asset is impaired includes the following observable events:
1. Significant financial difficulty of the issuer or obligor;
2. A breach of contract by the borrower, such as a default or delinquency in interest or principal payments;
3. The creditor, for economic or legal reasons relating to the borrower’s financial difficulty, granting a concession to the borrower, which would not be made under any other circumstances;
4. It becoming probable that the borrower will enter bankruptcy or other financial reorganizations;
5. The disappearance of an active market for that financial asset because of financial difficulties of the issuer or the borrower;
6. Purchase or originate a financial asset with a large scale of discount, which reflects facts of credit loss incurred.
Based on its internal credit risk management, the Group considers that a default event has occurred when internal advice or externally obtained information indicates that financial instrument debtor is unable to fully repay the creditors including the Group, without consideration of any guarantees obtained by the Group. Regardless of the results of the above assessment, the Group considers that a default event related to the financial instrument has occurred when contractual payment for such instrument is overdue by 90 days (inclusive).
## Determination of expected credit loss
The Group uses a provision matrix to determine the expected credit losses for relevant financial instruments based on a collective basis of bills receivable, accounts receivable and contract assets arising from daily operating activities such as sale of goods and provision of services. The Group classifies financial instruments into different groups based on common risk characteristics. The common risk characteristics adopted by the Group include: types of financial instrument, credit risk ratings, remaining contract terms and industry in which the debtor operates, etc.
For financial assets, a credit loss is the present value of the difference between the contractual cash flows that are due to the Group under the contract and the cash flows that the Group expects to receive.
The factors reflected in methods of measurement of expected credit losses of financial instruments include an unbiased and probability-weighted amount that is determined by evaluating a range of possible outcomes; time value of money; reasonable and supportable information about past events, current conditions and forecasts on future economic status at balance sheet date without unnecessary additional costs or efforts.
## Write-down of financial assets
When the Group will no longer reasonably expect that the contractual cash flows of financial assets can be collected in aggregate or in part, the Group will directly write down the carrying amount of the financial asset. Such write-down constitutes derecognition of relevant financial assets.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (3) Transfer of financial assets
The Group derecognizes a financial asset if one of the following conditions is satisfied: (1) the contractual rights to the cash flows from the financial asset expire; or (2) the financial asset has been transferred and substantially all the risks and rewards of ownership of the financial asset is transferred to the transferee; or (3) although the financial asset has been transferred, the Group neither transfers nor retains substantially all the risks and rewards of ownership of the financial asset but has not retained control of the financial asset.
If the Group neither transfers nor retains substantially all the risks and rewards of ownership of a financial asset, and it retains control of the financial asset, it recognizes the financial asset to the extent of its continuing involvement in the transferred financial asset and recognizes an associated liability. The Group measures relevant liabilities as follows:
- For the transferred financial asset measured at amortized cost, the carrying amount of relevant liabilities equals to carrying amount of the continuously-involved transferred financial asset less amortized cost of rights retained by the Group (if the Group retains relevant right due to transfer of financial assets) plus amortized costs of the obligation assumed by the Group (if the Group assumes relevant obligation due to transfer of financial assets), relevant liabilities shall not be designated as financial liabilities at FVTPL.
- For the transferred financial asset measured at fair value, the carrying amount of relevant liabilities equals to carrying amount of the continuously-involved transferred financial asset less fair value of rights retained by the Group (if the Group retains relevant right due to transfer of financial assets) plus fair value of the obligation assumed by the Group (if the Group assumes relevant obligation due to transfer of financial assets), the fair value of the right and obligation is fair value measured on stand-alone basis.
For a transfer of a financial asset in its entirety that satisfies the derecognition criteria, the difference between the carrying amount of the financial asset transferred on the date of derecognition and the derecognition-related part of the sum of the consideration received from the transfer and any cumulative gain or loss that has been recognized in other comprehensive income, is recognized in profit or loss. If the financial assets transferred by the Group are equity instrument not held for trading designated as financial assets at FVTOCI, cumulative gain or loss that has been recognized in other comprehensive income should be transferred from other comprehensive income to retained earnings.
If a part of the transferred financial asset qualifies for derecognition, the carrying amount of the transferred financial asset is allocated between the part derecognized and the part that continues to be recognized, based on the respective fair values of those parts on transfer date. The difference between the sum of the consideration received for the part derecognized and any cumulative gain or loss allocated to the part derecognized which has been previously recognized in other comprehensive income and the carrying amount allocated to the part derecognized on derecognition date; and is recognized in profit or loss. If the financial assets transferred by the Group are designated as equity instrument investment not held for trading at FVTOCI, cumulative gains or losses previously recognized in other comprehensive income are transferred to retained earnings.
For a transfer of a financial asset in its entirety that does not satisfy the derecognition criteria, the Group will continuously recognize the transferred financial asset in its entirety. Considerations received due to transfer of assets shall be recognized as a liability upon receipts.
---
# (4) Classification of financial liabilities and equity instruments
Financial instruments or its constituent parts issued by the Group are classified into financial liabilities or equity instruments on the basis of the contractual arrangements and the economic substance not only its legal form, together with the definition of financial liability and equity instruments.
## (a) Classification, recognition and measurement of financial liabilities
On initial recognition, financial liabilities are classified into financial liabilities at FVTPL and other financial liabilities.
- **Financial liabilities at FVTPL**
Financial liabilities at FVTPL consist of financial liabilities held for trading (including derivatives included in financial liabilities) and those designated as at FVTPL. Other than derivative financial liabilities to be set out separately, financial liabilities at FVTPL are stated as financial liabilities held for trading.
If a financial liability meets one of the following conditions, it is considered that such liability is held by the Group for trading:
- The financial liability was acquired principally for the purpose of repurchasing in near future.
- The financial liability is part of a portfolio of identifiable financial instruments upon initial recognition, and there is objective evidence that a recent actual pattern of short-term profit-making exists.
- The financial liability is a derivative instrument, except for derivatives meeting the definition of financial guarantee contract, or designated as an effective hedging instrument.
A financial liability may be designated as measured at FVTPL upon initial recognition when one of the following conditions is satisfied: (1) such designation can eliminate or significantly reduce accounting mismatches; (2) conduct management and performance evaluation on groups of financial liabilities or groups of financial assets and financial liabilities on a fair value basis, in accordance with the Group’s formally documented risk management or investment strategy, and report to key management personnel on that basis; or (3) qualified mixed financial instrument with embedded derivatives.
Financial liabilities held for trading are subsequently measured at fair value. Any gains or losses arising from changes in the fair value and any dividend or interest expenses paid on the financial liabilities are recognized in profit or loss.
For financial liabilities designated as measured at FVTPL, changes in fair value arising from the Group’s own changes in credit risks are recognized in other comprehensive income, while other fair value changes are recognized in profit or loss. Upon derecognition, the cumulative changing amount of fair value arising from the Group’s own changes in credit risks shall be transferred to retained earnings. Any dividend or interest expenses paid on the financial liabilities are recognized in profit or loss. If make treatment on effect of the changes in own credit risks by the aforesaid means which may cause or enlarge an accounting mismatch in profit or loss, the Group will recognize all gains or losses (including the affected amount arising from changes in the own credit risk) of the financial liability into profit or loss.
- **Other financial liabilities**
Other financial liabilities, except for financial liabilities arising from transfer of financial assets does not satisfy derecognition criteria or continue involvement of transferred financial assets, are subsequently measured at amortized cost, with gain or loss arising from derecognition or amortization recognized in profit or loss.
In the event that the Group and its counterparty modify or renegotiate the contract does not result in derecognition of a financial liability subsequently measured at amortized cost but result in changes in contractual cash flows, the Group will recalculate the carrying amount of the financial liability, with relevant gain or loss recognized in profit or loss. The Group will determine carrying amount of the financial liability based on the present value of renegotiated or modified contractual cash flows discounted at the financial liability’s original effective interest rate. For all costs or expenses arising from modification or renegotiation of the contract, the Group will adjust the modified carrying amount of the financial liability and make amortization during the remaining term of the modified financial liability.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
### (b) Derecognition of financial liabilities
The Group derecognizes a financial liability (or part of it) only when the underlying present obligation (or part of it) is discharged. An agreement between the Group (an existing borrower) and an existing lender to replace the original financial liability with a new financial liability with substantially different terms is accounted for as an extinguishment of the original financial liability and the recognition of a new financial liability.
When the Group derecognizes a financial liability or a part of it, it recognizes the difference between the carrying amount of the financial liability (or part of the financial liability) derecognized and the consideration paid (including any non-cash assets transferred or new financial liabilities assumed) in profit or loss.
### (c) Equity instruments
An equity instrument is any contract that evidences a residual interest in the assets of the Group after deducting all of its liabilities. Equity instruments issued (including refinanced), repurchased, sold and cancelled by the Group are recognized as changes of equity. Change of fair value of equity instruments is not recognized by the Group. Transaction costs related to equity transactions are deducted from equity.
The Group recognizes the distribution to holders of the equity instruments as distribution of profits, and dividends paid do not affect total amount of shareholders’ equity.
## (5) Convertible instruments
- **Convertible instruments containing an equity component**
Convertible instruments issued by the Group that can be converted to equity shares of the Group, where a fixed number of equity instruments is issued in exchange for a fixed amount of consideration at the time of conversion, are accounted for as compound financial instruments containing both liability and equity components.
The initial carrying amount of a compound financial instrument is allocated to its equity and liability components. The Group first determines the fair value of the liability component which includes the fair value of any embedded derivatives other than the equity component. The amount allocated to the equity component is the residual amount after deducting the fair value of the liability component from the fair value of the entire compound instrument. Transaction costs that relate to the issuance of a compound financial instrument are allocated to the liability and equity components of the instrument in proportion to the allocation of proceeds.
Subsequent to initial recognition, the liability component is measured at amortized cost using the effective interest method, unless it is designated upon recognition as measured at FVTPL. The equity component is not re-measured.
When convertible instruments are converted, the Group transfers the liability component and equity component to equity related items. When the convertible instrument is redeemed, the price paid for redemption and the transaction costs incurred are allocated to the equity and liability components. The method of allocating the price and transaction costs is consistent with the allocation method adopted when the instrument is issued. After the price and transaction costs are allocated, the difference between the carrying value and the equity and liability components shall be included in equity if it is related to the equity component, and in profit and loss if it is related to the liability component.
## (6) Derivatives
Derivative financial instruments include foreign currency forward contracts, currency swap contracts, interest rate swap contracts, etc. Derivatives are initially measured at fair value on the date of signing of such contracts, and subsequently measured at fair value.
## (7) Offsetting financial assets and financial liabilities
Where the Group has a legal right that is currently enforceable to set off the recognized financial assets and financial liabilities, and intends either to settle on a net basis, or to realize the financial asset and settle the financial liability simultaneously, a financial asset and a financial liability shall be offset and the net amount is presented in the balance sheet. Except for the above circumstances, financial assets and financial liabilities shall be presented separately in the balance sheet and shall not be offset.
---
# 12. Receivables
## (1) Categories and determination basis of receivables for which bad debt provision is individually assessed:
**Reason for individual provision for bad debts:** If there exists objective evidence that the credit risk characteristics of a certain counterparty are significantly different from other counterparties in the portfolio, or the credit risk characteristics of the counterparty have changed significantly, bad debt provision will be individually assessed for such receivable.
**Method for bad debt provision:** To be impaired individually, and the difference between the present value of the estimated future cash flows and its carrying amount is used for bad debt provision.
## (2) Categories and determination basis of receivables for which bad debt provision is collectively assessed on a portfolio basis by credit risk characteristics:
Other than receivables for which bad debt provision is individually assessed, receivables are grouped based on portfolio with similar credit risk characteristics. The basis for determination and method of determining provision for bad debt of each portfolio are as follows:
| Name of portfolio | Basis of determining the portfolio | Method for measuring expected credit losses |
| :--- | :--- | :--- |
| Portfolio 1 | Amount from debtors simultaneously having a long-term cooperation history, no history of bad debt and sound state of operation | With reference to historical credit loss experience, combined with current conditions and predictions of future economic conditions, expected credit losses are calculated through default risk exposure and the expected credit loss rate for the whole life. |
| Portfolio 2 | Receivables other than Portfolio 1 | With reference to historical credit loss experience, combined with current conditions and predictions of future economic conditions, expected credit losses are calculated through default risk exposure and the expected credit loss rate for the whole life. |
Bad debt provision of above portfolios is made using expected credit loss model:
| Aging | Portfolio 1 | Portfolio 2 |
| :--- | :--- | :--- |
| Within 1 year | 0.30% | 0.30% |
| 1 to 2 years | 5.00% | 10.00% |
| 2 to 3 years | 20.00% | 30.00% |
| 3 to 4 years | 30.00% | 50.00% |
| 4 to 5 years | 50.00% | 80.00% |
| More than 5 years | 100.00% | 100.00% |
# 13. Inventories
## (1) Classification of inventories
The Group’s inventories mainly include raw materials, nuclear fuel, spare parts, products in stock, consigned processing materials and reusable materials. Inventories are initially measured at cost. Inventory costs include procurement costs, processing costs and other expenses incurred to enable the inventories to reach the present site and working condition.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Valuation method of inventories upon delivery
Upon delivery of inventories, actual cost of nuclear fuel is calculated using the specific identification method based on the number of refuelling batches, and included in the production cost by installments at the current and the next refuelling period based on the on-grid power generation. Actual costs of other inventories are calculated using the weighted average method or specific identification method, and are included in the production cost when they are actually consumed.
Reusable materials are materials that can be used repeatedly and still be remained in original condition after gradual transfer of their value but are not recognized as fixed assets, including packaging materials, low-value and short-lived consumables and other turnover materials. Packaging materials, low-value and short-lived consumables and other turnover materials are amortized when they are used.
## (3) Recognition of net realizable value of inventories and provision for inventory impairment
At the balance sheet date, inventories are calculated at the lower of cost and net realizable value. Provision for inventory impairment is made when the net realizable value is lower than the cost. Net realizable value represents the estimated selling price of inventories minus cost estimated to incur upon completion, estimated selling costs and relevant taxes during normal course of business. The net realizable value of inventory is determined based on the actual evidences obtained while the objectives of inventories holding and the impact of post balance sheet date event are also considered.
Provision for decline in value of inventories is made based on the excess of cost of inventory over its net realizable value on an item-by-item basis.
After the provision for decline in value of inventories is made, if the circumstances that previously caused inventories to be written down below cost no longer exist so that the net realizable value of inventories is higher than their cost, the original provision for decline in value is reversed and the reversal is included in profit or loss for the period.
## (4) Inventory count system
The inventory count system shall be on a perpetual basis.
## 14. Held-for-sale assets
When the Group recovers the book value of a non-current asset or disposal group mainly by selling (including the exchange of non-monetary assets with commercial substance) rather than using such non-current asset or disposal group on a continuous basis, the non-current asset or disposal group is classified as held-for-sale.
Non-current assets or disposal groups classified as held-for-sale shall satisfy the following conditions:
1. according to the practice of selling such assets or disposal groups in similar transactions, they can be sold immediately in the current condition;
2. the sale is highly likely, that is, the Group has made a decision on a sale plan and entered into a legally binding purchase commitment with other parties, and the sale is expected to be completed within one year.
Where the Group has lost control of a subsidiary due to reasons such as disposal of investment in a subsidiary regardless of the Group retaining part of equity investment after the disposal, upon the investment in subsidiary intended to be disposed of satisfying the conditions for classification as held-for-sale, the investment in subsidiary will be generally classified as held-for-sale in the parent’s separate financial statements, and all assets and liabilities of the subsidiary is classified as held-for-sale in the consolidated financial statements.
The Group measures held-for-sale non-current assets or disposal groups at the lower of the net amount of the book value and fair value minus the cost of sale. If the book value is higher than the fair value minus the selling expenses, the book value shall be written down to the net amount after the fair value minus the selling expenses. The amount written down shall be recognized as asset impairment loss, and shall be included in the current profit or loss, and the provision for impairment of held-for-sale shall be made. In case of the net increase in the fair value of the held-for-sale non-current assets minus the selling expenses on subsequent statement of balance sheet date, the amount previously written down shall be recovered, and the amount of asset impairment loss recognized after being classified as held-for-sale shall be reversed, and the amount reversed shall be included in the current profit or loss.
Held-for-sale non-current assets or those in the disposal group are not depreciated or amortized, and the interest and other expenses on liabilities in the held-for-sale disposal group continue to be recognized.
The equity investment in associates or joint ventures is classified as held-for-sale assets in whole or in part, and the portion classified as held-for-sale shall be no longer measured under the equity method from the date of being classified as held-for-sale.
---
# 15. Long-term equity investments
## (1) Judgment criteria of determining joint control or significant influence over the investee
Control exists when the investor has power over the investee; is exposed, or has rights, to variable returns from its involvement with the investee; and has the ability to use its power over the investee to affect its returns. Joint control is the contractually agreed sharing of control of an arrangement, which exists only when decisions about the relevant activities require unanimous consent of the parties sharing control. Significant influence is the power to participate in the financial and operating policy decisions of an enterprise, except to control or jointly control the formulation of such policies together with other parties. In determining whether there is control or significant influence over the investee, potential voting right factors (such as the convertible corporate bonds for the period and the exercisable stock warrants for the period of the investee and other invested units held) were taken into account.
## (2) Determination of initial investment cost
For a long-term equity investment acquired through a business combination involving enterprises under common control, the initial investment cost of the long-term equity investment is the attributable share of the carrying amount of the shareholders’ equity of the acquiree at the date of combination in the consolidated financial statements of the ultimate controlling party. The difference between the initial investment cost and the carrying amount of cash paid, non-cash assets transferred and liabilities assumed is adjusted to share premium in capital reserve. If the balance of share premium is not sufficient, any excess shall be offset with surplus reserve and retained earnings in sequence.
If the consideration of the combination is satisfied by the issue of equity securities, the initial investment cost of the long-term equity investment is the attributable share of the carrying amount of the shareholders’ equity of the acquiree in the consolidated financial statements of the ultimate controlling party. The aggregate face value of the shares issued is accounted for as share capital. The difference between the initial investment cost and the aggregate face value of the shares issued is adjusted to share premium in capital reserve. If the balance of share premium is not sufficient, any excess shall be offset with surplus reserve and retained earnings in sequence.
For a long-term equity investment acquired through business combination not involving enterprises under common control, the initial investment cost of the long-term equity investment is the cost of acquisition at the date of combination. For a business combination realized by more than one transaction and ultimately not under common control, different accounting methods are adopted by the criteria of whether those transactions are classified as “a bundle of transactions” or not. If yes, all transactions are deemed as one transaction getting control of the acquirer and are dealt with the relevant accounting method. If no, the Company regards the sum of carrying value of the equity investment of the acquirer plus added cost of investment as the initial cost of investment. For such carrying value of the equity investment, if it is accounted by equity method, then the relevant other comprehensive income is not accounted for the period.
The intermediary fees incurred by the absorbing party or acquirer such as audit, legal, valuation and consulting fees, etc. and other related administrative expenses attributable to the business combination are recognized in profit or loss when they are incurred.
The long-term equity investment acquired otherwise than through a business combination is initially measured at cost. When the entity is able to exercise significant influence or joint control (but not control) over an investee due to additional investment, the cost of long-term equity investments is the sum of the fair value of previously-held equity investments determined in accordance with the Accounting Standards for Business Enterprises No. 22 – Recognition and Measurement of Financial Instruments, and the additional investment cost.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (3) Method for subsequent measurement and profit or loss recognition
- **Long-term equity investments accounted for using the cost method**
Long-term equity investments in subsidiaries are accounted for using the cost method in the financial statements of the parent company. A subsidiary is an investee that is controlled by the Group.
Under the cost method, a long-term equity investment is measured at initial investment cost. When additional investment is made or the investment is recouped, the cost of the long-term equity investment is adjusted accordingly. Investment income is recognized in the period in accordance with the attributable share of cash dividends or profit distributions declared by the investee.
- **Long-term equity investments accounted for using the equity method**
Except for all or part of the investment in associates and joint ventures classified as assets held for sale, the Group accounts for investment in associates and joint ventures using the equity method. An associate is an entity over which the Group has significant influence; a joint venture is a joint arrangement whereby the Group has rights to the net assets of the arrangement.
Under the equity method, where the initial investment cost of a long-term equity investment exceeds the Group’s share of the fair value of the investee’s identifiable net assets at the time of acquisition, no adjustment is made to the initial investment cost. Where the initial investment cost is less than the Group’s share of the fair value of the investee’s identifiable net assets at the time of acquisition, the difference is recognized in profit or loss for the period, and the cost of the long-term equity investment is adjusted accordingly.
Under the equity method, the Group recognizes its share of the net profit or loss and other comprehensive income made by the investee as investment income and other comprehensive income respectively, and adjust the carrying amount of the long-term equity investment accordingly; the carrying amount of the investment is reduced by the portion of any profit distributions or cash dividends declared by the investee that is distributed to the Group; the share of the changes in owners’ equity of the investee other than those arising from net profit or loss, other comprehensive income and profit distribution are recognized in the capital reserve and the carrying amount of the long-term equity investment is adjusted accordingly. The Group recognizes its share of the investee’s net profit or loss after making appropriate adjustments based on the fair value of the investee’s individual separately identifiable assets, etc. at the acquisition date. Where the accounting policies and accounting period adopted by the investee are not consistent with those of the Group, the Group shall adjust the financial statements of the investee to conform to its own accounting policies and accounting period, and recognize investment income and other comprehensive income based on the adjusted financial statements.
For the Group’s transactions with its associates and joint ventures where assets contributed or sold does not constitute a business, unrealized intra-group profits or losses are recognized as investment income or loss to the extent that those attributable to the Group’s proportionate share of interest are eliminated. However, unrealized losses resulting from the Group’s transactions with its associates
If the assets transfer made by the Group is classified as a business transaction, fair value of the asset transferred are recognized as initial cost of the additional long-term equity investment, and the difference between initial cost of investment and carrying value of asset transferred are taken in full amount into the current profit or loss, if the investor obtained long-term equity investment but not control over the investee. If the disposal of assets made by the Group is classified as a business transaction, the difference between consideration of assets sold and carrying value of the asset are taken in full amount into the current profit or loss. If assets purchased from associates and joint ventures are classified as business transactions, then full amount of profit or loss relating to the transaction are recognized, according to the requirements under the Accounting Standards for Business Enterprise No. 20 – Business Combination.
---
The Group discontinues recognizing its share of net losses of the investee after the carrying amount of the long-term equity investment and any long-term interest that in substance forms part of the Group’s net investment in the investee is reduced to zero, except to the extent that the Group has an obligation to assume additional losses, in which case, the expected liability shall be recognized at the obligation to be assumed and be included in investment loss incurred during the current periods. Where net profits are subsequently made by the investee, the Group resumes recognizing its share of those profits only after its share of the profits equals the share of losses not recognized.
# (4) Disposal of long-term equity investments
**On disposal of a long-term equity investment, the difference between the proceeds actually received and the carrying amount is recognized in profit or loss for the period.** For long-term equity investments accounted for using the equity method, if the remaining interest after disposal is still accounted for using the equity method, other comprehensive income previously recognized for using the equity method is accounted for on the same basis as would have been required if the investee had directly disposed of related assets or liabilities, and transferred to profit or loss for the period on a pro rata basis; owners’ equity recognized due to changes in other owners’ equity of the investee (other than net profit or loss, other comprehensive income and profit distribution) is transferred to profit or loss for the period on a pro rata basis. For long-term equity investments accounted for using the cost method, if the remaining interest after disposal is still accounted for using the cost method, other comprehensive income previously recognized for using the equity method or in accordance with the standards for the recognition and measurement of financial instruments before obtaining the control over the investee, is accounted for on the same basis as would have been required if the investee had directly disposed of related assets or liabilities, and transferred to profit or loss for the period on a pro rata basis; changes in other owners’ equity in the investee’s net assets recognized under the equity method (other than net profit or loss, other comprehensive income and profit distribution) is transferred to profit or loss for the period on a pro rata basis.
For the remaining share equity after partial disposal which causes the Group to lose full control over the investee, equity method will be used to account and adjust for the remaining share equity as if they are accounted by the same method upon acquisition, if such equity enables the Group to exercise joint control or significant influences over the investee. If not, the difference between the fair value upon the date of losing control and the carrying value will be taken into the current profit or loss, according to the regulations of financial instrument recognition and measurement. For the other comprehensive income recognized by equity method or by financial instruments recognition and measurement before the Group takes control of the investee, the same basis the investee while disposing relative asset or liability will be adopted for accounting when the Group loses control over the investee, changes to shareholders’ equity in the net asset of investee recognized by equity method, other than net profit or loss, other comprehensive income and profit distribution will be carried forward to the current profit or loss. Meanwhile, other comprehensive income and other shareholders’ equity will be carried proportionately if the remaining share equity is accounted by equity method; and will be carried in full amount if the remaining share equity is accounted by financial instrument recognition and measurement.
The remaining share equity after partial disposal that causes the Group to lose joint control or significant influences over the investee are accounted by the Accounting Standards for Business Enterprises No. 22 – Recognition and Measurement of Financial Instruments, difference between the fair value of such equity upon the date of losing control or significant influence and the carrying value will be taken into the current profit or loss. Other comprehensive income recognized using equity method for the previous share equity investment will be accounted using the same basis as the investee while disposing relative asset or liability, full amount of shareholders’ equity recognized by other change to shareholders’ equity other than net profit or loss, other comprehensive income or profit distribution will be taken into return on investment for the period when equity method stops being adopted.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 16. Investment properties
Investment property refers to real estate held to earn rentals or for capital appreciation, or both, including leased land use rights, land use rights held and provided for transferring after appreciation and leased buildings, etc.
Investment property is initially measured at cost. Subsequent expenditures related to an investment property shall be included in cost of investment property only when the economic benefits associated with the asset will likely flow to the Group and its cost can be measured reliably. All other subsequent expenditures shall be included in profit or loss for the current period when incurred.
The Group adopts cost method for subsequent measurement of investment property, which is depreciated or amortized using the same policy as that for buildings and land use rights. An investment property is depreciated over its useful life using the straight-line method since the month subsequent to the one in which it is ready for intended use. The useful life, estimated net residual value rate and annual depreciation rate of investment property are as follows:
| Category | Useful life | Estimated net residual value rate | Annual depreciation rate |
| :--- | :--- | :--- | :--- |
| Buildings and structures | 20 – 50 years | 5% | 1.90% – 4.75% |
When an investment property is sold, transferred, retired or damaged, the amount of proceeds on disposal of the property net of the carrying amount and related taxes is recognized in profit or loss for the current period.
## 17. Fixed assets
### (1) Conditions for recognition of fixed assets
**Fixed assets** are tangible assets that are held for use in the production or supply of goods or services, for rental to others, or for administrative purposes and have a useful life of more than one accounting period. Fixed assets are only recognized when their related economic benefits are likely to flow to the Group and their cost can be reliably measured. Fixed assets are initially measured at cost and the effect of any expected costs of abandoning the asset at the end of its use is considered.
A fixed asset that is ready for its intended use but before the final account for completed project is stated at cost and depreciated based on estimated value, which will be adjusted based on actual cost upon the final account for completed project without adjustment to the depreciation already made.
NPP decommissioning cost is recognized in the initial cost of fixed assets based on the discounted amount of the expected decommissioning expense. Two-third of the initial nuclear fuelling costs as necessary expenses before the NPP is ready for its intended use are recognized in the construction cost of the NPP, and its depreciation is provided under the same method as the NPP. The remaining initial nuclear fuelling costs are recognized in the inventory, and are included in the production cost by installments at the period between the initial fuelling and the next refuelling based on the on-grid power generation.
Subsequent expenditures incurred for the fixed asset are included in the cost of the fixed asset if it is probable that economic benefits associated with the asset will flow to the Group and the subsequent expenditures can be measured reliably. Meanwhile, the carrying amount of the replaced part is derecognized. Other subsequent expenditures are recognized in profit or loss in the period in which they are incurred.
---
# (2) Method for depreciation of different fixed assets
Fixed assets of the Group include nuclear power facilities and non-nuclear power facilities.
## Method for depreciation of nuclear power facilities
Method for classification and depreciation, estimated useful life and estimated net residual value of nuclear power facilities are as follows:
Except for the decommissioning costs of nuclear power facilities that are separately accounted for, other nuclear power facilities are classified into two categories: (I) the nuclear islands, conventional islands and auxiliary systems, and (II) machinery, electricity, instruments, buildings and structures. Nuclear power facilities are depreciated using the units of production method, except for the buildings and structures that are depreciated using the straight-line method, since the month subsequent to the one in which it is ready for intended use. The net residual value rate of machineries of conventional islands and auxiliary system is 5%, and the net residual value rate of other fixed-assets categorized as nuclear power facilities is zero.
The estimated useful lives of the nuclear power facilities of the Group are as follows:
| Category | Nuclear islands | Conventional islands | Auxiliary systems |
| :--- | :--- | :--- | :--- |
| Machinery | 30 – 60 years | 20 – 30 years | 20 – 30 years |
| Electricity | 15 – 20 years | 15 – 20 years | 15 – 20 years |
| Instruments | 10 – 15 years | 10 – 15 years | 10 – 15 years |
| Buildings | 40/60 years | 30 years | 30 years |
| Structures | 25 – 60 years | 25 years | 25 years |
| Decommissioning costs of nuclear power facilities | 40/60 years | N/A | N/A |
**Calculations of depreciation by the units of production method are as follows:**
Current depreciation rate = current actual on-grid power generation ÷ (current actual on-grid power generation + estimated on-grid power generation during remaining useful life)
Current depreciation amount = [cost of fixed assets as at the end of the period x (1 – estimated net residual value rate) – depreciated amount as at the beginning of the period – provision of fixed assets impairment] x current depreciation rate
## Method for depreciation of non-nuclear power facilities
Non-nuclear power facilities are depreciated over its useful life using the straight-line method since the month subsequent to the one in which it is ready for intended use. The useful life, estimated net residual value rate and annual depreciation rate of fixed assets of non-nuclear power facilities are as follows:
| Category | Useful life | Estimated net residual value rate | Annual depreciation rate |
| :--- | :--- | :--- | :--- |
| Building and structure for administration purpose | 20 – 50 years | 5% | 1.90% – 4.75% |
| Machinery and equipment | 5 – 15 years | 5% | 6.33% – 19.00% |
| Transportation vehicles | 5 years | 5% | 19.00% |
| Electronic equipment and office facilities | 5 years | 5% | 19.00% |
| Vessels | 25 years | 5% | 3.80% |
Estimated net residual value of a fixed asset is the estimated amount that the Group would currently obtain from disposal of the asset, after deducting the estimated costs of disposal, if the asset was already of the stage and in the condition expected at the end of its useful life.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (3) Other explanations
If a fixed asset is upon disposal or no future economic benefits are expected to be generated from its use or disposal, the fixed asset is derecognized. When a fixed asset is sold, transferred, retired or damaged, the amount of any proceeds on disposal of the asset net of the carrying amount and related taxes is recognized in profit or loss for the current period.
The Group reviews the useful life and estimated net residual value of a fixed asset and the depreciation method applied at least once at each financial year-end, and account for any change as a change in an accounting estimate.
# 18. Construction in progress
Construction in progress is measured based on the actual cost, including all expenditures incurred for construction projects, capitalized borrowing costs for the construction in progress before it is ready for its intended use, and other related expenses during the construction period. A construction in progress is not depreciated and is transferred to fixed assets when it is ready for its intended use.
The standards and points of time for transferring various types of construction in progress into fixed assets are as follows:
| Category | Standards and point of time for transferring into fixed assets |
| :--- | :--- |
| Buildings and structures | Meet the acceptance standards for construction and installation |
| Machinery and equipment | Meet the design requirements or standards specified in the contract after installation and commissioning |
When a company sells products or by-products produced before fixed assets reaching their intended use, the related revenues and costs shall be accounted for separately and included in the profit or loss for the period in accordance with the Accounting Standards for Business Enterprises No. 14 – Revenue, the Accounting Standards for Business Enterprises No. 1 – Inventories and other requirements.
# 19. Borrowing costs
Borrowing costs directly attributable to the acquisition, construction or production of qualifying asset are capitalized when expenditures for such asset and borrowing costs are incurred and activities relating to the acquisition, construction or production of the asset that are necessary to prepare the asset for its intended use or sale have commenced. Capitalization of borrowing costs ceases when the qualifying asset being acquired, constructed or produced becomes ready for its intended use or sale. If acquisition, construction or production of assets qualifying capitalization is interrupted abnormally for a continuous period of more than 3 months, the capitalization of borrowing costs should be ceased until the assets resume acquisition, construction or production. Other borrowing costs are recognized as an expense in the period in which they are incurred.
Where funds are borrowed under a specific-purpose borrowing, the amount of interest to be capitalized is the actual interest expense incurred on that borrowing for the period less any bank interest earned from depositing the borrowed funds before being used on the asset or any investment income on the temporary investment of those funds. Where funds are borrowed under general-purpose borrowings, the Group determines the amount of interest to be capitalized on such borrowings by applying a capitalization rate to the weighted average of the excess of cumulative expenditures on the asset over the amounts of specific-purpose borrowings. The capitalization rate is the weighted average of the interest rates applicable to the general-purpose borrowings. During the capitalization period, exchange differences related to a specific-purpose borrowing denominated in foreign currency are all capitalized. Exchange differences in connection with general-purpose borrowings are recognized in profit or loss in the period in which they are incurred.
---
# 20. Intangible assets
## (1) Intangible assets
An intangible asset is measured initially at cost. When an intangible asset with a finite useful life is available for use, its original cost less net residual value and any accumulated impairment losses is amortized over its estimated useful life using the straight-line method. An intangible asset with an indefinite useful life is not amortized. The years of useful life of intangible assets are as follows:
| Category | Useful life | Determination basis | Amortization method |
| :--- | :--- | :--- | :--- |
| Land use rights | 20 – 50 years | Term of legal right to use | Straight-line method |
| Computer software | 5 – 10 years | Expected term of economic benefits | Straight-line method |
| Patent rights | 4 – 20 years | Expected term of economic benefits | Straight-line method |
| Non-patented technology | 1.5 – 10 years | Expected term of economic benefits | Straight-line method |
| Sea area use rights | 50 years | Term of legal right to use | Straight-line method |
| Others | 5 – 37 years | Expected term of economic benefits | Straight-line method |
The estimated net residual values of intangible assets are zero. The Group shall review the finite useful life of an intangible asset and the amortization method applied at the end of the period and make adjustments when necessary.
## (2) Internal R&D expenditure
Expenditures on the Group's internal R&D projects include employees' remuneration of R&D personnel, commissioning fees paid for R&D outsourcing, cooperation and others, depreciation and amortization charges of R&D assets, inspection expenses, and other related expenses.
Expenditure arising from the research phase is accounted for in profit or loss for the current period when incurred. Expenses incurred during the development stage that satisfy the following conditions are recognized as intangible assets, while those that do not satisfy the following conditions are accounted for in the profit or loss for the current period:
1. it is technically feasible that the intangible asset can be used or sold upon completion;
2. there is intention to complete the intangible asset for use or sale;
3. the intangible asset can produce economic benefits, including there is evidence that the products produced using the intangible asset has a market or the intangible asset itself has a market; if the intangible asset is for internal use, there is evidence that there is usage for the intangible asset;
4. there is sufficient support in terms of technology, financial resources and other resources in order to complete the development of the intangible asset, and there is capability to use or sell the intangible asset;
5. the expenses attributable to the development stage of the intangible asset can be measured reliably.
Specific standards to identify the research stage and development stage of internal R&D projects of the Group: The research stage is explorative and to get data and relevant aspects ready for the further development activity. Whether the processed research activity will be converted into development in the future and whether the development will result in intangible assets, etc. are of great uncertainty. The development stage indicates the completion of the work at the research stage, and to the greatest extent, has the basic conditions to generate a new product or technology. If the expenses incurred during the research stage and the development stage cannot be distinguished separately, all R&D expenses incurred are accounted for in the profit or loss for the current period.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 21. Impairment of long-term assets
The Group assesses at each balance sheet date whether there is any indication that any long-term equity investments, investment properties, fixed assets, construction in progress, right-of-use assets and intangible assets with a finite useful life may be impaired. If there is any evidence indicating that an asset may be impaired, the recoverable amount shall be estimated for the individual asset. The intangible assets with infinite useful life and intangible assets that are not ready for intended use are tested for impairment yearly, regardless of any indication of impairment.
The recoverable amount should be estimated of the individual asset. If it is not possible to estimate the recoverable amount of the individual asset, the Group shall determine the recoverable amount of the asset group to which the asset belongs. The recoverable amount of an asset is determined at the higher of the net amount after deducting the disposal expenses from the assets’ fair value and the current value of the assets’ estimated future cash flow.
If the recoverable amount of an asset is less than its carrying amount, a provision for impairment loss of the asset will be made for the reduction and is charged to profit or loss for the current period.
Goodwill is tested for impairment yearly. When conducting the impairment test for goodwill, the test is conducted through combination with its related asset group or portfolio of asset group. That is, the carrying amount of goodwill is reasonably allocated to the related asset group or each of asset group expected to benefit from the synergies of the combination from the acquisition date. If the recoverable amount of asset group or portfolio of asset group containing the allocated goodwill is lower than its carrying value, relevant impairment loss is recognized. The amount of impairment loss is first written down and allocated to the carrying amount of the goodwill of that asset group or portfolio of asset group, and is then written down to the carrying value of all other types of assets proportionally according to the weighting of the carrying value of all other types of assets other than goodwill within asset group or portfolio of asset group.
When recognizing the impairment loss of contractual costs related assets, other assets in relation to contractual costs that are recognized pursuant to other relevant corporate accounting standards shall take priority. For contractual costs related assets, the Group shall make provisions and recognize an impairment loss to the extent that the carrying amount of an asset exceeds: (1) the remaining amount of consideration that the Group expects to receive in exchange for the goods or services to which the asset relates; (2) the estimated costs that relate to providing those goods or services.
Except for the impairment loss related to contractual costs, an impairment loss once recognized shall not be reversed in a subsequent period. The Group shall, after the impairment of contractual costs has been provided, recognized in profit or loss a reversal of the impairment loss previously recognized when the impairment conditions no longer exist or have improved. However, the increased carrying amount of the asset shall not exceed the carrying amount that would have been determined if no impairment loss had been recognized previously.
## 22. Long-term deferred expenses
Long-term deferred expenses are expenses which have incurred but shall be amortized over the current year and subsequent years of more than one year. Long-term deferred expenses are amortized evenly over the estimated benefit period.
---
# 23. Employee benefits
## (1) Accounting treatment of short-term employee benefits
In the accounting period in which employees have rendered services, the Group shall recognize the short-term employee benefits that actually occurred as liability, and charged to profit or loss for the current period or cost of relevant assets. The Group shall recognize the amount of employee welfare that actually occurred and charged to profit or loss for the current period or cost of relevant assets. If the employee welfare expense is non-monetary welfare, it shall be measured according to its fair value.
During the accounting periods which employees rendered service, the Group makes contribution to medical insurance, work-related injury insurance, maternity insurance and other social security contributions and housing provident fund, and extracts for labor union funds and employees' education expenses as stipulated. Based on the required accrual basis and proportions in order to determine the appropriate amount of employee benefits, such employee benefits shall be recognized as corresponding liabilities, and charged to profit or loss during current period or cost of relevant assets.
## (2) Accounting treatment of post-employment benefits
Post-employment benefits are classified into defined contribution plans and defined benefit plans.
For defined contribution plans, during the accounting periods which employees rendered service, the contribution payable to the plans shall be recognized as liability in profit or loss during current period or as relevant asset cost.
For defined benefit plans, the Group assigns the welfare obligation generated from the defined benefit plans to the period of rendering services using the formula determined by the projected unit credit method, and includes it in the current profit or loss or related asset costs. Employee benefit costs generated from the defined benefit plans are categorized as follows:
- Service cost (including current service cost, past service cost, as well as gains and losses on curtailments and settlements);
- Net interest of net liabilities or net assets of defined benefit plans (including interest income of planned assets, interest expenses of defined benefit plan liabilities and effect of asset ceiling); and
- Remeasurement of changes in net liabilities or net assets of defined benefit plans.
Service cost and net interest of net liabilities or net assets of defined benefit plans are included in the current profit or loss or related asset costs. Remeasurement of changes in net liabilities or net assets of defined benefit plans (including actuarial gains or losses, return on plan assets excluding the amount included in the net interest of net liabilities or net assets of defined benefit plans, and changes to the asset ceiling excluding the amount included in the net interest of net liabilities or net assets of defined benefit plans) is included in other comprehensive income.
Deficit or surplus generated from the present value of the obligation of defined benefit plan less the fair value of defined benefit plan asset is recognized as a net liability or a net asset of defined benefit plan.
## (3) Accounting treatment of termination benefits
When the Group provides termination benefits to employees, employee benefit liabilities are recognized for termination benefits, with a corresponding charge to the profit or loss for the period at the earlier of: when the Group cannot unilaterally withdraw the offer of termination benefits because of the termination plan or a curtailment proposal; or when the Group recognizes costs or expenses related to restructuring that involves the payment of termination benefits.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
### (4) Accounting treatment of other long-term benefits
For other long-term benefits, when meeting the determined conditions for withdrawal and deposit plan, the Group will conduct accounting treatment according to the determined withdrawal and deposit plan. For net liabilities and net assets of other long-term benefits apart from the above, the Group will conduct accounting treatment according to the determined benefit plan. As at the end of the reporting period, employee welfare cost of other long-term employee welfare are recognized as service cost, net interest of net liabilities or net assets of other long-term employee welfare and remeasurement of changes in net liabilities or assets of other long-term employee welfare, and the total amount of which is recognized in profit or loss or as relevant asset cost.
## 24. Provisions
Provisions are recognized when the Group has a present obligation related to a contingency, it is probable that an outflow of economic benefits will be required to settle the obligation, and the amount of the obligation can be measured reliably.
The amount recognized as a provision is the best estimate of the consideration required to settle the present obligation at the balance sheet date, taking into account factors pertaining to a contingency such as the risks, uncertainties and time value of money. Where the effect of the time value of money is material, the best estimate of provision is determined by discounting the related future cash outflows.
Where all or some of the expenditure required to settle a provision is expected to be reimbursed by a third party, the reimbursement is recognized as a separate asset only when it is virtually certain that reimbursement will be received, and the amount of reimbursement recognized does not exceed the carrying amount of the provision.
The Group's provisions primarily consist of provision for NPP decommissioning and provision for low and medium level radioactive waste management.
### (1) Provision for NPP decommissioning
Provision for NPP decommissioning is the expenses expected to be incurred in the process of the Group putting nuclear reactor systems out of service safely and permanently when they reach the end of their service lives, in order to ensure staff, the public and surrounding ecological environment being not subject to the hazards of the remaining radioactive substance and other potential risks. Provision for NPP decommissioning is estimated on the basis of best estimate, and the discounted amount shall be included in the initial cost of fixed assets.
### (2) Provision for low and medium level radioactive waste disposals
Provision for low and medium level radioactive waste management is the expenses expected to be incurred in respect of disposal of low and intermediate level radioactive waste from NPP. Provision for low and medium level radioactive waste management shall be made on the basis of best estimate by adopting the accrual-basis principle.
## 25. Specific reserve
The safe production expenses provided by the Group in accordance with national regulations are recognized in the cost of relevant products or profit or loss and included in specific reserve.
When the Group uses the specific reserve, if it is related to revenue expenditures, specific reserve is directly offset. Where fixed assets are formed with the safe production expenses provided, the expenses incurred under the "construction in progress" will be recognized as fixed assets when the safety projects are completed and reach the working condition for their intended use. Meanwhile, special reserves are written down based on costs of fixed asset formed, and accumulated depreciation of the same amount shall be recognized. No further provision for depreciation shall be made for such fixed assets in subsequent period.
---
# 26. Revenue recognition
The Group’s revenue sources mainly include the following businesses:
- sales of electricity;
- construction, installation and design services;
- provision of labor services;
- sales of goods and others.
When the Group has implemented the performance obligation in the contract, namely, when the customer acquires controls over relevant goods or services, revenues will be recognized as per transaction prices allocated to such performance obligation. Performance obligation represents the Group’s commitment to transfer distinct goods or services to the customer in the contract. The transaction price is the amount of consideration to which the Group expects to be entitled in exchange for transferring promised goods or services to a customer, excluding amounts collected on behalf of third parties and amounts expected to be refunded to a customer.
For performance obligations to be satisfied over time, the Group recognizes revenue over time by measuring the progress towards completion if one of the following criteria are met: (1) the customer simultaneously receives and consumes the benefits provided by the Group’s performance as the Group performs; (2) the Group’s performance creates or enhances an asset that the customer controls as the asset is created or enhanced; (3) the Group’s performance does not create an asset with an alternative use to the Group and the Group has an enforceable right to payment for performance completed to date. Otherwise, the Group recognizes revenue when the customer obtains control of the related goods or services.
For performance obligations to be satisfied at a certain point in time, the Group recognizes revenue at the time of acquiring control of such goods. In judging if the customer has acquired control of the goods, the Group takes into consideration: (1) the Group has a present right to payment for the goods, as in the customer has a present obligation to payment for the goods; (2) the Group has transferred the legal ownership of the goods to the customer, as in the customer has acquired the legal ownership of the goods; (3) the Group has transferred physical possession of the goods to the customer, as in the customer is in possession of the physical good; (4) the Group has transferred the major risks and rewards of the ownership of the goods to the customer, as in the customer has acquired the major risks and rewards of the ownership of the goods to the customer; (5) the customer has accepted the goods; and (6) other indications that the customer has acquired control of the goods.
For each performance obligation satisfied over time, the Group recognizes revenue over time by measuring the progress towards completion, except when progress cannot be reasonably determined. In determination of the progress towards completion in satisfying such obligations, the Group adopts the input method or output method based on the nature of business. In particular, output method is a way to determine the progress to satisfying the performance obligation based on the value of goods transferred to the customer, and input method is a way to determine the progress to satisfying the performance obligation based on the Group’s input. For similar performance obligations under similar circumstances, the Group uses the same method to determine the performance progress. When the performance progress cannot be determined, the Group is expected to be reimbursed for the costs already incurred and recognize the revenue based on the costs already incurred until the performance progress can be reasonably determined.
A contract asset is the Group’s right to consideration in exchange for goods or services that it has transferred to a customer when that right is conditional on something other than the passage of time. Accounts receivable is the Group’s right to consideration that is unconditional (only the passage of time is required).
For sales with quality assurance clause, if an individual service is rendered to the customer under such clause beyond providing the customer with goods or services meeting the established criteria, the quality assurance clause shall constitute a single performance obligation. Otherwise, accounting treatments shall be made according to the quality assurance liability under the Accounting Standards for Business Enterprises No. 13 – Contingencies.
The Group judges its status as the main responsible party or proxy in a transaction based on whether the Group had control over the goods or services prior to transferring to the customer. Where the Group had control over the goods or services prior to transferring to the customer, the Group is the main responsible party, and total received or receivable consideration shall be recognized as revenue; otherwise, the Group is the proxy, and the commission or fee expected to receive shall be recognized as revenue, which is determined by deducting net payable to other parties from the total received or receivable consideration.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
The Group has control over the goods before transferring them to the customer in the following circumstances:
- The Group obtains the control over the goods or other assets from a third party before transferring it to the customer;
- The Group can dominate a third party to provide services to the customer on behalf of the Group;
- After the control over the goods from a third party, the Group combines the goods with other goods into a combination output by providing significant service and transfers it to the customer.
In determining whether the Group has control over the goods before transferring it to the customer, the Group shall take into account of all relevant facts and circumstances, including:
- The Group bears the major responsibility for transferring goods to the customer;
- The Group assumes inventory risk of the goods before or after the transfer of the goods;
- The Group has the discretion to set the price of the goods.
For receipt in advance from customers for the provision of good or service, the amount shall initially be recognized as liability, and converted into revenue when relevant performance obligations are satisfied. When it is unnecessary for the Group to return the receipt in advance and the customer may forfeit all or part of his/her contractual rights, and that the Group is entitled to the amount in respect of the contractual rights forfeited by the customer, such amount shall be recognized as revenue in proportion to the pattern of rights exercised by the customer. Otherwise, the Group only recognizes such balance of the above liability as revenue when it becomes highly unlikely that customers would demand the fulfilling of the remaining performance obligation.
## (1) Revenue from sales of electricity
Revenue from sales of electricity is the primary component of revenue from sales of goods of the Group. Revenue is recognized when electricity of the Group is transferred to the grids stipulated in the electricity sales contracts, as in when the customer acquires control of the electricity.
## (2) Revenue from construction, installation and design services
The Group adopts the input method to appropriately determine the progress to completion of satisfying performance obligation for construction, installation and design services. Input method is a way to determine the progress to satisfying the performance obligation based on the Group's input, for which the Group adopts costs incurred as the indicator of input. Revenue is recognized at the amount calculated by total transaction price under the contract at the date of balance sheet multiplied by progress in satisfying the performance obligation, and further deducting recognized revenue from prior accounting periods. When progress cannot be reasonably determined and the incurred costs are expected to be compensated, revenue is recognized according to costs already incurred until the reasonable determination of progress becomes practicable.
## (3) Provision of labor services
The Group adopts the output method to appropriately determine the progress to completion of satisfying performance obligation for the provision of labor services. Output method is a way to determine the progress to satisfying the performance obligation based on the value of goods transferred to the customer, for which the Group adopts milestones reached as the indicator of output. Revenue is recognized at the amount calculated by total transaction price under the contract at the date of balance sheet multiplied by progress in satisfying the performance obligation, and further deducting recognized revenue from prior accounting periods. If the result of labor transaction cannot be reliably estimated, labor revenue is recognized at labor costs already incurred or that which can be compensated, and the labor costs incurred shall be stated as current expense. Labor costs already incurred not expected to be compensated shall not be recognized as revenue.
## (4) Sale of goods
Revenue is recognized when the goods of the Group are delivered to the venue of the customer and the customer has accepted such goods, as in when the customer acquires control of the goods.
---
# 27. Government grants
Government grants are transfer of monetary assets and non-monetary assets from the government to the Group at no consideration. Government grants are recognized when prescribed conditions are satisfied and they will be received without uncertainties.
If a government grant is in the form of a transfer of a monetary asset, it is measured at the amount received or receivable. If a government subsidy is a non-monetary asset, it should be measured at its fair value. If its fair value cannot be obtained in a reliable way, it should be measured at its nominal amount. Government grants measured at nominal amount are directly recognized in profit or loss.
## (1) Determination basis and accounting treatment of government grants related to assets
A government grant related to an asset is recognized as deferred income, and evenly amortized to current profit or loss over the useful life of the related asset.
## (2) Determination basis and accounting treatment of government grants related to income
For a government grant related to income, if the grant is a compensation for related expenses or losses to be incurred in subsequent periods, the grant is recognized as deferred income, and recognized in profit or loss over the period in which the related costs or loss are recognized. If the grant is a compensation for related expenses or losses already incurred, the grant is recognized immediately in profit or loss for the current period. If the nature of the government grants is difficult to differentiate, such grants are wholly classified under government grants related to income.
A government grant related to Group's business activities, is recognized as other income based on the substance of economic activities. A government grant non-related to the Group's business activities, is recognized as non-operating income.
For the repayment of a government grant already recognized, if there is any balance of related deferred income, the repayment shall be written-off against the book balance of deferred income, and any excess shall be recognized in profit or loss for the period.
# 28. Deferred tax assets/deferred tax liabilities
Income tax expenses include current income tax and deferred income tax.
## (1) Current income tax
At the balance sheet date, current income tax liabilities (or assets) for the current and prior periods shall be measured at the amount expected to be paid (or recovered) according to the requirements of tax laws.
## (2) Deferred tax assets and deferred tax liabilities
For temporary differences between the carrying amounts of certain assets or liabilities and their tax base, or between the nil carrying amount of those items that are not recognized as assets or liabilities and their tax base that can be determined according to tax laws, deferred tax assets and liabilities are recognized using the balance sheet liability method.
Deferred tax is generally recognized for all temporary differences. Deferred tax assets for deductible temporary differences are recognized to the extent that it is probable that taxable profits will be available against which the deductible temporary differences can be utilized.
For deductible losses and tax credits that can be carried forward, deferred tax assets are recognized to the extent that it is probable that future taxable profits will be available against which the deductible losses and tax credits can be utilized.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
Deferred tax liabilities are recognized for taxable temporary differences associated with investments in subsidiaries and associates, and interests in joint ventures, except where the Group is able to control the timing of the reversal of the temporary difference and it is probable that the temporary difference will not reverse in the foreseeable future. Deferred tax assets arising from deductible temporary differences associated with such investments and interests are only recognized to the extent that it is probable that there will be taxable profits against which to utilize the benefits of the temporary differences and they are expected to reverse in the foreseeable future.
At the balance sheet date, deferred tax assets and liabilities are measured at the tax rates, according to tax laws, that are expected to apply in the period in which the asset is realized or the liability is settled.
If a single transaction is not a business combination, the transaction affects neither accounting profit nor taxable income (or deductible losses), and the assets and liabilities initially recognized do not result in an equal amount of taxable temporary differences and deductible losses, then the temporary differences arising from such transaction will not generate deferred income tax. Temporary differences caused by the initial recognition of goodwill will not generate relevant deferred income tax as well.
Current and deferred tax expenses or income are recognized in profit or loss for the period, except when they arise from transactions or events that are directly recognized in other comprehensive income or in shareholders' equity, in which case they are recognized in other comprehensive income or in shareholders' equity; and when they arise from business combinations, in which case they adjust the carrying amount of goodwill.
At the balance sheet date, the carrying amount of deferred tax assets is reviewed and reduced if it is no longer probable that sufficient taxable profits will be available in the future to allow the benefit of deferred tax assets to be utilized. Such reduction in amount is reversed when it becomes probable that sufficient taxable profits will be available.
## (3) Offsetting of income tax
When the Group has a legal right to settle on a net basis and intends either to settle on a net basis or to realize the assets and settle the liabilities simultaneously, current tax assets and current tax liabilities of the Group are offset and presented on a net basis.
When the Group has a legal right to settle current tax assets and liabilities on a net basis, and deferred tax assets and deferred tax liabilities relate to income taxes levied by the same taxation authority on either the same taxable entity or different taxable entities which intend either to settle current tax assets and liabilities on a net basis or to realize the assets and liabilities simultaneously, in each future period in which significant amounts of deferred tax assets or liabilities are expected to be reversed, deferred tax assets and deferred tax liabilities are offset and presented on a net basis.
# 29. Leases
A lease refers to a contract in which a lessor assigns the right to use an asset to a lessee within a certain period of time to obtain consideration.
At the commencement date of a contract, the Group evaluates whether the contract is a lease or contains a lease. Unless the contract terms and conditions change, the Group does not reassess whether the contract is a lease or contains a lease.
## (1) The Group as a lessee
### (a) Allocation of leases
For a contract that contains one or more lease component and non-lease components, the Group allocates the consideration in the contract to each lease component on the basis of the relative standalone price of the lease component and the aggregate standalone price of the non-lease components.
---
## (b) Right-of-use assets
Except for short-term leases and leases of low value assets, the Group recognizes right-of-use assets at the commencement date of the lease (i.e. the date the underlying asset provided by the lessor is available for use by the Group). The right-of-use asset is initially measured at cost. This cost includes:
- the initial measurement amount of the lease liabilities;
- any lease payments made at or before the commencement date of the lease, less any lease incentives received;
- any initial direct costs incurred by the Group;
- an estimate of costs to be incurred by the Group in dismantling and removing the underlying assets, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and conditions of the lease.
The Group makes provisions for depreciation of right-of-use assets according to the relevant depreciation requirements in the Accounting Standards for Business Enterprises No. 4 – Fixed Assets. Right-of-use assets in which the Group is reasonably certain to obtain ownership of the underlying leased assets at the end of the lease term is depreciated from commencement date to the end of the useful life. Otherwise, right-of-use assets are depreciated over the shorter of its estimated useful life and the lease term.
The Group determines whether a right-of-use asset has been impaired in accordance with the Accounting Standards for Business Enterprises No. 8 – Asset Impairment and accounts for the identified impairment losses.
## (c) Lease liabilities
At the commencement date of a lease, the Group initially measures the lease liabilities at the present value of lease payments that are unpaid at that date, except for short-term leases and low-value asset leases. In calculating the present value of lease payments, the Group uses the interest rate implicit in the lease as the discount rate. If the interest rate implicit in the lease is not readily determinable, the incremental borrowing rate is used as the discount rate.
Lease payment refers to the amount paid by the Group to the lessor relating to the right to use an underlying asset during the lease term, including:
- fixed payments and in-substance fixed payments less any lease incentives receivable;
- variable lease payments that depend on an index or a rate;
- the exercise price of a purchase option reasonably certain to be exercised by the Group;
- payments of penalties for terminating a lease, if the lease term reflects the Group exercising the option to terminate;
- amounts expected to be paid under residual value guarantees.
After the commencement date of the lease term, the Group calculates the interest expense of the lease liabilities for each period of the lease term based on a fixed periodic interest rate, and included it in the current profit or loss or the cost of underlying assets.
After the commencement date of the lease term, the Group re-measures the lease liabilities and adjusts the corresponding right-of-use asset in the following circumstances. If the carrying value of the right-of-use asset has been reduced to zero, but the lease liability still needs to be further reduced, the Group will calculate the difference into the current profit or loss:
- The Group re-measures the lease liabilities based on the present value of the post-change lease payments and the revised discount rate as a result of changes in the lease term or changes in the purchase option;
- The Group re-measures the lease liabilities based on the present value of the changed lease payments and the original discount rate, based on the amount of the amount payable or the index or proportion used to determine the lease payments.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
### (d) Short-term leases and leases of low-value assets
The Group decides not to recognize right-of-use assets and lease liabilities for short-term leases and leases of low-value assets. Short-term leases are leases that have a lease term of 12 months or less from the commencement date and do not contain a purchase option. A lease of low-value asset refers to a single lease asset, when new, is of low value. Lease payments on short-term leases and leases of low-value assets are recognized in the current period profit or loss or the cost of underlying assets on a straight-line basis over the lease term.
### (e) Lease modifications
The Group accounts for as a separate lease when the lease changes and the following conditions are met at the same time:
- the modification increases the scope of the lease by adding the right to use one or more underlying assets;
- the consideration for the leases increases by an amount commensurate with the stand-alone price for the increase in scope and any appropriate adjustments to that stand-alone price to reflect the circumstances of the particular contract.
For lease changes that are not accounted for as a separate lease, the Group will reallocate the consideration of the contract after the change on the effective date of the lease change, and re-determine the lease term, and the lease liability shall be remeasured at the present value calculated based on the changed lease payment amount and the revised discount rate.
If the modification of lease results in a narrower scope of lease or a shorter lease term, the Group reduces the carrying value of the right-of-use assets to reflect the partial or complete termination of the lease. The Group recognizes the gain or loss relevant to the partial or complete termination of the leases in the current profit or loss. For other modification of lease, the Group adjusts the carrying value of the right-of-use assets accordingly.
## (2) The Group as a lessor
### (a) Allocation of leases
Where the contract includes both the lease and non-lease components, the Group apportions the contract consideration according to the provisions of the Accounting Standards for Business Enterprises No. 14 – Revenue on the transaction price allocation. The basis of the apportionment is the individual selling price of the leased part and the non-lease part.
### (b) Classification of leases
A lease that substantially transfers almost all the risks and rewards related to the ownership of leased assets is a financial lease. Leases other than finance leases are operating leases.
- **The Group records the operating lease business as a lessor.**
During each period of the lease term, the Group recognizes the lease payments from operating leases as rental income using the straight-line method. The initial direct expenses incurred by the Group in relation to the operating leases are capitalized and allocated in the current period profit or loss by instalments during the lease term on the same basis as the recognition of rental income.
The variable lease payments received by the Group in connection with the operating leases that are not included in the lease payments are recognized in profit or loss in the period in which they are incurred.
---
# 30. Major accounting estimates and judgments
The preparation of the consolidated financial statements requires the management of the Group to make estimates and assumptions that affect the application of accounting policies and the amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates. Key assumptions of the estimates and judgments of uncertainties are reviewed on an ongoing basis by the management of the Group. The effects of changes in accounting estimates are recognized in the period in which the estimate is revised and in any future periods affected. Except for the accounting estimates in relation to the depreciation and amortization of assets such as investment properties, fixed assets, intangible assets, long-term deferred expenses and right-of-use assets (see Notes (III) 16, 17, 20, 22 and 29) and the impairment of various assets (see Notes (V) 3, 4, 5, 6, 7, 10, 12, 13, 14, 15, 16 and 17, and Notes (XV) 1, 2 and 5), the other major accounting estimates are as follows:
1. **Revenue recognition** – As stated in Note (III) 26, the Group recognizes the revenue related to the construction, installation and design services and provision of labor services over a period of time. The recognition of the relevant revenue and profits depends on the Group’s estimates of the contract results and the performance progress. If the total revenue and total cost actually incurred are higher or lower than the estimated value of the management, it will affect the amount of revenue and profit to be recognized by the Group in the future.
2. Note (V) 19 – Recognition of deferred tax assets;
3. Note (V) 34 – Post-employment benefits of defined benefit plan;
4. Note (V) 35 – Provisions; and
5. Note (X) – Disclosure of fair value.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (IV) TAXATION
### 1. Main tax categories and tax rates
| Taxation category | Taxation basis | Tax rate/charge rate |
| :--- | :--- | :--- |
| Value-added tax (VAT) | (Note 1) | Exempted, 3%, 5%, 6%, 9%, 13% |
| Education surcharges | Paid-in VAT | 3% |
| Local education surcharges | Paid-in VAT | 2% |
| Urban maintenance and construction tax | Paid-in VAT | 1%, 5%, 7% |
| Real estate tax | Tax basis under relevant tax law (Note 2) | 1.2%, 4%, 12% |
| Enterprise income tax | Taxable income | 15%, 20%, 25% |
**Note 1:** VAT payable is output tax minus deductible input tax, and the output tax is calculated based on sales and applicable VAT tax rate as determined by relevant tax law.
The revenue from sales of electricity of the subsidiaries of the Company, namely Guangdong Nuclear Power Investment Co., Ltd. (“GNIC”), GNPJVC, Fujian Ningde Nuclear Power Co., Ltd. (福建寧德核電有限公司) (“Ningde Nuclear”), Ling’ao Nuclear Power Co., Ltd. (嶺澳核電有限公司) (“Ling’ao Nuclear”), Lingdong Nuclear Power Co., Ltd. (嶺東核電有限公司) (“Lingdong Nuclear”), Yangjiang Nuclear Power Co., Ltd. (陽江核電有限公司) (“Yangjiang Nuclear”), Taishan Nuclear Power Joint Venture Co., Ltd. (台山核電合營有限公司) (“Taishan Nuclear”), Guangxi Fangchenggang Nuclear Power Co., Ltd. (廣西防城港核電有限公司) (“Fangchenggang Nuclear”), Guangxi Fanghe Power Sales Co., Ltd. (廣西防核售電有限公司), CGN Power Sales Co., Ltd. (中廣核電力銷售有限公司) and Fujian Ninghe Power Sales Co., Ltd. (福建寧核售電有限公司), was subject to VAT. The revenue from sales of goods or equipment of the subsidiaries of the Company, namely China Nuclear Power Technology Research Institute (中廣核研究院有限公司) (“CNPRI”), Suzhou Nuclear Power Research Institute (蘇州熱工研究院有限公司) (“SNPI”), China Nuclear Power Engineering Co., Ltd. (中廣核工程有限公司) (“CGN Engineering”), China Nuclear Power Design Co., Ltd. (Shenzhen) (深圳中廣核工程設計有限公司) (“CGN Design”), GNPJVC, Ningde Nuclear, Ling’ao Nuclear, Lingdong Nuclear, Yangjiang Nuclear, Taishan Nuclear, Fangchenggang Nuclear, CGN Inspection Technology Co., Ltd. (中廣核檢測技術有限公司) (“Inspection Company”), China Nuclear Power (Shenzhen) Operational Technology and Radiation Monitoring Co., Ltd. (中廣核(深圳)運營技術與輻射監測有限公司) (“Radiation Monitoring Company”), CGN Import & Export Co., Ltd. (中廣核進出口有限公司) (“Import & Export Company”) and CGN Intelligent Manufacturing Technology (Suzhou) Co., Ltd. (中廣核智造科技(蘇州)有限公司), was subject to VAT. Revenue from repair service of China Nuclear Power Operations Co., Ltd. (中廣核核電運營有限公司) (“CGN Operations”), a subsidiary of the Company, was subject to VAT. Except for certain export sales of electricity of GNPJVC are applicable to VAT exemption, deduction and refund, the applicable VAT tax rate of the revenue from aforesaid business was 13%.
Revenue from newspaper and magazine publication of SNPI, a subsidiary of the Company, was subject to VAT at 9% using the general tax calculation method. Revenue from rental services of tangible personal property of Taishan Nuclear, a subsidiary of the Company, was subject to VAT at 13% using the general tax calculation method. Revenue from leasing offshore wind power installation platforms of CGN Engineering, a subsidiary of the Company, was subject to VAT at 9% using the general tax calculation method. The real estate rental income of the subsidiaries of the Company, namely Ling’ao Nuclear, Lingdong Nuclear, Fangchenggang Nuclear, Daya Bay Nuclear Power Operations and Management Co., Ltd. (大亞灣核電運營管理有限責任公司) (“DNMC”), CGN Operations and GNPJVC, and the real estate rental income of CGN Engineering, Yangjiang Nuclear and SNPI was subject to VAT at 9% using the general tax calculation method. The real estate rental and disposal income of the subsidiaries of the Company, namely Inspection Company, GNIC, Ningde Nuclear and CGN Engineering, and certain real estate rental income of CNPRI, Yangjiang Nuclear and SNPI, was subject to VAT at 5% using a simple tax computation method.
Revenue from technical service of the subsidiaries of the Company, namely CNPRI, SNPI, Radiation Monitoring Company, Inspection Company, CGN Intelligent Manufacturing Technology (Suzhou) Co., Ltd. (中廣核智造科技(蘇州)有限公司), CGN Engineering, CGN Design, CGN Nanfang Technology Co., Ltd. (中廣核南方科技有限公司), CGN Operations, CGN Clean Energy Technology (Shanghai) Co., Ltd. (中廣核清潔能源科技(上海)有限公司) (“CGN Clean Energy”), Lingdong Nuclear, Fangchenggang Nuclear, DNMC and GNPJVC was subject to VAT. Entrusted loan interest income of the Company and its subsidiaries, namely CGN Ninghe Investment Co., Ltd. (中廣核寧核投資有限公司) (“Ninghe Investment”), CGN Nuclear Power Investment Co., Ltd. (中廣核核電投資有限公司), Fangchenggang Nuclear, Taishan Nuclear, CGN Engineering, CGN Design, Ningde Nuclear, Ling’ao Nuclear, Lingdong Nuclear, Yangjiang Nuclear, SNPI, CNPRI, CGN Nanfang Technology Co., Ltd. (中廣核南方科技有限公司), GNIC, Radiation Monitoring Company, CGN Operations, Inspection Company, CGN Power Sales Co., Ltd. (中廣核電力銷售有限公司), Guangxi Fangchenggang CGN Nuclear Power Industry Investment Co., Ltd. (廣西防城港中廣核核電產業投資有限公司) (“Fangchenggang Investment”), Guangxi Fangchenggang Third Nuclear Power Co., Ltd. (廣西防城港第三核電有限公司), GNPJVC, CGN Lufeng Nuclear Power Co., Ltd. (中廣核陸豐核電有限公司) (“Lufeng Nuclear”), Shandong Zhaoyuan Nuclear Power Co., Ltd. (山東招遠核電有限公司) (“Zhaoyuan Nuclear”), Shenzhen Hepeng Project Supervision Co., Ltd. (深圳市核鵬工程監理有限責任公司) (“Hepeng Supervision Company”), Import & Export Company, Fujian Ninghe Power Sales Co., Ltd. (福建寧核售電有限公司), CGN Clean Energy, Guangxi Fanghe Power Sales Co., Ltd. (廣西防核售電有限公司), Huapeng Technology Energy (Guangdong) Co., Ltd. (華鵬科技能源(廣東)有限公司), Yangxi Nuclear Power Co., Ltd. (陽西核電有限公司), CGN Taishan Second Nuclear Power Co., Ltd. (中廣核台山第二核電有限公司) (“Taishan Second Nuclear”), CGN Intelligent Manufacturing Technology (Suzhou) Co., Ltd. (中廣核智造科技(蘇州)有限公司), CGN Eastern Guangdong (Lufeng) Nuclear Co., Ltd.
---
(中廣核粵東(陸豐)核電有限公司)) and CGN Huasheng Technology (Shenzhen) Co., Ltd. (中廣核華昇科技(深圳)有限公司), was subject to VAT. Revenue from outages service of the subsidiaries of the Company, namely DNMC and CGN Operations, was subject to VAT. Revenue from training of the subsidiaries of the Company, namely Taishan Nuclear, DNMC, CGN Operations, Yangjiang Nuclear, Ningde Nuclear and Fangchenggang Nuclear, was subject to VAT. Revenue from human resources services of DNMC, a subsidiary of the Company, was subject to VAT. Revenue from import and export agency service fee of Import & Export Company, a subsidiary of the Company, was subject to VAT. Revenue from supervision of Hepeng Supervision Company, a subsidiary of the Company, was subject to VAT. Revenue from accommodation service of the subsidiaries of the Company, namely Fangchenggang Nuclear, Ningde Nuclear and Yangjiang Nuclear, was subject to VAT. Revenue from entrusted operation and management services of Fangchenggang Nuclear, a subsidiary of the Company, was subject to VAT. Revenue from engineering management service fees, bidding agency, R&D, recruitment service and accommodation service of CGN Engineering, a subsidiary of the Company, was subject to VAT. The applicable VAT tax rate of the revenue from aforesaid business was 6%.
Revenue from construction contracts provided by way of projects with self-supplying materials and old construction projects of CGN Engineering, a subsidiary of the Company, was subject to VAT at 3% using a simple tax computation method, while revenue from other construction contracts of CGN Engineering, CGN Design and SNPI was subject to a VAT tax rate at 9% using the general tax calculation method.
Revenue from technical services provided overseas of the subsidiaries of the Company, namely CGN Engineering and CGN Design, was exempt from VAT.
**Note 2:** Self-occupied properties are subject to tax at 1.2% per year, with residual value after a one-time deduction of 10%-30% as tax basis; the properties located in Shenzhen, Guangdong Province are subject to tax at 1.2% per year, with residual value after a one-time deduction of 10%-30% as tax basis, while the remaining properties are subject to tax at 12% per year, with the real estate lease income as tax basis. In particular, for residential housing rented to individuals at market prices and used for residence, property tax is levied at a reduced rate of 4%.
# 2. Tax preference
## VAT "levy first, refund later" policy
Pursuant to the Circular on Relevant Issues Concerning Taxation in Nuclear Power Industry (Cai Shui [2008] No. 38) (《關於核電行業稅收政策有關問題的通知》(財稅[2008]38 號)) issued by the Ministry of Finance and State Administration of Taxation, sales of electrical products of the Company's subsidiaries, namely Lingdong Nuclear, Yangjiang Nuclear, Ningde Nuclear, Fangchenggang Nuclear and Taishan Nuclear, were entitled to the VAT "levy first, refund later" policy within 15 years from the second month to the commencement of commercial production of their power generating units, with the refund ratio gradually decreasing in three phases. Within 5 years from the second month to the commencement of commercial production, refund ratio is 75% of deposited tax; between 6th to 10th years from the second month to the commencement of commercial production, refund ratio is 70% of deposited tax; and between 11th to 15th years from the second month to the commencement of commercial production, refund ratio is 55% of deposited tax. After 15 years from the second month to the commencement of commercial production, the "levy first, refund later" policy is no longer applicable.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
Pursuant to the Announcement on Policies Concerning the Adjustment of Value-Added Tax on Wind Power and Other Sectors (Announcement No. 10 of the Ministry of Finance, the General Administration of Customs and the State Administration of Taxation in 2025) (《關於調整風力發電等增值稅政策的公告》(財政部 海關總署 稅務總局2025年第10號)) issued by the Ministry of Finance, the General Administration of Customs of the People’s Republic of China and the State Administration of Taxation, for nuclear power generating units that had commenced commercial production before October 31, 2025, the relevant VAT provisions under the Circular on Relevant Issues Concerning Taxation in Nuclear Power Industry (Cai Shui [2008] No. 38) (《關於核電行業稅收政策有關問題的通知》(財稅[2008]38號)) issued by the Ministry of Finance and State Administration of Taxation shall continue to apply; for nuclear power generating units that were approved by the State Council before October 31, 2025 but had not yet commenced commercial production, the nuclear power generation enterprises were entitled to the VAT “levy first, refund later” policy in production and sale of electrical products within 10 years from the second month to the commencement of commercial production, with the refund ratio being 50% of deposited tax, while other VAT provisions continue to be implemented in accordance with the Circular on Relevant Issues Concerning Taxation in Nuclear Power Industry (Cai Shui [2008] No. 38) (《關於核電行業稅收政策有關問題的通知》(財稅[2008]38號)) issued by the Ministry of Finance and State Administration of Taxation. For nuclear power generating units approved after November 1, 2025, the VAT “levy first, refund later” policy is no longer applicable. The stages of VAT “levy first, refund later” policy applicable to each generating unit are as follows:
| Applicable generating unit | 75% tax refund | 70% tax refund | 55% tax refund |
| :--- | :--- | :--- | :--- |
| Lingdong Unit 1 | October 2010 – September 2015 | October 2015 – September 2020 | October 2020 – September 2025 |
| Lingdong Unit 2 | September 2011 – August 2016 | September 2016 – August 2021 | September 2021 – August 2026 |
| Yangjiang Unit 1 | April 2014 – March 2019 | April 2019 – March 2024 | April 2024 – March 2029 |
| Yangjiang Unit 2 | July 2015 – June 2020 | July 2020 – June 2025 | July 2025 – June 2030 |
| Yangjiang Unit 3 | February 2016 – January 2021 | February 2021 – January 2026 | February 2026 – January 2031 |
| Yangjiang Unit 4 | April 2017 – March 2022 | April 2022 – March 2027 | April 2027 – March 2032 |
| Yangjiang Unit 5 | August 2018 – July 2023 | August 2023 – July 2028 | August 2028 – July 2033 |
| Yangjiang Unit 6 | August 2019 – July 2024 | August 2024 – July 2029 | August 2029 – July 2034 |
| Ningde Unit 1 | May 2013 – April 2018 | May 2018 – April 2023 | May 2023 – April 2028 |
| Ningde Unit 2 | June 2014 – May 2019 | June 2019 – May 2024 | June 2024 – May 2029 |
| Ningde Unit 3 | July 2015 – June 2020 | July 2020 – June 2025 | July 2025 – June 2030 |
| Ningde Unit 4 | August 2016 – July 2021 | August 2021 – July 2026 | August 2026 – July 2031 |
| Fangchenggang Unit 1 | February 2016 – January 2021 | February 2021 – January 2026 | February 2026 – January 2031 |
| Fangchenggang Unit 2 | November 2016 – October 2021 | November 2021 – October 2026 | November 2026 – October 2031 |
| Fangchenggang Unit 3 | April 2023 – March 2028 | April 2028 – March 2033 | April 2033 – March 2038 |
| Fangchenggang Unit 4 | June 2024 – May 2029 | June 2029 – May 2034 | June 2034 – May 2039 |
| Taishan Unit 1 | January 2019 – December 2023 | January 2024 – December 2028 | January 2029 – December 2033 |
| Taishan Unit 2 | October 2019 – September 2024 | October 2024 – September 2029 | October 2029 – September 2034 |
---
# Income tax incentives
Pursuant to the PRC Enterprise Income Tax Law, the subsidiaries or generating units of the Group enjoying preferential enterprise income tax policies are as follows:
| Name of company or generating unit | Preferential tax rate applicable for the current year | Preferential tax rate applicable for the previous year | Reason for tax incentives |
| :--- | :--- | :--- | :--- |
| Yangjiang Unit 6 | N/A | 12.50% | Operating income tax preferential treatment in relation to investment in public infrastructure projects as supported strategically by the nation |
| Fangchenggang Unit 1 and Unit 2 | 15.00% | 15.00% | Western development enterprise income tax preferential policy (2016-2030) |
| Fangchenggang Unit 3 | Exempted | Exempted | Western development enterprise income tax preferential policy (2016-2030) and operating income tax preferential treatment in relation to investment in public infrastructure projects as supported strategically by the nation |
| Fangchenggang Unit 4 | Exempted | Exempted | Western development enterprise income tax preferential policy (2016-2030) and operating income tax preferential treatment in relation to investment in public infrastructure projects as supported strategically by the nation |
| Taishan Unit 2 | N/A | 12.50% | Operating income tax preferential treatment in relation to investment in public infrastructure projects as supported strategically by the nation |
| GNPJVC | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| Ling’ao Nuclear | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| Lingdong Nuclear | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| CNPRI | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| SNPI | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| Inspection Company | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| Radiation Monitoring Company | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| CGN Engineering | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| CGN Design | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| CGN Operations | 15.00% | 15.00% | Preferential tax policy for high-tech enterprises |
| Import & Export Company (Note) | 20.00% | 20.00% | Preferential enterprise income tax policy for small and micro-profit enterprises |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
**Note:** According to the Announcement of the Ministry of Finance and the State Administration of Taxation on Tax Policies for Further Support of Development of Micro and Small Enterprises and Individual Industrial and Commercial Households (Announcement No. 12 of the Ministry of Finance and the State Administration of Taxation in 2023) (《財政部稅務總局關於進一步支持小微企業和個體工商戶發展有關稅費政策的公告》(財政部稅務總局公告 2023 年第 12 號)), 25% of the taxable income of small and micro-profit enterprises will be reduced, and the EIT will be at the tax rate of 20%, which will be effective until December 31, 2027.
## Other tax preferential policies
Pursuant to the Notice on Levy of and Exemption from Urban Land Use Tax for Land of Nuclear Power Station (Cai Shui [2007] No. 124) (《關於核電站用地徵免城鎮土地使用稅的通知》(財稅[2007]124 號)) issued by the Ministry of Finance and the State Administration of Taxation, other than nuclear islands, conventional islands, auxiliary plants, land for communication facilities (excluding land for underground lines) and land for living and office, other land for NPPs are exempt from urban land use tax. Taxable land of NPPs is subject to half of the urban land use tax during infrastructure construction period.
Pursuant to the Announcement on Tax Policies on Supporting Financing for Small and Micro Enterprises (Cai Shui [2023] No. 13) (《關於支持小微企業融資有關稅收政策的公告》(財稅[2023]13 號)) issued by the Ministry of Finance and the State Administration of Taxation, stamp duty is exempted from loan contracts entered into between financial institutions and small and micro-profit enterprises.
Pursuant to the Notice on Relevant Policies and Regulations on Property Tax and Urban Land Use Tax of the State Administration of Taxation Forwarded by the Shenzhen Municipal Local Taxation Bureau (Shen Di Shui Fa [2003] No. 676) (《深圳市地方稅務局轉發國家稅務總局關於房產稅城鎮土地使用稅有關政策規定的通知》(深地稅發[2003]676 號)), property tax is exempted for three years starting from the month following completion, and property tax shall be paid according to regulations after such three years. The China Guangdong Nuclear Power Engineering Building of CGN Engineering is exempted from property tax from March 2024 to March 2027.
# (V) NOTES TO ITEMS IN THE CONSOLIDATED FINANCIAL STATEMENTS
## 1. Cash at bank and in hand
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Cash at bank | 20,621,255,463.60 | 16,635,218,980.91 |
| – Deposits with CGN Finance | 20,469,994,598.37 | 16,546,849,676.88 |
| – Deposits with CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | 37,486,099.32 | 31,686,736.11 |
| – Deposits with banks | 113,774,765.91 | 56,682,567.92 |
| Other cash at bank and in hand | 205,465,355.43 | 391,077,219.94 |
| **Total** | **20,826,720,819.03** | **17,026,296,200.85** |
| Including: Total amount deposited overseas | 37,486,099.32 | 33,795,324.38 |
As at December 31, 2025 and December 31, 2024, the other cash at bank and in hand as mentioned above were various deposits, land reclamation deposits, restricted and frozen deposits by the Group, as a supplier, in accordance with the purchase and sales contracts, and their uses were restricted (please see Note (V) 63).
---
# 2. Bills receivable
## (1) Bills receivable disclosed by category
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Bank acceptance bills | 3,597,149.26 | 9,681,081.65 |
## (2) Bills receivable discounted but outstanding at the balance sheet date
| Item | Derecognized amount at the end of the year | Not-yet derecognized amount at the end of the year |
| :--- | :--- | :--- |
| Bank acceptance bills | 5,700,000,000.00 | – |
There was no bills receivable which were endorsed but outstanding at the balance sheet date and no bills receivable which were discounted but outstanding at the balance sheet date and did not meet the conditions of derecognition at the end of this year.
## (3) All of the bills receivable are due within one year, and the aging are counted starting from the date when bills receivable are recognized.
## (4) As at December 31, 2025 and December 31, 2024, the Group had no bills transferred to accounts receivable due to non-performance of the issuers.
## (5) The Group considers that the acceptors of its bank bills have high credit ratings and there is no significant credit risk.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 3. Accounts receivable
### (1) Accounts receivable disclosed by category
| Category | December 31, 2025 | | | | | December 31, 2024 (Restated) | | | | |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| | **Carrying balance** | | **Bad debt provisions** | | **Carrying value** | **Carrying balance** | | **Bad debt provisions** | | **Carrying value** |
| | **Amount** | **Percentage** | **Amount** | **Provisions percentage** | | **Amount** | **Percentage** | **Amount** | **Provisions percentage** | |
| Accounts receivable for which provision for bad debts has been individually made | 628,406,310.69 | 7.73% | 75,921,533.46 | 12.08% | 552,484,777.23 | 851,598,328.52 | 9.20% | 76,591,109.52 | 8.99% | 775,007,219.00 |
| Accounts receivable for which provision for bad debts has been made by group | 7,501,775,240.84 | 92.27% | 42,012,769.92 | 0.56% | 7,459,762,470.92 | 8,408,500,932.40 | 90.80% | 76,438,248.10 | 0.91% | 8,332,062,684.30 |
| – Group 1 | 7,174,418,934.43 | 88.24% | 34,394,912.38 | 0.48% | 7,140,024,022.05 | 8,105,475,333.50 | 87.53% | 37,928,657.57 | 0.47% | 8,067,546,675.93 |
| – Group 2 | 327,356,306.41 | 4.03% | 7,617,857.54 | 2.33% | 319,738,448.87 | 303,025,598.90 | 3.27% | 38,509,590.53 | 12.71% | 264,516,008.37 |
| **Total** | **8,130,181,551.53** | **100.00%** | **117,934,303.38** | **1.45%** | **8,012,247,248.15** | **9,260,099,260.92** | **100.00%** | **153,029,357.62** | **1.65%** | **9,107,069,903.30** |
As part of the Group’s credit risk management, the Group uses the age of accounts receivable to assess the impairment loss by grouping of accounts receivable with the same risk characteristics. The credit risk and expected credit loss of each aging risk portfolio of accounts receivable are as follows:
### Group 1:
| Aging | December 31, 2025 | | | | December 31, 2024 (Restated) | | | |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| | **Expected credit loss rate** | **Carrying balance** | **Bad debt provisions** | **Carrying value** | **Expected credit loss rate** | **Carrying balance** | **Bad debt debt provisions** | **Carrying value** |
| Within 1 year | 0.30% | 7,080,414,422.43 | 21,241,243.27 | 7,059,173,179.16 | 0.30% | 7,978,132,626.61 | 23,932,627.60 | 7,954,199,999.01 |
| 1 to 2 years | 5.00% | 51,696,231.69 | 2,584,811.58 | 49,111,420.11 | 5.00% | 81,376,463.60 | 4,068,823.18 | 77,307,640.42 |
| 2 to 3 years | 20.00% | 21,236,265.64 | 4,247,253.13 | 16,989,012.51 | 20.00% | 38,626,661.98 | 7,725,332.40 | 30,901,329.58 |
| 3 to 4 years | 30.00% | 21,072,014.67 | 6,321,604.40 | 14,750,410.27 | 30.00% | 7,339,581.31 | 2,201,874.39 | 5,137,706.92 |
| **Total** | | **7,174,418,934.43** | **34,394,912.38** | **7,140,024,022.05** | | **8,105,475,333.50** | **37,928,657.57** | **8,067,546,675.93** |
---
## Group 2:
| Aging | Expected credit loss rate (December 31, 2025) | Carrying balance (December 31, 2025) | Bad debt provisions (December 31, 2025) | Carrying value (December 31, 2025) | Expected credit loss rate (December 31, 2024) | Carrying balance (December 31, 2024) | Bad debt provisions (December 31, 2024) | Carrying value (December 31, 2024) |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Within 1 year | 0.30% | 304,646,274.11 | 913,938.83 | 303,732,335.28 | 0.30% | 220,213,342.57 | 660,640.03 | 219,552,702.54 |
| 1 to 2 years | 10.00% | 12,047,509.41 | 1,204,750.94 | 10,842,758.47 | 10.00% | 24,653,712.89 | 2,465,371.29 | 22,188,341.60 |
| 2 to 3 years | 30.00% | 5,242,435.89 | 1,572,730.77 | 3,669,705.12 | 30.00% | 8,419,913.24 | 2,525,973.97 | 5,893,939.27 |
| 3 to 4 years | 50.00% | 2,005,500.00 | 1,002,750.00 | 1,002,750.00 | 50.00% | 33,535,249.92 | 16,767,624.96 | 16,767,624.96 |
| 4 to 5 years | 80.00% | 2,454,500.00 | 1,963,600.00 | 490,900.00 | 80.00% | 567,000.00 | 453,600.00 | 113,400.00 |
| More than 5 years | 100.00% | 960,087.00 | 960,087.00 | - | 100.00% | 15,636,380.28 | 15,636,380.28 | - |
| **Total** | | **327,356,306.41** | **7,617,857.54** | **319,738,448.87** | | **303,025,598.90** | **38,509,590.53** | **264,516,008.37** |
## Disclosed by aging
| Aging | December 31, 2025 Carrying balance | December 31, 2024 Carrying balance (Restated) |
| :--- | :--- | :--- |
| Within 1 year (including 1 year) | 7,532,051,940.47 | 8,701,748,464.18 |
| 1 to 2 years | 470,899,716.06 | 146,784,322.70 |
| 2 to 3 years | 26,478,701.53 | 268,233,060.37 |
| More than 3 years | 100,751,193.47 | 143,333,413.67 |
| – 3 to 4 years | 23,077,514.67 | 40,874,831.23 |
| – 4 to 5 years | 2,454,500.00 | 12,563,110.36 |
| – More than 5 years | 75,219,178.80 | 89,895,472.08 |
| **Total** | **8,130,181,551.53** | **9,260,099,260.92** |
The aging analysis is counted starting from the date when the accounts receivable are recognized.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Changes in provisions for bad debts of accounts receivable
| | December 31, 2025 |
| :--- | :--- |
| Opening balance (restated) | 153,029,357.62 |
| Provisions made during the year | 29,751,021.89 |
| Recovered or reversed during the year | (64,724,081.69) |
| Bad debt provision write-off | (73,560.00) |
| Exchange differences arising on translation of financial statements | (48,434.44) |
| **Closing balance** | **117,934,303.38** |
## (3) Actual write-off of accounts receivable during the year
| Item | Write-off amount |
| :--- | :--- |
| Accounts receivables actually written off | 73,560.00 |
## (4) Top five debtors with the largest closing balances of accounts receivable and contract assets
| Name of entity | Total carrying balance of accounts receivable and contract assets | Percentage to total carrying balance of accounts receivable and contract assets | Total balance of provisions for bad debts at end of the year |
| :--- | :--- | :--- | :--- |
| Guangdong Power Grid Co., Ltd. (廣東電網有限責任公司) | 3,597,907,838.25 | 33.00% | 10,793,723.52 |
| CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 1,574,426,441.08 | 14.44% | 4,887,611.03 |
| Mengzi Zhongneng New Energy Co., Ltd. (蒙自中能新能源有限公司) | 1,261,026,985.39 | 11.56% | 401,405,739.86 |
| State Grid Fujian Electric Power Co., Ltd. | 1,040,693,270.94 | 9.54% | 3,122,079.81 |
| Guangxi Power Grid Co., Ltd. | 779,912,000.00 | 7.15% | 2,339,736.00 |
| **Total** | **8,253,966,535.66** | **75.69%** | **422,548,890.22** |
---
# 4. Prepayments
## (1) Prepayments by aging
| Aging | December 31, 2025 Amount | December 31, 2025 Percentage | December 31, 2024 (Restated) Amount | December 31, 2024 (Restated) Percentage |
| :--- | :--- | :--- | :--- | :--- |
| Within 1 year | 14,196,050,295.22 | 69.27% | 13,372,832,313.15 | 66.61% |
| 1 to 2 years | 4,398,597,537.03 | 21.46% | 3,037,658,647.32 | 15.13% |
| 2 to 3 years | 375,554,860.96 | 1.84% | 1,648,775,311.04 | 8.21% |
| More than 3 years | 1,522,677,511.83 | 7.43% | 2,018,283,108.01 | 10.05% |
| **Total** | **20,492,880,205.04** | **100.00%** | **20,077,549,379.52** | **100.00%** |
Description of the reasons for the non-timely settlement of prepayments aged over 1 year and in significant amount: Prepayments in significant amount and aged over 1 year are mainly prepayments for nuclear fuel procurement made to nuclear power companies, which have not yet been settled with the other party due to the long processing cycle of nuclear fuel components.
## (2) Top five entities with the largest closing balances of prepayments
| Name of entity | Amount | Percentage to total prepayments |
| :--- | :--- | :--- |
| CGNPC Uranium Resources Co., Ltd. | 13,091,612,303.14 | 63.88% |
| China Nuclear Industry Huaxing Construction Co., Ltd. (中國核工業華興建設有限公司) | 2,056,877,968.67 | 10.04% |
| FRAMATOME | 397,033,350.24 | 1.94% |
| China Construction Second Engineering Bureau Ltd. | 393,066,824.23 | 1.92% |
| China Energy Engineering Group Tianjin Electric Power Construction Co., Ltd. (中國能源建設集團天津電力建設有限公司) | 326,562,183.34 | 1.59% |
| **Total** | **16,265,152,629.62** | **79.37%** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
# 5. Other receivables
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Dividends receivable | 3,395,473.97 | 303,670,446.81 |
| Others | 844,989,367.28 | 780,198,134.60 |
| **Total** | **848,384,841.25** | **1,083,868,581.41** |
## (1) Dividends receivable
### (a) Dividends receivable
| Investee | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| CIECC Engineering Company Limited (中諮工程有限公司) | 3,842,791.68 | 3,842,791.68 |
| CGN Industry Investment Fund Phase I Co., Ltd. (中廣核一期產業投資基金有限公司) (“CGN Fund Phase I”) | - | 300,922,562.40 |
| **Total** | **3,842,791.68** | **304,765,354.08** |
| Less: Bad debt provisions | 447,317.71 | 1,094,907.27 |
| **Carrying value** | **3,395,473.97** | **303,670,446.81** |
### (b) Determining provision for bad debt
| Item | Phase 1 Expected credit losses within 12 months | Phase 2 Expected credit losses during the whole life (no credit impairment occurred) | Phase 3 Expected credit losses during the whole life (credit impairment occurred) | Total |
| :--- | :--- | :--- | :--- | :--- |
| **1. Bad debt provisions** | | | | |
| January 1, 2025 | 1,094,907.27 | - | - | 1,094,907.27 |
| – Transferred to phase 2 | (192,139.58) | 192,139.58 | - | - |
| Provisions for the year | - | 255,178.13 | - | 255,178.13 |
| Recovery or reversal for the year | (902,767.69) | - | - | (902,767.69) |
| December 31, 2025 | - | 447,317.71 | - | 447,317.71 |
| **2. Closing balance of dividends receivable** | - | 3,842,791.68 | - | 3,842,791.68 |
| **3. Provision percentage for bad debt provisions** | - | 11.64% | - | 11.64% |
---
# (2) Others
## (a) Disclosed by nature
| Nature of other receivables | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Related party payments | 14,742,738.05 | 13,947,025.56 |
| Employee borrowings and petty cash fund | 10,737,212.04 | 14,874,562.61 |
| Others | 836,819,126.01 | 765,316,666.44 |
| Total | 862,299,076.10 | 794,138,254.61 |
| Less: Bad debt provisions | 17,309,708.82 | 13,940,120.01 |
| Carrying value | 844,989,367.28 | 780,198,134.60 |
## (b) Disclosed by aging
| Aging | December 31, 2025 Carrying balance | December 31, 2024 Carrying balance (Restated) |
| :--- | :--- | :--- |
| Within 1 year (including 1 year) | 137,439,499.88 | 405,142,257.02 |
| 1 year to 2 years (including 2 years) | 344,034,686.12 | 7,980,426.11 |
| 2 years to 3 years (including 3 years) | 5,776,291.13 | 3,041,705.78 |
| More than 3 years | 375,048,598.97 | 377,973,865.70 |
| – 3 years to 4 years (including 4 years) | 573,764.59 | 373,452,026.08 |
| – 4 years to 5 years (including 5 years) | 373,267,083.05 | 58,126.50 |
| – More than 5 years | 1,207,751.33 | 4,463,713.12 |
| Subtotal | 862,299,076.10 | 794,138,254.61 |
| Less: Bad debt provisions | 17,309,708.82 | 13,940,120.01 |
| Total | 844,989,367.28 | 780,198,134.60 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (c) Disclosed by category
| Category | December 31, 2025 Carrying balance Amount | December 31, 2025 Carrying balance Percentage | December 31, 2025 Bad debt provisions Amount | December 31, 2025 Bad debt provisions percentage | December 31, 2025 Carrying value | December 31, 2024 (Restated) Carrying balance Amount | December 31, 2024 (Restated) Carrying balance Percentage | December 31, 2024 (Restated) Bad debt provisions Amount | December 31, 2024 (Restated) Bad debt provisions percentage | December 31, 2024 (Restated) Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Receivables for which provision for bad debts has been individually made | 704,155,121.00 | 81.66% | 12,148,804.13 | 1.73% | 692,006,316.87 | 372,421,375.00 | 46.90% | 6,399,524.68 | 1.72% | 366,021,850.32 |
| Receivables for which provision for bad debts has been made by group | 158,143,955.10 | 18.34% | 5,160,904.69 | 3.26% | 152,983,050.41 | 421,716,879.61 | 53.10% | 7,540,595.33 | 1.79% | 414,176,284.28 |
| – Group 1 | 15,176,766.14 | 1.76% | 347,029.00 | 2.29% | 14,829,737.14 | 31,271,933.39 | 3.94% | 499,062.57 | 1.60% | 30,772,870.82 |
| – Group 2 | 142,967,188.96 | 16.58% | 4,813,875.69 | 3.37% | 138,153,313.27 | 390,444,946.22 | 49.16% | 7,041,532.76 | 1.80% | 383,403,413.46 |
| **Total** | **862,299,076.10** | **100.00%** | **17,309,708.82** | **2.01%** | **844,989,367.28** | **794,138,254.61** | **100.00%** | **13,940,120.01** | **1.76%** | **780,198,134.60** |
## (d) Changes in bad debt provisions
| Item | Phase 1: Expected credit losses within 12 months (December 31, 2025) | Phase 2: Expected credit losses during the whole life (no credit impairment occurred) (December 31, 2025) | Phase 3: Expected credit losses during the whole life (credit impairment occurred) (December 31, 2025) | Total (December 31, 2025) |
| :--- | :--- | :--- | :--- | :--- |
| **1. Bad debt provisions** | | | | |
| Opening balance (restated) | 1,215,426.11 | 12,374,693.90 | 350,000.00 | 13,940,120.01 |
| – Transferred to phase 2 | (1,032,104.06) | 1,032,104.06 | – | – |
| Provisions for the year | 412,349.47 | 7,263,722.38 | – | 7,676,071.85 |
| Recovered or reversed during the year | (182,364.60) | (4,109,574.04) | – | (4,291,938.64) |
| Exchange differences arising on translation of financial statements | (988.43) | (13,555.97) | – | (14,544.40) |
| Closing balance | 412,318.49 | 16,547,390.33 | 350,000.00 | 17,309,708.82 |
| **2. Closing balance of other receivables** | **137,439,499.88** | **724,509,576.22** | **350,000.00** | **862,299,076.10** |
| **3. Provisions percentage of bad debts** | **0.30%** | **2.28%** | **100.00%** | **2.01%** |
---
### (e) Top five debtors with the largest closing balances
| Name of entity | Nature | Amount | Aging | Percentage to total other receivables | Closing balance of provisions for bad debts |
| :--- | :--- | :--- | :--- | :--- | :--- |
| People’s Government of Huidong County | Payments | 372,071,375.00 | 4 to 5 years | 43.15% | 7,159,258.99 |
| Lufeng Municipal People’s Government | Payments | 331,733,746.00 | 1 to 2 years | 38.47% | 4,639,545.14 |
| Fuding Land Reserve Center | Payments | 48,828,484.71 | Within 1 year | 5.66% | 146,045.89 |
| Zhaoyuan City Natural Resources and Planning Bureau | Guarantee deposit | 36,250,000.00 | Within 1 year | 4.20% | 108,750.00 |
| China Construction Eighth Engineering Bureau Ltd. | Payments | 8,678,854.18 | Within 1 year | 1.01% | 26,036.57 |
| **Total** | | **797,562,459.89** | | **92.49%** | **12,079,636.59** |
# 6. Inventories
## (1) Inventories by category
| Item | December 31, 2025 Carrying balance | December 31, 2025 Provision for decline in value | December 31, 2025 Carrying value | December 31, 2024 (Restated) Carrying balance | December 31, 2024 (Restated) Provision for decline in value | December 31, 2024 (Restated) Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Nuclear fuel | 11,947,501,843.81 | - | 11,947,501,843.81 | 10,946,494,687.86 | - | 10,946,494,687.86 |
| Spare parts | 9,604,244,133.32 | 750,787,519.33 | 8,853,456,613.99 | 8,661,554,986.50 | 765,684,231.07 | 7,895,870,755.43 |
| Consigned processing materials | 1,527,171,380.20 | - | 1,527,171,380.20 | 1,499,832,991.57 | - | 1,499,832,991.57 |
| Raw materials | 93,761,711.62 | - | 93,761,711.62 | 7,961,266.35 | - | 7,961,266.35 |
| Goods on hand | - | - | - | 4,078.94 | - | 4,078.94 |
| **Total** | **23,172,679,068.95** | **750,787,519.33** | **22,421,891,549.62** | **21,115,848,011.22** | **765,684,231.07** | **20,350,163,780.15** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Provision for decline in value of inventories
| Inventory category | January 1, 2025 | Additions during the year: Provision | Additions during the year: Write-backs | Deductions during the year: Write-offs | Deductions during the year: Exchange differences arising on translation of financial statements | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Spare parts | 765,684,231.07 | 12,355,834.94 | 2,608,873.31 | 18,698,056.97 | 5,945,616.40 | 750,787,519.33 |
## (3) Description of the inventory balance containing the capitalized borrowing costs
One-third of the initial nuclear fuelling costs is recognized in the inventory, and is included in the production cost by installments at the period between the initial fuelling and the next refuelling based on the on-grid power generation. As at December 31, 2025, the initial nuclear fuelling costs in the Group's inventory did not include capitalized borrowing cost (December 31, 2024: RMB12,079,066.56). The amount of capitalized borrowing costs in the closing inventory is the balance of the borrowing costs that meet the capitalization conditions incurred before the initial nuclear fuelling reaches its intended use minus the amount of the borrowing costs included in the production cost in installments along with the initial nuclear fuelling.
# 7. Contract assets
## (1) Contract assets
| Item | December 31, 2025: Carrying balance | December 31, 2025: Bad debt provisions | December 31, 2025: Carrying value | December 31, 2024 (Restated): Carrying balance | December 31, 2024 (Restated): Bad debt provisions | December 31, 2024 (Restated): Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Completed but unsettled assets resulting from construction contracts | 2,762,026,737.26 | 405,846,377.87 | 2,356,180,359.39 | 3,152,269,184.35 | 406,986,770.81 | 2,745,282,413.54 |
| Guarantee deposits | 12,155,460.09 | 638,569.66 | 11,516,890.43 | 10,503,600.67 | 373,529.22 | 10,130,071.45 |
| **Total** | **2,774,182,197.35** | **406,484,947.53** | **2,367,697,249.82** | **3,162,772,785.02** | **407,360,300.03** | **2,755,412,484.99** |
## (2) Contract assets disclosed by category
| Item | Dec 31, 2025: Carrying balance Amount | Dec 31, 2025: Carrying balance Percentage | Dec 31, 2025: Bad debt provisions Amount | Dec 31, 2025: Bad debt provisions percentage | Dec 31, 2025: Carrying value | Dec 31, 2024 (Restated): Carrying balance Amount | Dec 31, 2024 (Restated): Carrying balance Percentage | Dec 31, 2024 (Restated): Bad debt provisions Amount | Dec 31, 2024 (Restated): Bad debt provisions percentage | Dec 31, 2024 (Restated): Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Mengzi Zhongneng New Energy Co., Ltd. (蒙自中能新能源有限公司) | 1,261,026,985.39 | 45.46% | 401,405,739.86 | 31.83% | 859,621,245.53 | 1,289,328,872.18 | 40.77% | 401,405,739.86 | 31.13% | 887,923,132.32 |
| Others | 1,513,155,211.96 | 54.54% | 5,079,207.67 | 0.34% | 1,508,076,004.29 | 1,873,443,912.84 | 59.23% | 5,954,560.17 | 0.32% | 1,867,489,352.67 |
| **Total** | **2,774,182,197.35** | **100.00%** | **406,484,947.53** | **14.65%** | **2,367,697,249.82** | **3,162,772,785.02** | **100.00%** | **407,360,300.03** | **12.88%** | **2,755,412,484.99** |
---
### (3) Bad debt provision made for contract assets for the year
| Item | Opening balance (Restated) | Provisions for the year | Reversal for the year | Closing balance |
| :--- | :--- | :--- | :--- | :--- |
| Completed but unsettled assets resulting from construction contracts | 406,986,770.81 | 2,956,586.74 | (4,096,979.68) | 405,846,377.87 |
| Guarantee deposits | 373,529.22 | 278,626.98 | (13,586.54) | 638,569.66 |
| **Total** | **407,360,300.03** | **3,235,213.72** | **(4,110,566.22)** | **406,484,947.53** |
### (4) Qualitative analysis of contract assets
The amount associated with construction contracts is CGN Engineering’s right to consideration in exchange for construction services that it has transferred to customers when that right is conditional on something other than the passage of time. The Group firstly recognizes the completed construction as a contract asset and reclassifies the recognized contract assets to accounts receivable upon obtaining the right to unconditionally collect the consideration of contracts from the customer.
## 8. Other current assets
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| VAT input tax credit | 2,867,135,305.92 | 2,253,956,380.60 |
| Others | 50,900,653.59 | 47,372,066.89 |
| **Total** | **2,918,035,959.51** | **2,301,328,447.49** |
## 9. Debt investments
| Item | December 31, 2025 Carrying balance | December 31, 2025 Impairment provision | December 31, 2025 Carrying value | December 31, 2024 Carrying balance | December 31, 2024 Impairment provision | December 31, 2024 Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Others | 59,785,414.49 | – | 59,785,414.49 | 59,767,538.42 | – | 59,767,538.42 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 10. Long-term equity investments
| Investee | Balance at January 1, 2025 | Changes in the current year - Additional Investment | Changes in the current year - Reduced Investment | Changes in the current year - Investment gains/ losses recognized under the equity method | Changes in the current year - Adjustment of other comprehensive income | Changes in the current year - Changes in other equity | Changes in the current year - Declared cash dividends or profits | Changes in the current year - Impairment provision | Changes in the current year - Others | Balance at December 31, 2025 | Closing balance of impairment provisions |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **Joint venture** | | | | | | | | | | | |
| Fujian Ningde Second Nuclear Power Co., Ltd. (福建寧德第二核電有限公司) ("Ningde Second Nuclear") | 821,381,427.23 | 650,503,038.46 | - | (3,770,011.31) | - | - | - | - | - | 1,468,114,454.38 | - |
| **Associates** | | | | | | | | | | | |
| Liaoning Hongyanhe Nuclear Power Co., Ltd. (遼寧紅沿河核電有限公司) ("Hongyanhe Nuclear") | 7,900,278,819.54 | - | - | 1,576,203,945.83 | - | - | (969,024,242.38) | - | - | 8,507,458,522.99 | - |
| CGN Fund Phase I | 3,682,670,237.16 | - | - | 456,311,406.73 | - | 1,529,169.17 | (487,562,872.00) | - | - | 3,652,947,941.06 | - |
| China Nuclear Industry Second and Third Construction Co., Ltd. (中國核工業二三建設有限公司) | 943,499,894.57 | - | - | 102,481,919.32 | (934,144.52) | 172,889,808.69 | (45,081,167.48) | - | - | 1,172,856,310.58 | - |
| CGN Finance Co., Ltd. (中廣核財務有限責任公司) ("CGN Finance") | 2,034,078,879.22 | - | - | 136,160,151.21 | 1,335,180.00 | - | (106,981,984.09) | - | - | 2,064,592,226.34 | - |
| CIECC Engineering Company Limited (中諮工程有限公司) | 41,692,652.39 | - | - | 4,953,765.93 | - | - | - | - | - | 46,646,418.32 | - |
| Xiong'an Xingrong Nuclear Power Innovation Center Co., Ltd. (雄安興融核電創新中心有限公司) | 20,128,592.85 | - | - | 17,698.80 | - | - | - | - | - | 20,146,291.65 | - |
| Huizhou Zhongdong Energy Storage and Power Generation Co., Ltd. (惠州中洞蓄能發電有限公司) | 192,727,166.00 | 300,000,000.00 | - | 228,291.67 | - | 5,416,200.00 | - | - | - | 498,371,657.67 | - |
| **Total** | 15,636,457,668.96 | 950,503,038.46 | - | 2,272,587,168.18 | 401,035.48 | 179,835,177.86 | (1,608,650,265.95) | - | - | 17,431,133,822.99 | - |
---
# 11. Other investment in equity instruments
## (1) Other investment in equity instruments
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Chinergy Co., Ltd. (中核能源科技有限公司) | 110,000,000.00 | 110,000,000.00 |
| China Nuclear Industry Huaxing Construction Co., Ltd. (中國核工業華興建設有限公司) | 696,969,300.00 | 529,649,700.00 |
| Fujian Power Exchange Center Co., Ltd. (福建電力交易中心有限公司) | 10,960,113.30 | 10,960,113.30 |
| Guangxi Power Exchange Center Co., Ltd. (廣西電力交易中心有限責任公司) | 2,607,256.83 | 2,607,256.83 |
| Gansu Solar Thermal Power Generation Co., Ltd. (甘肅光熱發電有限公司) | 8,500,000.00 | 8,500,000.00 |
| **Total** | **829,036,670.13** | **661,717,070.13** |
## (2) Investment in other equity instruments measured at fair value
| Item | Reason for designated as at FVTOCI | Dividend income recognized for the year | Accumulated gains included in other comprehensive income | Amount of other comprehensive income transferred to the retained earnings | Reason for other comprehensive income transferred to the retained earnings |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Chinergy Co., Ltd. (中核能源科技有限公司) | Not intended to hold for recent sale or short-term profit | – | – | – | – |
| China Nuclear Industry Huaxing Construction Co., Ltd. (中國核工業華興建設有限公司) | Not intended to hold for recent sale or short-term profit | 40,497,454.26 | 313,270,750.00 | – | – |
| Fujian Power Exchange Center Co., Ltd. (福建電力交易中心有限公司) | Not intended to hold for recent sale or short-term profit | – | – | – | – |
| Guangxi Power Exchange Center Co., Ltd. (廣西電力交易中心有限責任公司) | Not intended to hold for recent sale or short-term profit | – | – | – | – |
| Gansu Solar Thermal Power Generation Co., Ltd. (甘肅光熱發電有限公司) | Not intended to hold for recent sale or short-term profit | – | – | – | – |
| **Total** | | **40,497,454.26** | **313,270,750.00** | **–** | **–** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 12. Investment properties
### (1) Investment properties measured at cost
| Item | Buildings and structures |
| :--- | :--- |
| **2025** | |
| I. Original carrying value | |
| 1. Opening balance (restated) | 532,804,823.00 |
| 2. Additions during the year | - |
| 3. Deductions during the year | 12,410,786.18 |
| (1) Disposal | 12,181,152.51 |
| (2) Exchange differences arising on translation of financial statements | 229,633.67 |
| 4. Closing balance | 520,394,036.82 |
| II. Accumulated depreciation and accumulated amortization | |
| 1. Opening balance (restated) | 407,140,798.58 |
| 2. Additions during the year | 9,209,511.91 |
| (1) Provisions | 9,209,511.91 |
| 3. Deductions during the year | 3,730,841.30 |
| (1) Disposal | 3,581,701.38 |
| (2) Exchange differences arising on translation of financial statements | 149,139.92 |
| 4. Closing balance | 412,619,469.19 |
| III. Impairment provision | |
| 1. Opening balance | - |
| 2. Additions during the year | - |
| 3. Deductions during the year | - |
| 4. Closing balance | - |
| IV. Carrying value | |
| 1. Closing carrying value | 107,774,567.63 |
| 2. Opening carrying value (restated) | 125,664,024.42 |
---
# (2) Undiscounted future lease receipts from investment properties after the balance sheet date
| Maturity analysis of undiscounted operating future lease receipts | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| The first year after the balance sheet date | 33,401,777.13 | 32,228,585.27 |
| The second year after the balance sheet date | 30,199,598.16 | 32,489,722.11 |
| The third year after the balance sheet date | 22,241,372.00 | 30,903,047.59 |
| The fourth year after the balance sheet date | 20,883,016.82 | 22,135,631.25 |
| The fifth year after the balance sheet date | 21,485,446.39 | 21,084,125.39 |
| After the sixth year after the balance sheet date | 92,245,303.12 | 113,831,303.79 |
| **Total** | **220,456,513.62** | **252,672,415.40** |
# 13. Fixed assets
## (1) Fixed assets
| Item | Buildings and structures | Machinery and equipment | Transportation vehicles | Electronic equipment and office facilities | Cost of NPP decommissioning | Vessels | Total |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **2025** | | | | | | | |
| I. Original carrying value | | | | | | | |
| 1. Opening balance (restated) | 85,016,460,153.56 | 297,885,012,189.51 | 190,431,401.03 | 4,066,993,276.90 | 2,971,813,108.74 | 420,686,049.15 | 390,551,396,178.89 |
| 2. Additions during the year | 795,684,132.50 | 1,006,029,185.87 | 20,550,124.94 | 649,387,041.27 | - | 3,864,077.67 | 2,475,514,562.25 |
| (1) Acquisition | 138,082,029.09 | 642,970,913.56 | 20,550,124.94 | 514,326,523.00 | - | 3,864,077.67 | 1,319,793,668.26 |
| (2) Transfer from construction in progress | 657,602,103.41 | 363,058,272.31 | - | 135,060,518.27 | - | - | 1,155,720,893.99 |
| 3. Deductions during the year | 267,151,936.80 | 911,969,074.20 | 19,962,444.27 | 287,866,037.69 | 4,184,330.82 | - | 1,491,133,823.78 |
| (1) Disposal | 141,000,961.68 | 344,132,735.32 | 19,738,290.36 | 286,065,919.69 | - | - | 790,937,907.05 |
| (2) Exchange differences arising on translation of financial statements | 126,150,975.12 | 567,836,338.88 | 224,153.91 | 1,800,118.00 | 4,184,330.82 | - | 700,195,916.73 |
| 4. Closing balance | 85,544,992,349.26 | 297,979,072,301.18 | 191,019,081.70 | 4,428,514,280.48 | 2,967,628,777.92 | 424,550,126.82 | 391,535,776,917.36 |
| II. Accumulated depreciation | | | | | | | |
| 1. Opening balance (restated) | 25,141,723,133.06 | 98,555,383,623.34 | 153,068,923.56 | 2,764,778,711.51 | 731,603,029.63 | 90,570,293.47 | 127,437,127,714.57 |
| 2. Additions during the year | 2,551,726,588.54 | 9,628,136,021.47 | 11,023,287.38 | 387,947,552.66 | 97,725,006.55 | 16,139,924.79 | 12,692,698,381.39 |
| (1) Provisions | 2,551,726,588.54 | 9,628,136,021.47 | 11,023,287.38 | 387,947,552.66 | 97,725,006.55 | 16,139,924.79 | 12,692,698,381.39 |
| 3. Deductions during the year | 163,389,001.78 | 698,887,520.38 | 18,666,227.57 | 208,128,566.53 | 3,406,628.43 | - | 1,092,477,944.69 |
| (1) Disposal | 50,666,824.57 | 209,978,376.55 | 18,500,012.74 | 206,703,060.31 | - | - | 485,848,274.17 |
| (2) Exchange differences arising on translation of financial statements | 112,722,177.21 | 488,909,143.83 | 166,214.83 | 1,425,506.22 | 3,406,628.43 | - | 606,629,670.52 |
| 4. Closing balance | 27,530,060,719.82 | 107,484,632,124.43 | 145,425,983.37 | 2,944,597,697.64 | 825,921,407.75 | 106,710,218.26 | 139,037,348,151.27 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
| Item | Buildings and structures | Machinery and equipment | Transportation vehicles | Electronic equipment and office facilities | Cost of NPP decommissioning | Vessels | Total |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **III. Impairment provision** | | | | | | | |
| 1. Opening balance | 1,452,141.69 | 64,010,935.91 | - | - | - | - | 65,463,077.60 |
| 2. Additions during the year | - | - | - | - | - | - | - |
| 3. Deductions during the year | - | 64,933.59 | - | - | - | - | 64,933.59 |
| (1) Exchange differences arising on translation of financial statements | - | 64,933.59 | - | - | - | - | 64,933.59 |
| 4. Closing balance | 1,452,141.69 | 63,946,002.32 | - | - | - | - | 65,398,144.01 |
| **IV. Carrying value** | | | | | | | |
| 1. Closing carrying value | 58,013,479,487.75 | 190,430,494,174.43 | 45,593,098.33 | 1,483,916,582.84 | 2,141,707,370.17 | 317,839,908.56 | 252,433,030,622.08 |
| 2. Opening carrying value (restated) | 59,873,284,878.81 | 199,265,617,630.26 | 37,362,477.47 | 1,302,214,565.39 | 2,240,210,079.11 | 330,115,755.68 | 263,048,805,386.72 |
** (2) As at December 31, 2025 and December 31, 2024, the Group had no idle fixed assets.**
## (3) Fixed assets under operating leases are as follows:
| Item | Buildings and structures | Machinery and equipment | Vessels | Total |
| :--- | :--- | :--- | :--- | :--- |
| **2025** | | | | |
| **I. Original carrying value** | | | | |
| 1. Opening balance | 94,872,068.29 | 2,354,494.64 | 420,686,049.15 | 517,912,612.08 |
| 2. Additions during the year | 10,639,122.72 | - | 3,864,077.67 | 14,503,200.39 |
| 3. Deductions during the year | 5,645,845.88 | - | - | 5,645,845.88 |
| 4. Closing balance | 99,865,345.13 | 2,354,494.64 | 424,550,126.82 | 526,769,966.59 |
| **II. Accumulated depreciation** | | | | |
| 1. Opening balance | 49,052,557.41 | 2,236,769.90 | 90,570,293.47 | 141,859,620.78 |
| 2. Additions during the year | 7,532,115.48 | - | 16,139,924.79 | 23,672,040.27 |
| (1) Provisions | 7,532,115.48 | - | 16,139,924.79 | 23,672,040.27 |
| 3. Deductions during the year | 4,312,184.27 | - | - | 4,312,184.27 |
| 4. Closing balance | 52,272,488.62 | 2,236,769.90 | 106,710,218.26 | 161,219,476.78 |
| **III. Impairment provision** | | | | |
| 1. Opening balance | - | - | - | - |
| 2. Additions during the year | - | - | - | - |
| 3. Deductions during the year | - | - | - | - |
| 4. Closing balance | - | - | - | - |
| **IV. Carrying value** | | | | |
| 1. Closing carrying value | 47,592,856.51 | 117,724.74 | 317,839,908.56 | 365,550,489.81 |
| 2. Opening carrying value | 45,819,510.88 | 117,724.74 | 330,115,755.68 | 376,052,991.30 |
---
(4) As at December 31, 2025 and December 31, 2024, the carrying values of the properties held by the Group for which the application of title certificates was still in progress amounted to RMB1,992,796,800.73 and RMB4,325,689,856.56 (restated), respectively. The Group believed that the ongoing application for the above title certificates will not affect the use of the properties.
## 14. Construction in progress
### (1) Construction in progress
| Name of project | December 31, 2025 Carrying balance | December 31, 2025 Impairment provision | December 31, 2025 Carrying value | December 31, 2024 (Restated) Carrying balance | December 31, 2024 (Restated) Impairment provision | December 31, 2024 (Restated) Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Taipingling Nuclear Project | 48,503,453,458.77 | – | 48,503,453,458.77 | 39,047,254,773.71 | – | 39,047,254,773.71 |
| Lufeng Nuclear Project | 47,890,468,166.19 | – | 47,890,468,166.19 | 35,929,581,092.88 | – | 35,929,581,092.88 |
| Zhaoyuan Nuclear Phase I Project | 5,299,908,755.54 | – | 5,299,908,755.54 | 2,454,926,395.21 | – | 2,454,926,395.21 |
| Fangchenggang Nuclear Phase III Project | 3,216,137,855.67 | – | 3,216,137,855.67 | 1,627,296,860.48 | – | 1,627,296,860.48 |
| Others | 9,020,942,448.07 | – | 9,020,942,448.07 | 5,992,446,535.29 | – | 5,992,446,535.29 |
| **Total** | **113,930,910,684.24** | **–** | **113,930,910,684.24** | **85,051,505,657.57** | **–** | **85,051,505,657.57** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Changes in major construction in progress
| Name of project | Budget amount | January 1, 2025 | Additions during the year | Transfer to fixed assets | Other deductions | December 31, 2025 | Proportion of investment to budget | Project progress | Accumulated capitalized interest | Including: capitalized interest for the year | Including: Ratio of capitalized interest for the year | Sources of fund |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Taipingling Nuclear Phase I (Note 1) | 40,719,240,000.00 | 35,606,433,479.91 | 6,863,516,663.50 | 13,063,262.40 | - | 42,456,886,881.01 | 95.52% | 95.52% | 3,468,876,472.23 | 810,087,672.89 | 2.23% | Self-owned funds, loans |
| Taipingling Nuclear Phase II (Note 1) | 38,057,840,000.00 | 3,440,821,293.80 | 2,621,078,770.20 | 15,333,486.24 | - | 6,046,566,577.76 | 22.54% | 22.54% | 242,381,738.67 | 153,997,812.71 | 1.88% | Self-owned funds, loans |
| Lufeng Nuclear Phase I (Note 2) | 41,384,460,000.00 | 23,452,190,817.66 | 3,601,852,085.52 | 137,932,741.83 | 285,600,300.89 | 26,630,509,860.46 | 63.37% | 63.37% | 5,704,370,622.36 | 430,787,502.56 | 2.09% | Self-owned funds, loans |
| Lufeng Nuclear Power Station Unit 5 and Unit 6 Project (Note 2) | 38,217,430,000.00 | 12,477,390,205.22 | 8,902,861,371.64 | 120,293,341.13 | - | 21,259,958,235.73 | 53.82% | 53.82% | 806,538,721.53 | 367,498,192.73 | 2.09% | Self-owned funds, loans |
| Zhaoyuan Nuclear Phase I Project (Note 3) | 45,779,210,000.00 | 2,454,926,395.21 | 2,844,982,360.33 | - | - | 5,299,908,755.54 | 16.52% | 16.52% | 191,912,287.62 | 105,057,562.46 | 2.48% | Self-owned funds, loans |
| Fangchenggang Nuclear Phase III Project (Note 4) | N/A | 1,627,296,860.48 | 1,588,840,995.19 | - | - | 3,216,137,855.67 | N/A | 8.56% | 70,399,313.88 | 33,453,422.42 | 1.96% | Self-owned funds, loans |
| **Total** | | **79,059,059,122.28** | **26,423,132,246.38** | **286,622,831.60** | **285,600,300.89** | **104,909,968,236.17** | | | **10,484,479,156.29** | **1,900,882,165.77** | | |
**Note 1:** The Taipingling Nuclear Phase I Project was approved by the State Council in January 2019, obtained the "Permit for the Operation of Guangdong Taipingling Nuclear Power Plant Unit 1" in December 2025. As of December 31, 2025, both Unit 1 and Unit 2 were in the commissioning phase. The Taipingling Nuclear Phase II Project was approved by the State Council in December 2023, obtained the "Permit for the Construction of Guangdong Taipingling Nuclear Power Plant Unit 3" and the "Permit for the Construction of Guangdong Taipingling Nuclear Power Plant Unit 4" in June 2025, and has successively entered the construction stage. As of December 31, 2025, Unit 3 was in the civil construction phase, and Unit 4 was in the FCD preparation phase.
**Note 2:** Unit 1 and Unit 2 of the Lufeng Nuclear Phase I Project were approved by the State Council in August 2024, and obtained the "Permit for the Construction of Guangdong Lufeng Nuclear Power Plant Unit 1" and the "Permit for the Construction of Guangdong Lufeng Nuclear Power Plant Unit 2" in February 2025. As of December 31, 2025, both Unit 1 and Unit 2 entered the construction stage. The Lufeng Nuclear Power Station Unit 5 and Unit 6 Project was approved by the State Council in April 2022, obtained the "Permit for the Construction of Guangdong Lufeng Unit 5" and the "Permit for the Construction of Guangdong Lufeng Unit 6" in September 2022, and has successively entered the construction stage. As of December 31, 2025, both Unit 5 and Unit 6 entered the equipment installation phase.
**Note 3:** The Zhaoyuan Nuclear Phase I Project was approved by the State Council in August 2024, obtained the "Permit for the Construction of Shandong Zhaoyuan Nuclear Power Plant Unit 1" and the "Permit for the Construction of Shandong Zhaoyuan Nuclear Power Plant Unit 2" in November 2025, and has successively entered the construction stage. As of December 31, 2025, Unit 1 was in the civil construction phase, and Unit 2 was in the FCD preparation phase.
**Note 4:** Fangchenggang Nuclear Phase III Project was approved by the State Council in April 2025. Currently, preparatory work for construction of the units is being carried out in an orderly manner.
---
# 15. Right-of-use assets
## (1) Right-of-use assets
| Item | Buildings and structures | Machinery and equipment | Total |
| :--- | :--- | :--- | :--- |
| **2025** | | | |
| **I. Original carrying value** | | | |
| 1. Opening balance (restated) | 2,495,752,533.07 | 667,642.91 | 2,496,420,175.98 |
| 2. Additions during the year | 199,775,041.19 | – | 199,775,041.19 |
| (1) Additions | 199,775,041.19 | – | 199,775,041.19 |
| 3. Deductions during the year | 494,870,299.12 | – | 494,870,299.12 |
| (1) Deductions due to termination of contracts | 494,418,943.07 | – | 494,418,943.07 |
| (2) Exchange differences arising on translation of financial statements | 451,356.05 | – | 451,356.05 |
| 4. Closing balance | 2,200,657,275.14 | 667,642.91 | 2,201,324,918.05 |
| **II. Accumulated depreciation** | | | |
| 1. Opening balance (restated) | 1,266,140,354.05 | 140,803.68 | 1,266,281,157.73 |
| 2. Additions during the year | 319,281,356.71 | 146,732.58 | 319,428,089.29 |
| (1) Provisions | 319,281,356.71 | 146,732.58 | 319,428,089.29 |
| 3. Deductions during the year | 479,927,355.85 | – | 479,927,355.85 |
| (1) Deductions due to termination of contracts | 479,565,275.99 | – | 479,565,275.99 |
| (2) Exchange differences arising on translation of financial statements | 362,079.86 | – | 362,079.86 |
| 4. Closing balance | 1,105,494,354.91 | 287,536.26 | 1,105,781,891.17 |
| **III. Impairment provision** | | | |
| 1. Opening balance | – | – | – |
| 2. Additions during the year | – | – | – |
| 3. Deductions during the year | – | – | – |
| 4. Closing balance | – | – | – |
| **IV. Carrying value** | | | |
| 1. Closing carrying value | 1,095,162,920.23 | 380,106.65 | 1,095,543,026.88 |
| 2. Opening carrying value (restated) | 1,229,612,179.02 | 526,839.23 | 1,230,139,018.25 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Amounts recognized in profit or loss
| Buildings and structures, machinery and equipment | 2025 | 2024 |
| :--- | :--- | :--- |
| Depreciation expenses of right-of-use assets (Note 1) | 310,611,737.53 | 297,835,767.42 |
| Interest expenses on the lease liabilities (Note 2) | 38,156,038.89 | 29,894,806.37 |
**Note 1:** In 2025, the capitalized depreciation expense of right-of-use assets amounted to RMB8,816,351.76 (2024: RMB2,220,509.95 (restated)).
**Note 2:** In 2025, the capitalized interest expense on the lease liabilities amounted to RMB1,014,341.28 (2024: RMB225,386.89 (restated)).
## (3) For the specific arrangements for leasing activities of the Group, please refer to Note (V) 65.
# 16. Intangible assets
## (1) Intangible assets
**2025**
| Item | Land use rights | Computer software | Patent rights | Non-patented technology | Sea area use rights | Others | Total |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **I. Original carrying value** | | | | | | | |
| 1. Opening balance (restated) | 5,931,061,048.20 | 3,091,992,686.78 | 1,426,562,083.10 | 1,399,665,867.68 | 338,116,303.26 | 88,114,126.18 | 12,275,512,115.20 |
| 2. Additions during the year | 1,437,013,285.31 | 410,333,226.40 | 61,820,476.70 | 873,888,513.87 | - | - | 2,783,055,502.28 |
| (1) Acquisition | 869,126,978.95 | 113,774,640.05 | 66,320.75 | 28,502,810.88 | - | - | 1,011,470,750.63 |
| (2) Transfer from construction in progress | 567,886,306.36 | 50,143,607.09 | - | 19,826,126.28 | - | - | 637,856,039.73 |
| (3) Transfer from development costs | - | 246,414,979.26 | 61,754,155.95 | 825,559,576.71 | - | - | 1,133,728,711.92 |
| 3. Deductions during the year | 51,454,505.05 | 37,702,772.98 | - | 5,011,567.65 | 62,571,685.49 | - | 156,740,531.17 |
| (1) Disposal or retirement | 42,707,382.21 | 31,667,872.70 | - | 4,689,896.44 | 62,571,685.49 | - | 141,636,836.84 |
| (2) Effect of translation of financial statements | 8,747,122.84 | 6,034,900.28 | - | 321,671.21 | - | - | 15,103,694.33 |
| 4. Closing balance | 7,316,619,828.46 | 3,464,623,140.20 | 1,488,382,559.80 | 2,268,542,813.90 | 275,544,617.77 | 88,114,126.18 | 14,901,827,086.31 |
| **II. Accumulated amortization** | | | | | | | |
| 1. Opening balance (restated) | 1,524,500,691.88 | 2,561,401,402.69 | 846,555,808.84 | 577,473,480.94 | 58,729,184.22 | 44,212,073.56 | 5,612,872,642.13 |
| 2. Additions during the year | 154,739,146.27 | 306,893,120.94 | 106,812,876.54 | 158,868,063.02 | 7,727,811.78 | 1,712,506.92 | 736,753,525.47 |
| (1) Provisions | 154,739,146.27 | 306,893,120.94 | 106,812,876.54 | 158,868,063.02 | 7,727,811.78 | 1,712,506.92 | 736,753,525.47 |
| 3. Deductions during the year | 20,080,496.93 | 33,128,153.59 | - | 4,760,454.10 | 14,268,038.05 | - | 72,237,142.67 |
| (1) Disposal or retirement | 12,836,968.07 | 28,174,724.62 | - | 4,689,896.44 | 14,268,038.05 | - | 59,969,627.18 |
| (2) Effect of translation of financial statements | 7,243,528.86 | 4,953,428.97 | - | 70,557.66 | - | - | 12,267,515.49 |
| 4. Closing balance | 1,659,159,341.22 | 2,835,166,370.04 | 953,368,685.38 | 731,581,089.86 | 52,188,957.95 | 45,924,580.48 | 6,277,389,024.93 |
---
| Item | Land use rights | Computer software | Patent rights | Non-patented technology | Sea area use rights | Others | Total |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **III. Impairment provision** | | | | | | | |
| 1. Opening balance | — | — | — | — | — | — | — |
| 2. Additions during the year | — | — | — | — | — | — | — |
| 3. Deductions during the year | — | — | — | — | — | — | — |
| 4. Closing balance | — | — | — | — | — | — | — |
| **IV. Carrying value** | | | | | | | |
| 1. Closing carrying value | 5,657,460,487.24 | 629,456,770.16 | 535,013,874.42 | 1,536,961,724.04 | 223,355,659.82 | 42,189,545.70 | 8,624,438,061.38 |
| 2. Opening carrying value (restated) | 4,406,560,356.32 | 530,591,284.09 | 580,006,274.26 | 822,192,386.74 | 279,387,119.04 | 43,902,052.62 | 6,662,639,473.07 |
As at December 31, 2025 and December 31, 2024, the Group’s intangible assets from internal R&D accounted for 30.45% and 27.72% (restated) of the carrying value of intangible assets, respectively.
## (2) Right-of-use assets without proper title certificates
As at December 31, 2025 and December 31, 2024, the Group had no right-of-use assets without proper title certificates.
# 17. Goodwill
## (1) Goodwill
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :---: | :---: |
| Original carrying value | | |
| Ningde Nuclear | 419,242,673.32 | 419,242,673.32 |
| Impairment provision | — | — |
| **Total** | **419,242,673.32** | **419,242,673.32** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Impairment provision for goodwill
As at December 31, 2025, the Group assessed the recoverable amount of Ningde Nuclear’s goodwill and determined that the Group’s acquisition of Ningde Nuclear related goodwill had no impairment occurred.
### a. Information related to the asset group or asset group combination where goodwill belongs to
The Group conducted impairment tests with Ningde Nuclear as a whole asset group. There was no change in the asset group or asset group combination during the year.
### b. Specific method for determining recoverable amount
The recoverable amount is determined based on the present value of expected future cash flows.
| Item | Carrying value | Recoverable amount | Impairment | Years of forecast | Key parameters for the forecast period | Basis for determining parameters for the forecast period |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Ningde Nuclear | 37,008,224,100.92 | 40,258,772,009.91 | - | 2026 to 2056 | Discount rate at 8.95% | Financial budget prepared by management based on market expectations |
## 18. Long-term deferred expenses
| Item | January 1, 2025 | Increase during the year | Amortization for the year | Decrease during the year - Exchange differences arising on translation of financial statements | Decrease during the year - Other decrease | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Nuclear power production preparation staff training fee (Note 1) | 1,443,744,399.78 | 174,988,514.52 | - | - | 1,301,237,632.38 | 317,495,281.92 |
| Emergency passages (Note 2) | 229,908,848.80 | - | 29,537,674.36 | - | - | 200,371,174.44 |
| Others | 118,782,821.83 | 79,236,705.64 | 25,329,977.28 | 225,886.73 | - | 172,463,663.46 |
| **Total** | **1,792,436,070.41** | **254,225,220.16** | **54,867,651.64** | **225,886.73** | **1,301,237,632.38** | **690,330,119.82** |
**Note 1:** The expenses incurred during the training of nuclear power production preparation staff shall be accounted as long-term deferred expenses of the Group, and shall be amortized according to the remaining working years as stipulated in the labor contract or training agreement from the conclusion of the training, and recognized in the profit or loss for the period.
**Note 2:** The emergency passages were constructed under funding by Ling’ao Nuclear, Lingdong Nuclear, Yangjiang Nuclear, Fangchenggang Nuclear and Ningde Nuclear. It was accounted as long-term deferred expenses by the Group, amortized based on the estimated useful life from the date of completion and recognized in the profit or loss for the period.
---
# 19. Deferred tax assets/deferred tax liabilities
## (1) Deferred tax assets and deferred tax liabilities
| Item | December 31, 2025 Deductible or taxable temporary differences | December 31, 2025 Deferred tax assets/liabilities | December 31, 2024 (Restated) Deductible or taxable temporary differences | December 31, 2024 (Restated) Deferred tax assets/liabilities |
| :--- | :--- | :--- | :--- | :--- |
| **Deferred tax assets:** | | | | |
| Unrealized profit arising from internal transactions | 10,182,767,091.44 | 2,545,691,772.86 | 9,515,759,036.10 | 2,375,487,423.15 |
| Asset impairment provisions | 1,205,933,555.16 | 199,339,549.89 | 1,232,253,477.05 | 203,945,902.26 |
| Lease liabilities | 1,011,169,413.24 | 205,605,585.32 | 1,131,943,968.10 | 231,292,945.14 |
| Deferred income | 313,665,790.61 | 47,049,868.59 | 350,254,000.80 | 52,538,100.12 |
| Expected credit losses | 109,818,380.06 | 17,254,989.22 | 150,297,408.20 | 23,453,358.32 |
| Others | 1,097,535,404.42 | 164,876,088.43 | 1,049,255,018.34 | 158,717,387.91 |
| **Subtotal** | 13,920,889,634.93 | 3,179,817,854.31 | 13,429,762,908.59 | 3,045,435,116.90 |
| Offsetting amount | (2,033,762,273.99) | (366,188,242.95) | (1,908,358,626.19) | (343,927,538.10) |
| Offsetting balance | 11,887,127,360.94 | 2,813,629,611.36 | 11,521,404,282.40 | 2,701,507,578.80 |
| **Deferred tax liabilities:** | | | | |
| Depreciation of fixed assets | 6,807,359,808.36 | 1,640,218,904.37 | 6,190,893,745.65 | 1,478,494,267.99 |
| Right-of-use assets | 979,689,339.00 | 197,359,799.87 | 1,113,368,387.13 | 227,927,846.59 |
| Revaluation gain of assets for business combinations involving entities not under common control | 425,363,021.36 | 106,340,755.34 | 453,026,518.08 | 113,256,629.52 |
| Others | 383,918,730.72 | 64,652,607.68 | 175,638,771.03 | 26,345,815.66 |
| **Subtotal** | 8,596,330,899.44 | 2,008,572,067.26 | 7,932,927,421.89 | 1,846,024,559.76 |
| Offsetting amount | (2,033,762,273.99) | (366,188,242.95) | (1,908,358,626.19) | (343,927,538.10) |
| Offsetting balance | 6,562,568,625.45 | 1,642,383,824.31 | 6,024,568,795.70 | 1,502,097,021.66 |
## (2) Unrecognized deferred tax assets
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Deductible temporary differences | 479,235,657.98 | 531,856,436.53 |
| Deductible losses | 10,028,971,591.60 | 9,614,784,006.80 |
| **Total** | 10,508,207,249.58 | 10,146,640,443.33 |
**Note:** As it is uncertain for the Company and certain subsidiaries to obtain sufficient taxable income in the future, the above deductible temporary differences and deductible losses are not recognized as deferred tax assets.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
### (3) Maturity of deductible losses that are not recognized as deferred tax assets
| Year | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| 2025 | – | 854,074,621.87 |
| 2026 | 1,430,470,078.03 | 1,524,631,687.60 |
| 2027 | 3,028,088,196.28 | 3,036,918,344.04 |
| 2028 | 2,940,511,151.45 | 2,795,752,213.63 |
| 2029 | 1,192,528,400.10 | 1,403,407,139.66 |
| 2030 and beyond | 1,437,373,765.74 | – |
| **Total** | **10,028,971,591.60** | **9,614,784,006.80** |
## 20. Other non-current assets
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| VAT input tax credit | 8,503,647,922.15 | 6,949,963,464.73 |
| Prepayment for engineering equipment | 12,226,427,455.07 | 6,873,394,391.81 |
| Others | 240,806,925.27 | 261,555,691.96 |
| **Total** | **20,970,882,302.49** | **14,084,913,548.50** |
## 21. Short-term loans
### (1) Short-term loans by category
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Credit loans | 42,030,303,256.37 | 17,722,599,882.97 |
| Pledged loans (Note) | 100,000,000.00 | – |
| Short-term loans interest payable | 20,816,693.56 | 12,148,700.46 |
| **Total** | **42,151,119,949.93** | **17,734,748,583.43** |
**Note:** Fangchenggang Nuclear obtained the short-term loans by pledging its patent rights, the initial cost of which has been recognized in profit or loss.
### (2) As at December 31, 2025 and December 31, 2024, the Group had no overdue and unsettled short-term loans.
## 22. Derivative financial liabilities
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Foreign currency forward contracts | – | 6,322,000.00 |
---
# 23. Bills payable
## Bills payable by category
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Bank acceptance bills | 6,686,401,730.25 | 6,664,549,111.26 |
As at December 31, 2025 and December 31, 2024, the Group had no overdue and unsettled bills payable.
# 24. Accounts payable
## Aging of accounts payable
| Aging | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Within 1 year | 13,482,529,323.03 | 14,700,794,716.88 |
| 1 to 2 years | 3,763,124,511.61 | 2,715,935,672.94 |
| 2 to 3 years | 1,297,580,402.12 | 1,515,564,148.34 |
| More than 3 years | 1,693,366,882.86 | 1,668,560,126.50 |
| Total | 20,236,601,119.62 | 20,600,854,664.66 |
The aging analysis is counted from the date when accounts payable are recognized.
# 25. Contract liabilities
## (1) Contract liabilities
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Settled payments of uncompleted construction, installation and design service contracts | 6,334,937,458.43 | 5,457,765,558.74 |
| Payments of sales, technical services and construction, installation and design services received in advance | 60,231,238.50 | 125,554,700.31 |
| Total | 6,395,168,696.93 | 5,583,320,259.05 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Qualitative analysis of contract liabilities
The contract liabilities associated with the construction, installation and design service contracts are the balances generated when a specific milestone payment exceeds the revenue recognized as a result of the performance. The related revenue will be recognized after the Group fulfills the performance obligations.
For revenue on goods sold, it is recognized when the control right of the product is transferred to the customer. When the customer purchases a product and prepays to the Group, the Group recognizes the transaction price received as the contract liabilities until the control right of the product is transferred to the customer.
Revenue generated from rendering of services is recognized over a period of time. The Group recognizes the contract liabilities when it initially receives the service payment and transfers it to revenue during the service period.
# 26. Employee benefits payable
## (1) Employee benefits payable
| Item | January 1, 2025 (Restated) | Increase during the year | Decrease during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| I. Short-term employee benefits payable | 45,817,910.55 | 11,272,341,806.00 | 11,265,060,312.82 | 53,099,403.73 |
| II. Post-employment benefits – defined contribution plan | 11,556,461.35 | 1,629,615,987.68 | 1,632,646,078.68 | 8,526,370.35 |
| **Total** | **57,374,371.90** | **12,901,957,793.68** | **12,897,706,391.50** | **61,625,774.08** |
## (2) Short-term employee benefits
| Item | January 1, 2025 (Restated) | Increase during the year | Decrease during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| 1. Salaries, bonuses, allowances and subsidies | — | 8,248,300,151.59 | 8,248,300,151.59 | — |
| 2. Staff welfare | — | 1,113,409,055.42 | 1,113,409,055.42 | — |
| 3. Social insurance premiums | 1,130,044.77 | 730,272,013.73 | 730,430,764.20 | 971,294.30 |
| Including: Medical insurance | 701,319.37 | 667,363,761.13 | 667,531,851.11 | 533,229.39 |
| Work-related injury insurance | 3,870.99 | 38,764,230.39 | 38,764,496.37 | 3,605.01 |
| Maternity insurance | 424,854.41 | 23,956,020.01 | 23,946,414.52 | 434,459.90 |
| Others | — | 188,002.20 | 188,002.20 | — |
| 4. Housing provident funds | 16,027.96 | 823,436,786.80 | 823,436,701.80 | 16,112.96 |
| 5. Labor union expenditures and employees' education expenses | 44,648,475.05 | 318,065,922.60 | 310,625,763.95 | 52,088,633.70 |
| 6. Other short-term employee benefits | 23,362.77 | 38,857,875.86 | 38,857,875.86 | 23,362.77 |
| **Total** | **45,817,910.55** | **11,272,341,806.00** | **11,265,060,312.82** | **53,099,403.73** |
---
## (3) Post-employment benefits – defined contribution plan
| Item | January 1, 2025 | Increase during the year | Decrease during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| 1. Basic pension insurance | 8,558,070.38 | 927,209,993.16 | 927,357,705.61 | 8,410,357.93 |
| 2. Unemployment insurance | 81,604.88 | 45,646,257.36 | 45,656,373.43 | 71,488.81 |
| 3. Corporate annuity contribution | 2,916,786.09 | 656,759,737.16 | 659,631,999.64 | 44,523.61 |
| **Total** | **11,556,461.35** | **1,629,615,987.68** | **1,632,646,078.68** | **8,526,370.35** |
The Group participates in pension insurance and unemployment insurance schemes established by the government as required, pursuant to which, the Group contributes a stipulated proportion to pension insurance and unemployment insurance schemes respectively. In addition, according to the Group’s corporate annuity management system, the Group is required to pay the corporate annuity contribution which is a fixed proportion to the Company’s annual salary standard of previous year. Other than the above, the Group has no further payment responsibility. The corresponding expenses are recognized in profit or loss for the period or the cost of related assets when incurred.
# 27. Taxes payable
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| VAT | 715,507,866.12 | 931,163,105.70 |
| Enterprise income tax | 494,047,239.87 | 754,179,767.00 |
| Individual income tax | 197,980,969.43 | 156,559,620.27 |
| Urban maintenance and construction tax | 39,027,440.47 | 43,501,682.78 |
| Education surcharges | 28,473,808.68 | 31,115,290.94 |
| Stamp duty | 15,015,303.61 | 8,547,181.48 |
| Real estate tax | 5,778,519.27 | 5,577,520.13 |
| Others | 18,393,303.79 | 13,087,489.27 |
| **Total** | **1,514,224,451.24** | **1,943,731,657.57** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 28. Other payables
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Dividends payable | - | 718,840,000.00 |
| Other payables | 9,551,632,550.49 | 5,230,546,815.58 |
| **Total** | **9,551,632,550.49** | **5,949,386,815.58** |
### (1) Dividends payable
| Name of entity | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Hong Kong Nuclear Investment Co., Ltd. (香港核電投資有限公司) | - | 718,840,000.00 |
Note: As at December 31, 2025, the Group had no dividends payable for more than 1 year (December 31, 2024: nil).
### (2) Other payables
**Other payables by nature**
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Spent fuel management fund | 4,372,064,803.64 | 4,063,386,731.80 |
| Equity investment payments received in advance | 4,200,000,000.00 | - |
| Related party payments | 302,717,546.93 | 363,339,283.79 |
| Others | 676,850,199.92 | 803,820,799.99 |
| **Total** | **9,551,632,550.49** | **5,230,546,815.58** |
---
# 29. Non-current liabilities due within one year
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Long-term loans due within one year (Note (V)31) | 29,943,070,866.12 | 17,879,098,541.29 |
| Long-term loans interest payable | 688,695,922.02 | 696,701,342.06 |
| Lease liabilities due within one year (Note (V)33) | 288,666,938.64 | 290,437,869.59 |
| Bonds payable due within one year (Note (V)32) | – | 2,499,661,151.77 |
| Bonds payable interests payable | 57,845,302.40 | 76,555,795.55 |
| Post-employment benefit scheme liabilities due within one year (Note (V)34) | 4,290,490.31 | 4,369,496.57 |
| **Total** | **30,982,569,519.49** | **21,446,824,196.83** |
# 30. Other current liabilities
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Short-term bonds payable (1) | – | 2,522,489,178.08 |
| Pending output tax | 181,728,109.55 | 190,027,395.39 |
| **Total** | **181,728,109.55** | **2,712,516,573.47** |
## (1) Changes in short-term bonds payable:
| Name of bonds | Face value | Coupon rate | Issue date | Term | Issue amount | Opening balance | Issue during the year | Accrued interest based on the face value | Amortization of premiums or discounts | Repayment during the year | Closing balance | Defaulted or not |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| 24 CGN Power SCP002 | 1,500,000,000.00 | 1.79% | June 11, 2024 | 268 days | 1,500,000,000.00 | 1,514,933,013.70 | – | 4,781,506.85 | – | 1,519,714,520.55 | – | No |
| 24 CGN Power SCP003 | 1,000,000,000.00 | 1.97% | August 13, 2024 | 268 days | 1,000,000,000.00 | 1,007,556,164.38 | – | 6,908,493.15 | – | 1,014,464,657.53 | – | No |
| **Total** | **2,500,000,000.00** | | | | **2,500,000,000.00** | **2,522,489,178.08** | **–** | **11,690,000.00** | **–** | **2,534,179,178.08** | **–** | |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 31. Long-term loans
### Long-term loans by category
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Credit loans | 167,275,827,943.45 | 138,854,810,845.79 |
| Pledged loans (Note 1) | 52,870,633,862.82 | 71,023,506,233.61 |
| Less: Long-term loans due within one year (Note (V)29) | 29,943,070,866.12 | 17,879,098,541.29 |
| **Total** | **190,203,390,940.15** | **191,999,218,538.11** |
Notes for classification of long-term loans:
**Note 1:** Pledged loans are secured by the Group's interests under sales agreements of electricity, insurance contracts and the equity interest held. As at December 31, 2025, GNIC, Taishan Nuclear Power Industry Investment Co., Ltd. ("Taishan Investment") and the Company pledged their equity interests in Taishan Nuclear to obtain such long-term loans. For details of other pledges of the aforesaid pledged loans of the Group, please refer to Note (V) 63.
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Range of annual interest rates of the above loans (Note 2) | 0.74% – 5.15% | 0.51% – 5.15% |
**Note 2:** 0.74% and 0.51% were the government subsidized interest rates for Fangchenggang Nuclear.
## 32. Bonds payable
### (1) Bonds payable
| Category | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Medium-term notes (Note 1) | 4,797,317,681.96 | 4,896,465,160.74 |
| Convertible corporate bonds (3) | 4,869,080,176.20 | – |
| Less: Bonds payable due within one year (Note (V)29) | – | 2,499,661,151.77 |
| **Total** | **9,666,397,858.16** | **2,396,804,008.97** |
**Note 1:** The Group issued 22 CGN Power MTN001, 24 CGN Power MTN001 and 25 CGN Power MTN001 on February 21, 2022, September 13, 2024 and February 28, 2025, respectively. These medium-term notes, with nominal values amounting to RMB2,500,000,000.00, RMB2,400,000,000.00 and RMB2,400,000,000.00, respectively, became due and payable in February 2025 and will be due and payable in September 2027 and March 2028, respectively. Among which, 22 CGN Power MTN001 has been due and paid in February 2025.
---
# (2) Changes in bonds payable
| Name of bonds | Face value | Coupon rate | Issue date | Term | Issue amount | January 1, 2025 | Issue during the year | Accrued interest based on the face value | Amortization of premiums or discounts | Repayment during the year | Conversion during the year | December 31, 2025 | Defaulted or not |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| 22 CGN Power MTN001 | 2,500,000,000.00 | 2.93% | February 21, 2022 | 3 years | 2,500,000,000.00 | 2,499,661,151.77 | - | 10,836,986.30 | 338,848.23 | 2,500,000,000.00 | N/A | - | No |
| 24 CGN Power MTN001 | 2,400,000,000.00 | 1.99% | September 13, 2024 | 3 years | 2,400,000,000.00 | 2,396,804,008.97 | - | 47,760,000.00 | 1,563,751.43 | - | N/A | 2,398,367,760.40 | No |
| 25 CGN Power MTN001 | 2,400,000,000.00 | 1.97% | February 28, 2025 | 3 years | 2,400,000,000.00 | - | 2,398,560,000.00 | 39,378,410.96 | 389,921.56 | - | N/A | 2,398,949,921.56 | No |
| CGN Convertible Bond (3) | 4,900,000,000.00 | 0.20% - 2.00% | July 9, 2025 | 6 years | 4,900,000,000.00 | - | 4,828,261,988.68 | 4,725,479.45 | 40,818,187.52 | - | - | 4,869,080,176.20 | No |
| **Subtotal** | 12,200,000,000.00 | | | | 12,200,000,000.00 | 4,896,465,160.74 | 7,226,821,988.68 | 102,700,876.71 | 43,110,708.74 | 2,500,000,000.00 | | 9,666,397,858.16 | |
| Less: Bonds payable due within one year | | | | | | 2,499,661,151.77 | | | | | | - | |
| **Total** | | | | | | 2,396,804,008.97 | | | | | | 9,666,397,858.16 | |
# (3) Conditions and period for the conversion of convertible corporate bonds
The Company issued 49,000,000 convertible corporate bonds with a nominal value of RMB100 each to non-specific investors in July 2025 in accordance with the Approval on the Registration for the Issuance of Convertible Corporate Bonds to Non-specific Investors by CGN Power Co., Ltd. (Zheng Jian Xu Ke [2025] No. 479) issued by the CSRC. The total proceeds amounted to RMB4,900,000,000.00. After deducting various issuance expenses of RMB2,158,142.52 (excluding VAT), the net proceeds amounted to RMB4,897,841,857.48. These A-share convertible corporate bonds have been listed and traded on the Shenzhen Stock Exchange on July 25, 2025, under the bond abbreviation of “CGN Convertible Bond” and the bond code of “127110”.
According to the Prospectus for the Issuance of A Share Convertible Corporate Bonds to Non-Specific Investors and Listing on the Main Board by the Company, the initial conversion price of these A-share convertible corporate bonds is RMB3.67 per share. The coupon rate of these A-share convertible corporate bonds is 0.20% for the first year, 0.40% for the second year, 0.80% for the third year, 1.20% for the fourth year, 1.60% for the fifth year and 2.00% for the sixth year.
The conversion period of these A-share convertible corporate bonds commenced on the first trading day immediately following the expiry of the six-month period (i.e., January 15, 2026) after the date of the issuance of these A-share convertible corporate bonds (i.e., July 15, 2025), and will end on the maturity date of these A-share convertible corporate bonds (i.e., July 8, 2031).
In 2025, the Company recognized RMB52,207,895.90 in other equity instruments due to the issuance of convertible corporate bonds.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 33. Lease liabilities
### (1) Lease liabilities
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Lease liabilities | 1,045,357,221.36 | 1,147,224,227.66 |
| Less: Lease liabilities due within one year (Note (V)29) | 288,666,938.64 | 290,437,869.59 |
| **Total** | **756,690,282.72** | **856,786,358.07** |
### (2) Term of lease liabilities
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Within 1 year | 288,666,938.64 | 290,437,869.59 |
| 1 to 2 years (including 2 years) | 198,952,556.09 | 192,708,568.38 |
| 2 to 5 years (including 5 years) | 326,754,824.33 | 355,243,959.53 |
| More than 5 years | 230,982,902.30 | 308,833,830.16 |
| **Total** | **1,045,357,221.36** | **1,147,224,227.66** |
### (3) For the specific arrangements for leasing activities of the Group, please refer to Note (V) 65.
## 34. Long-term employee benefits payable
### (1) Long-term employee benefits payable
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Post-employment benefits – net liabilities of defined benefit plan | 48,566,490.31 | 53,120,496.57 |
| Less: Post-employment benefit scheme liabilities due within one year (Note (V)29) | 4,290,490.31 | 4,369,496.57 |
| **Total** | **44,276,000.00** | **48,751,000.00** |
---
# (2) Changes in defined benefit plan
The present value of obligations under the defined benefit plan:
| Item | 2025 |
| :--- | :--- |
| I. Opening balance | 53,120,496.57 |
| II. Defined benefit cost included in profit or loss | 1,542,000.00 |
| 1. Past service cost | 587,000.00 |
| 2. Net interest | 955,000.00 |
| III. Defined benefit cost included in other comprehensive income | (1,056,000.00) |
| 1. Actuarial losses | (1,056,000.00) |
| IV. Other changes | (5,040,006.26) |
| 1. Paid benefits | (5,040,006.26) |
| V. Closing balance | 48,566,490.31 |
The Group applies the following discount rate and growth rate actuarial assumptions for the above results of the defined benefit plan:
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| **Discount rate** | | |
| Retirement benefit plan | 1.77% | 1.62% |
| **Growth rate** | | |
| Retirement benefit plan | 2.60% | 2.60% |
The defined benefit plan usually exposes the Group to interest rate risk and longevity risk:
**Interest rate risk:** Rising discount rate will lead to a reduction in planned liabilities;
**Longevity risk:** As at December 31, 2025 and December 31, 2024, the life table used in the defined benefit plan is the experience life table of the pension business in China's life insurance industry (CL (2010-2013)).
**Other explanation:**
The Group provides supplementary retirement benefit plans for some resigned and retired employees. According to the plan, the supplementary retirement benefits paid by the Group include nursing recuperation fees, holiday fees, travel expenses, medical examination and vaccination fees and annually paid supplementary medical insurance in accordance with policies, and the benefits will be paid until their death.
The Group engaged China Life Pension Company Limited to estimate the present value of the retirement benefit plan obligations above in an actuarial manner based on the expected cumulative welfare unit method. The plan estimates future cash outflows based on inflation and mortality assumptions and determines its present value at a discount rate.
The discount rate is determined according to the government bond market yield rate corresponding to the planned duration on the balance sheet date and the evaluation date of the defined benefit plan obligation and currency. The Group recognizes its liabilities based on the actuarial results. The relevant actuarial gains or losses are recognized in other comprehensive income and will not be reversed to profit or loss in subsequent accounting periods. Past service costs are recognized through profit or loss for the current period in which the plan is revised. The net interest is determined by multiplying the defined benefit plan net liabilities or net assets by the appropriate discount rate.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 35. Provisions
| Item | December 31, 2025 | December 31, 2024 | Reason |
| :--- | :--- | :--- | :--- |
| Provision for NPP decommissioning | 6,565,980,452.62 | 6,361,183,648.74 | Note 1 |
| Provision for low and medium level radioactive waste disposals | 935,541,487.31 | 633,234,003.68 | Note 2 |
| **Total** | **7,501,521,532.93** | **6,994,417,652.42** | |
Note 1: It is the discounted value of the best estimate of the expected cost of the NPP decommissioning of the Group.
Note 2: It is the best estimate of the expected disposal cost of low and medium level radioactive waste generated by NPPs.
## 36. Deferred income
| Item | January 1, 2025 | Increase during the year | Decrease during the year: Amortization for the year | Decrease during the year: Other deductions | Exchange differences arising on translation of financial statements | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Government grants | 2,089,726,062.19 | 226,851,544.24 | 444,203,117.56 | 679,274.77 | 6,720,182.46 | 1,864,975,031.64 |
### (1) Items related to government grants
| Item | January 1, 2025 | Increase in grants during the year | Decrease during the year: Amount recognized in other gains for the year | Decrease during the year: Other deductions | Exchange differences arising on translation of financial statements | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Government grants related to asset | 1,689,736,674.13 | 127,273,040.83 | 296,286,913.35 | 529,274.77 | 6,720,182.46 | 1,513,473,344.38 |
| Government grants related to income | 399,989,388.06 | 99,578,503.41 | 147,916,204.21 | 150,000.00 | – | 351,501,687.26 |
| **Total** | **2,089,726,062.19** | **226,851,544.24** | **444,203,117.56** | **679,274.77** | **6,720,182.46** | **1,864,975,031.64** |
---
## (2) Details
| Item | January 1, 2025 | Increase in grants during the year | Decrease: Amount recognized in other gains for the year | Decrease: Other deductions | Decrease: Exchange differences arising on translation of financial statements | December 31, 2025 | Related to asset/related to income |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| CNPRI Project 1 | 615,503,333.33 | - | 95,085,328.38 | - | - | 520,418,004.95 | Related to asset |
| GNPJVC Project 1 | 334,058,345.74 | - | 46,800,612.82 | - | 6,720,182.46 | 280,537,550.46 | Related to asset |
| CGN Engineering Project 1 | 207,093,750.00 | - | 11,045,000.00 | - | - | 196,048,750.00 | Related to asset |
| CNPRI Project 2 | 56,696,000.00 | - | 17,924,000.00 | - | - | 38,772,000.00 | Related to asset |
| Taishan Nuclear Project 1 | 61,397,359.36 | 391,050.00 | 3,298,166.54 | - | - | 58,490,242.82 | Related to asset |
| CNPRI Project 3 | 62,427,800.00 | - | 62,033,595.00 | - | - | 394,205.00 | Related to asset |
| CNPRI Project 4 | 42,273,000.00 | - | 23,485,000.00 | - | - | 18,788,000.00 | Related to asset |
| CNPRI Project 5 | - | 75,750,000.00 | - | - | - | 75,750,000.00 | Related to asset |
| Other government grants related to asset | 310,287,085.70 | 51,131,990.83 | 36,615,210.61 | 529,274.77 | - | 324,274,591.15 | Related to asset |
| Other government grants related to income | 399,989,388.06 | 99,578,503.41 | 147,916,204.21 | 150,000.00 | - | 351,501,687.26 | Related to income |
| **Total** | **2,089,726,062.19** | **226,851,544.24** | **444,203,117.56** | **679,274.77** | **6,720,182.46** | **1,864,975,031.64** | |
# 37. Share capital
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| **Unrestricted shares** | | |
| **Domestic shares (A shares)** | **39,334,986,100** | **39,334,986,100** |
| Including: CGNPC | 29,176,641,375 | 29,176,641,375 |
| Guangdong Hengjian Investment Holdings Co., Ltd. (廣東恒健投資控股有限公司) | 3,428,512,500 | 3,428,512,500 |
| Other domestic shares | 6,729,832,225 | 6,729,832,225 |
| **Overseas listed foreign shares (H shares)** | **11,163,625,000** | **11,163,625,000** |
| Including: CGNPC | 560,235,000 | 560,235,000 |
| Other foreign shares | 10,603,390,000 | 10,603,390,000 |
| **Total** | **50,498,611,100** | **50,498,611,100** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 38. Other equity instruments
### (1) Outstanding convertible corporate bonds at the end of the year:
| Outstanding financial instruments | Issue date | Accounting item | Interest rate | Issue price | Quantity | Amount | Maturity date or renewal conditions | Conversion status |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| CGN Convertible Bond | July 9, 2025 | Other equity instruments | 0.20% – 2.00% | 100.00 | 49,000,000.00 | 52,207,895.90 | July 8, 2031 | Conversion not yet started |
### (2) Changes in outstanding convertible corporate bonds at the end of the year:
| Outstanding financial instruments | Beginning of the year Quantity | Beginning of the year Carrying value | Increase during the year Quantity | Increase during the year Carrying value | Decrease during the year Quantity | Decrease during the year Carrying value | End of the year Quantity | End of the year Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| CGN Convertible Bond | – | – | 49,000,000.00 | 52,207,895.90 | – | – | 49,000,000.00 | 52,207,895.90 |
**Note:** For details of the issuance and conditions for the conversion of convertible corporate bonds, please refer to Note (V) 32(3).
---
# 39. Capital reserve
| Item | January 1, 2025 (Restated) | Increase during the year | Decrease during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| Share premium | 42,125,417,410.30 | 1,381,750,000.00 | 11,961,058,100.00 | 31,546,109,310.30 |
| – Share capital contributed by owners | 36,594,105,123.18 | – | – | 36,594,105,123.18 |
| – Business combination involving enterprises under common control (Note 1) | 5,230,154,999.79 | 1,381,750,000.00 | 11,961,058,100.00 | (5,349,153,100.21) |
| – Others | 301,157,287.33 | – | – | 301,157,287.33 |
| Restructuring valuation adjustment | (27,701,479,836.62) | – | – | (27,701,479,836.62) |
| Other capital reserve | 5,659,535,501.59 | 179,835,177.86 | – | 5,839,370,679.45 |
| **Total** | **20,083,473,075.27** | **1,561,585,177.86** | **11,961,058,100.00** | **9,684,000,153.13** |
**Note 1:** On January 20, 2025, the Company conducted business combination involving enterprises under common control with Taishan Second Nuclear. The Group consolidated the relevant assets and liabilities of Taishan Second Nuclear at the beginning of the year into the consolidated balance sheet of the Group at the beginning of the year. The increase in net assets resulting from the combination resulted in the increase in share premium in capital reserve at the beginning of the year. The Company paid CGNPC a consideration of RMB1,203,875,600.00 for the combination during the year. The consideration paid by the Group resulted in the decrease in share premium in capital reserve. See Note (VII) 1 for details.
On October 31, 2025, the Company conducted business combination involving enterprises under common control with CGN Huizhou Nuclear Power Co., Ltd. (中廣核惠州核電有限公司) (“Huizhou Nuclear”). The Group consolidated the relevant assets and liabilities of Huizhou Nuclear at the beginning of the year into the consolidated balance sheet of the Group at the beginning of the year. The increase in net assets resulting from the combination resulted in the increase in share premium in capital reserve at the beginning of the year. From the beginning of the year to the combination date, the increase in net assets due to the capital increase of RMB514,750,000.00 in cash by the former controlling shareholder, CGNPC, in Huizhou Nuclear resulted in the increase in the share premium in capital reserve for the year. The Company paid CGNPC a consideration of RMB8,537,452,100.00 for the combination during the year. The consideration paid by the Group resulted in the decrease in share premium in capital reserve. See Note (VII) 1 for details.
On October 31, 2025, the Company conducted business combination involving enterprises under common control with CGN Huizhou Second Nuclear Power Co., Ltd. (中廣核惠州第二核電有限公司) (“Huizhou Second Nuclear”). The Group consolidated the relevant assets and liabilities of Huizhou Second Nuclear at the beginning of the year into the consolidated balance sheet of the Group at the beginning of the year. The increase in net assets resulting from the combination resulted in the increase in share premium in capital reserve at the beginning of the year. From the beginning of the year to the combination date, the increase in net assets due to the capital increase of RMB767,000,000.00 in cash by the former controlling shareholder, CGNPC, in Huizhou Second Nuclear resulted in the increase in the share premium in capital reserve for the year. The Company paid CGNPC a consideration of RMB2,119,730,400.00 for the combination during the year. The consideration paid by the Group resulted in the decrease in share premium in capital reserve. See Note (VII) 1 for details.
On October 31, 2025, the Company conducted business combination involving enterprises under common control with CGN Huizhou Third Nuclear Power Co., Ltd. (中廣核惠州第三核電有限公司) (“Huizhou Third Nuclear”) which was established on February 16, 2025. From the date of establishment to the combination date, the increase in net assets due to the capital increase of RMB100,000,000.00 in cash by the former controlling shareholder, CGNPC, in Huizhou Third Nuclear resulted in the increase in the share premium in capital reserve for the year. The Company paid CGNPC a consideration of RMB100,000,000.00 for the combination during the year. The consideration paid by the Group resulted in the decrease in share premium in capital reserve. See Note (VII) 1 for details.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 40. Other comprehensive income
| Item | Balance as at January 1, 2025 | Amount incurred for the year: Incurred amount before income tax for the year | Amount incurred for the year: Less: Income tax expenses | Amount incurred for the year: Attributable to the shareholders of parent company, after-tax | Amount incurred for the year: Attributable to minority shareholders, after-tax | Balance as at December 31, 2025 |
| :--- | :---: | :---: | :---: | :---: | :---: | :---: |
| I. Other comprehensive income that will not be reclassified to profit or loss | 136,749,769.55 | 139,089,014.52 | 20,644,796.85 | 118,411,092.67 | 33,125.00 | 255,160,862.22 |
| 1. Change arising from remeasurement of defined benefit plan | (13,652,816.11) | 1,056,000.00 | — | 1,022,875.00 | 33,125.00 | (12,629,941.11) |
| 2. Other comprehensive income that cannot be transferred to profit or loss under the equity method | 1,109,630.35 | 401,035.48 | — | 401,035.48 | — | 1,510,665.83 |
| 3. Change in fair value of investment in other equity instruments | 149,292,955.31 | 137,631,979.04 | 20,644,796.85 | 116,987,182.19 | — | 266,280,137.50 |
| II. Other comprehensive income that may be reclassified to profit or loss | 738,402,228.50 | (166,421,993.02) | — | (124,816,494.77) | (41,605,498.25) | 613,585,733.73 |
| 1. Other comprehensive income that can be transferred to profit or loss under the equity method | (1,833,126.35) | — | — | — | — | (1,833,126.35) |
| 2. Translation differences arising from translation of foreign currency financial statements | 740,235,354.85 | (166,421,993.02) | — | (124,816,494.77) | (41,605,498.25) | 615,418,860.08 |
| **Total other comprehensive income** | **875,151,998.05** | **(27,332,978.50)** | **20,644,796.85** | **(6,405,402.10)** | **(41,572,373.25)** | **868,746,595.95** |
---
## 41. Specific reserve
| Item | January 1, 2025 | Increase during the year | Decrease during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| Safe production expenses | 48,899,762.39 | 630,869,388.17 | 646,364,063.71 | 33,405,086.85 |
## 42. Surplus reserve
| Item | January 1, 2025 | Transfer to surplus reserve during the year | Decrease during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| Statutory surplus reserves | 6,933,033,957.19 | 1,670,429,703.68 | — | 8,603,463,660.87 |
## 43. Retained earnings
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Unadjusted retained earnings at the beginning of the year | 50,241,553,089.92 | 44,432,050,938.38 |
| Adjusted for business combination involving enterprises under common control | (95,592,326.52) | (119,839,524.13) |
| Adjusted retained earnings at the beginning of the year | 50,145,960,763.40 | 44,312,211,414.25 |
| Add: Net profit attributable to shareholders of the parent company for the year | 9,765,358,959.88 | 10,838,120,422.43 |
| Less: Appropriation of statutory surplus reserves | 1,670,429,703.68 | 255,916,333.06 |
| Distributable profits for shareholders | 58,240,890,019.60 | 54,894,415,503.62 |
| Less: Profits payable (Note 1) | 4,792,850,439.19 | 4,748,454,740.22 |
| Retained earnings at the end of the year (Note 2) | 53,448,039,580.41 | 50,145,960,763.40 |
**Note 1:** On May 21, 2025, a profit distribution plan was considered and approved at the general meeting of the Company, which proposed to distribute cash dividends of RMB0.095 (tax inclusive) per share based on total shares of 50,498,611,100 shares to all shareholders in order to distribute cash dividends from the accumulated retained earnings for 2024 of equivalent to RMB4,792,850,439.19 to shareholders. As at December 31, 2025, the dividends above were paid.
**Note 2:** As at December 31, 2025 and December 31, 2024, the balance of retained earnings of the Group included the surplus reserves used by subsidiaries which were RMB14,731,293,202.36 and RMB13,366,476,393.97, respectively.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 44. Operating revenue and operating costs
| Item | 2025 Revenue | 2025 Cost | 2024 (Restated) Revenue | 2024 (Restated) Cost |
| :--- | :--- | :--- | :--- | :--- |
| From principal operations | 75,478,992,351.45 | 51,329,591,846.59 | 78,756,472,169.48 | 49,250,853,631.55 |
| Of which: Sales of electricity | 61,757,114,162.94 | 38,602,099,902.82 | 65,932,311,940.69 | 37,186,346,041.11 |
| Construction, installation and design services | 11,341,026,494.18 | 11,091,718,680.16 | 10,838,605,511.19 | 10,668,229,629.60 |
| Rendering of services | 1,429,207,611.82 | 906,191,957.92 | 1,329,358,815.24 | 911,711,832.62 |
| Sales of goods and others | 951,644,082.51 | 729,581,305.69 | 656,195,902.36 | 484,566,128.22 |
| From other operations | 217,566,622.08 | 149,371,881.27 | 188,197,453.57 | 144,982,449.41 |
| **Total** | **75,696,558,973.53** | **51,478,963,727.86** | **78,944,669,623.05** | **49,395,836,080.96** |
(1) For the details of operating revenue, please refer to Note (XIV) 1 (2).
(2) As at December 31, 2025, the transaction price attributable to outstanding (or partially outstanding) performance obligation and the estimated time of revenue recognition:
| Item | 2026 | 2027 | 2028 | After January 1, 2029 | Total |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Construction, installation and design services | 10,638,936,463.65 | 11,789,691,118.78 | 12,024,453,674.04 | 12,240,893,840.18 | 46,693,975,096.65 |
| Rendering of services | 32,442,621.57 | 21,617,688.67 | 15,519,575.47 | 11,208,768.05 | 80,788,653.76 |
| Sales of goods and others | 37,173,428.07 | 5,354,315.52 | – | 7,966,133.05 | 50,493,876.64 |
| **Total** | **10,708,552,513.29** | **11,816,663,122.97** | **12,039,973,249.51** | **12,260,068,741.28** | **46,825,257,627.05** |
(3) As at December 31, 2025, there was no significant variable consideration in the transaction price of the Group.
## 45. Tax and surcharges
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Urban maintenance and construction tax | 350,321,885.45 | 382,664,243.23 |
| Education surcharges | 259,260,328.30 | 276,488,816.75 |
| Real estate tax | 198,691,842.35 | 188,269,291.30 |
| Stamp duty | 82,321,787.93 | 64,411,629.69 |
| Others | 11,251,161.98 | 3,240,287.71 |
| **Total** | **901,847,006.01** | **915,074,268.68** |
---
# 46. Selling expenses
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Employees' remuneration | 15,541,398.41 | 25,161,057.29 |
| Others | 20,974,865.61 | 22,293,229.35 |
| **Total** | **36,516,264.02** | **47,454,286.64** |
# 47. Administrative expenses
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Employees' remuneration | 1,248,884,883.48 | 1,164,733,038.58 |
| Depreciation and amortization | 697,130,396.99 | 562,879,775.81 |
| Information technology expenses | 122,946,187.52 | 174,079,414.22 |
| Logistics service expenses | 234,528,310.13 | 200,391,012.00 |
| Labor technical service fees | 225,154,582.32 | 217,468,126.78 |
| Professional service consulting fees | 15,765,646.61 | 14,791,358.77 |
| Office expenses | 37,542,503.02 | 32,214,028.10 |
| Travelling expenses | 49,581,519.93 | 51,467,383.14 |
| Other expenses | 230,357,978.23 | 261,022,850.90 |
| **Total** | **2,861,892,008.23** | **2,679,046,988.30** |
# 48. Research and development expenses
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Commissioning fees paid for R&D outsourcing, cooperation and others | 573,439,240.71 | 642,571,095.40 |
| Employees' remuneration | 782,709,270.23 | 710,299,587.11 |
| Inspection expenses | 88,602,401.22 | 146,626,057.29 |
| Depreciation and amortization | 77,240,813.77 | 268,098,470.81 |
| Others | 394,911,745.49 | 675,290,746.49 |
| **Total** | **1,916,903,471.42** | **2,442,885,957.10** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 49. Finance costs
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Interest expenses | 6,331,132,081.19 | 6,866,360,669.55 |
| Less: Capitalized interest expenses | 1,926,441,533.06 | 1,740,781,299.32 |
| Less: Interest income | 211,486,979.20 | 267,959,998.72 |
| Exchange gains, net | (86,111,761.23) | (186,443,999.62) |
| Less: Capitalized exchange gains | (2,281,453.87) | (39,437,709.76) |
| Finance costs on the provision for NPP decommissioning | 358,897,638.56 | 369,217,689.80 |
| Interest expenses on the lease liabilities | 38,156,038.89 | 29,894,806.37 |
| Bank charges and others | 16,995,073.39 | 23,565,413.43 |
| **Total** | **4,523,422,012.41** | **5,133,290,991.25** |
## 50. Other gains
| Item | 2025 | Including: amount included in non-recurring gains or losses for the year | 2024 | Including: amount included in non-recurring gains or losses for the year |
| :--- | :--- | :--- | :--- | :--- |
| VAT refunds (Note) | 1,560,657,486.27 | – | 1,417,993,766.73 | – |
| Other government grants | 469,912,280.33 | 469,912,280.33 | 267,890,403.76 | 267,890,403.76 |
| Others | 10,961,146.11 | – | 10,310,924.93 | – |
| **Total** | **2,041,530,912.71** | **469,912,280.33** | **1,696,195,095.42** | **267,890,403.76** |
**Note**: For the VAT refunds received by the Group’s subsidiaries that satisfied the preferential VAT “levy first, refund later” policy, the Group adopted the VAT “levy first, refund later” policy in respect of its sales of electricity generated by Lingdong Nuclear, Yangjiang Nuclear, Ningde Nuclear, Fangchenggang Nuclear and Taishan Nuclear to grid companies. For details, please see Note (IV) 2.
## 51. Investment income
### Details of investment income
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Income from long-term equity investments accounted for using the equity method | 2,263,089,556.14 | 1,835,884,747.88 |
| Investment income from disposal of long-term equity investments | – | 59,733,003.83 |
| Investment income from disposal of derivative financial instruments | 48,752,792.10 | 226,875.85 |
| Dividend income from investment in other equity instruments | 40,497,454.26 | 36,167,474.55 |
| Others | 805,662.46 | 878,736.82 |
| **Total** | **2,353,145,464.96** | **1,932,890,838.93** |
---
# 52. Gains/(losses) from changes in fair value
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Gains/(losses) from changes in fair value arising from derivative financial instruments | 6,322,000.00 | (6,322,000.00) |
# 53. Reversals of credit impairment
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Bad debts reversals of accounts receivable | 34,973,059.80 | 153,112,099.14 |
| Bad debts reversals of other receivables | 1,369,945.00 | 12,021,584.09 |
| Bad debt reversals of/(losses from) from dividends receivable | 647,589.56 | (1,037,150.02) |
| **Total** | **36,990,594.36** | **164,096,533.21** |
# 54. Asset impairment losses
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Impairment losses of inventories | (12,355,834.94) | (123,977,821.11) |
| Impairment reversals/(losses) of contract assets | 875,352.50 | (5,565.65) |
| Impairment losses of prepayments | (929,391.33) | - |
| **Total** | **(12,409,873.77)** | **(123,983,386.76)** |
# 55. Gains from disposal of assets
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Gains from disposal of fixed assets and others | 22,852,022.34 | 11,390,954.31 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 56. Non-operating income
| Item | 2025 | Including: Amount included in non-recurring gains and losses (2025) | 2024 | Including: Amount included in non-recurring gains and losses (2024) |
| :--- | :--- | :--- | :--- | :--- |
| Others | 29,844,735.98 | 29,844,735.98 | 50,033,016.18 | 50,033,016.18 |
## 57. Non-operating expenses
| Item | 2025 | Including: Amount included in non-recurring gains and losses (2025) | 2024 | Including: Amount included in non-recurring gains and losses (2024) |
| :--- | :--- | :--- | :--- | :--- |
| Donations | 28,535,000.00 | 28,535,000.00 | 28,630,000.00 | 28,630,000.00 |
| Others | (175,959,813.21) | (175,959,813.21) | 399,135,273.12 | 399,135,273.12 |
| Total | (147,424,813.21) | (147,424,813.21) | 427,765,273.12 | 427,765,273.12 |
## 58. Income tax expenses
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Current income tax expenses | 3,255,880,707.97 | 4,176,138,422.89 |
| Deferred income tax expenses | (9,882,658.74) | (75,270,453.91) |
| Adjustments to income tax of previous years | 625,572,939.14 | 58,618,212.65 |
| Total | 3,871,570,988.37 | 4,159,486,181.63 |
---
# Reconciliation of income tax expenses to accounting profits
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Accounting profits | 18,602,715,153.37 | 21,627,616,828.29 |
| Income tax calculated at tax rate of 25% | 4,650,678,788.34 | 5,406,904,207.07 |
| Adjustment of differences in final settlement | 625,572,939.14 | 58,618,212.65 |
| Tax effect of non-taxable income | (337,953,041.95) | (354,498,441.68) |
| Tax effect of non-deductible expenses | 256,608,743.74 | 131,454,305.53 |
| Tax effect of utilization of unrecognized deductible losses and deductible temporary differences in previous years | (2,459,717.42) | (38,829,451.53) |
| Tax effect of unrecognized deductible losses and deductible temporary differences | 306,577,998.70 | 346,570,927.19 |
| The effect of the inconsistency between income tax rate applicable to the current period and the income tax rate when measuring the deferred income tax | 10,149,319.26 | (65,149,225.63) |
| Income tax effect of tax incentives | (906,509,223.07) | (1,378,236,075.80) |
| Tax effect of tax-free income | (565,772,389.04) | (457,981,332.16) |
| Additional deduction for R&D costs | (112,429,172.54) | (126,530,478.65) |
| Others | (52,893,256.79) | 637,163,534.64 |
| Income tax expenses | 3,871,570,988.37 | 4,159,486,181.63 |
# 59. Calculation of basic earnings per share and diluted earnings per share
## (1) Basic earnings per share
**Basic earnings per share** are calculated by dividing the consolidated net profit attributable to shareholders of ordinary shares of the Company by the weighted average number of ordinary shares of the Company in issue:
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company | 9,765,358,959.88 | 10,838,120,422.43 |
| Weighted average number of ordinary shares of the Company in issue | 50,498,611,100.00 | 50,498,611,100.00 |
| Basic earnings per share (RMB/share) | 0.193 | 0.215 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Diluted earnings per share
Diluted earnings per share are calculated by dividing the consolidated net profit attributable to shareholders of ordinary shares of the Company (diluted) by the weighted average number of ordinary shares of the Company in issue (diluted):
| Item | Note | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company (diluted) | (a) | 9,798,692,062.89 | 10,838,120,422.43 |
| Weighted average number of ordinary shares of the Company in issue (diluted) | (b) | 51,054,923,543.23 | 50,498,611,100.00 |
| Diluted basic earnings per share (RMB/share) | | 0.192 | 0.215 |
### (a) Calculation of consolidated net profit attributable to shareholders of ordinary shares of the Company (diluted) is as follows:
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company | 9,765,358,959.88 | 10,838,120,422.43 |
| Dilution adjustment: | | |
| Interest recognized on the liability portion of convertible bonds, after tax | 33,333,103.01 | — |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company (diluted) | 9,798,692,062.89 | 10,838,120,422.43 |
### (b) Calculation of weighted average number of ordinary shares (diluted) is as follows:
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Closing weighted average number of ordinary shares | 50,498,611,100.00 | 50,498,611,100.00 |
| Dilution adjustment: | | |
| Impact of convertible bonds (Note) | 556,312,443.23 | — |
| Closing weighted average number of ordinary shares (diluted) | 51,054,923,543.23 | 50,498,611,100.00 |
Note: The impact of convertible bonds is calculated on a monthly weighted average basis.
---
# 60. Government grants
## (1) Government grants included in current profit or loss
As at December 31, 2025, the summary of government grants of the Group included in profit or loss is as follows:
| Government grants | 2025 | 2024 |
| :--- | :--- | :--- |
| VAT refunds | 1,560,657,486.27 | 1,417,993,766.73 |
| CNPRI Project A | 95,085,328.38 | — |
| CNPRI Project B | 62,033,595.00 | — |
| GNPJVC Project A | 46,800,612.82 | 31,678,130.81 |
| CNPRI Project C | 23,485,000.00 | 4,697,000.00 |
| CGN Engineering Project A | 15,000,000.00 | — |
| SNPI Project A | 10,881,499.16 | 973,400.00 |
| SNPI Project B | 10,110,154.60 | 9,219,023.62 |
| Others | 206,516,090.37 | 221,322,849.33 |
| **Total** | **2,030,569,766.60** | **1,685,884,170.49** |
## (2) Liability items related to government grants
For details of the liability items related to government grants, please refer to Note (V) 36.
# 61. Cash flow statements items
## (1) Cash relating to operating activities
**a. Other cash received relating to operating activities**
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Guarantee deposit and deposit | 1,611,973,029.24 | 1,693,307,664.30 |
| Service payments received from related parties and engineering payments received from related parties | 271,145,042.70 | 362,515,690.30 |
| Government grants related to asset | 127,273,040.83 | 114,223,651.54 |
| Government grants related to income | 99,578,503.41 | 46,464,165.01 |
| Bank settlement and interest | 417,173,430.45 | 179,670,946.40 |
| Liquidated damages, refunds and advances | 161,405,472.43 | 136,524,140.26 |
| Rental, consulting and other services income | 38,815,230.59 | 57,789,504.46 |
| Others | 1,185,441,042.67 | 631,230,417.82 |
| **Total** | **3,912,804,792.32** | **3,221,726,180.09** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## b. Other cash payments relating to operating activities
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Guarantee deposit and deposit | 1,742,825,132.29 | 1,572,556,168.15 |
| Service payments to related parties and engineering payments received in advance | 1,360,532,846.67 | 1,381,285,037.03 |
| Transportation and travelling expenses and other expenses reimbursement | 138,813,347.05 | 150,745,178.68 |
| Consulting and other services expenses | 204,200,856.97 | 173,374,809.74 |
| Remittance of other expenses and other reimbursements | 271,338,913.44 | 300,369,754.64 |
| Transportation service fees | 109,222,173.70 | 103,221,118.27 |
| Insurance | 72,498,042.13 | 69,659,519.39 |
| Others | 759,427,559.30 | 768,816,586.93 |
| **Total** | **4,658,858,871.55** | **4,520,028,172.83** |
# (2) Cash relating to investing activities
### a. Significant cash paid relating to investing activities
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Cash paid to purchase and construct fixed assets, intangible assets and other long-term assets – Lufeng Nuclear | 11,397,725,003.99 | 9,118,633,035.94 |
| Cash paid to purchase and construct fixed assets, intangible assets and other long-term assets – Huizhou Nuclear | 5,436,236,375.00 | 7,015,694,355.70 |
| Cash paid to purchase and construct fixed assets, intangible assets and other long-term assets – Zhaoyuan Nuclear | 3,278,951,084.20 | 1,057,603,759.42 |
| Cash paid to purchase and construct fixed assets, intangible assets and other long-term assets – Huizhou Second Nuclear | 3,223,554,487.72 | 2,545,120,452.53 |
| **Total** | **23,336,466,950.91** | **19,737,051,603.59** |
### b. Other cash received relating to investing activities
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Recovery of fixed deposits with maturities of more than three months | 8,759,028,980.84 | 4,094,824,082.26 |
| Others | 36,931,835.13 | 4,938,027.42 |
| **Total** | **8,795,960,815.97** | **4,099,762,109.68** |
### c. Other cash paid relating to investing activities
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Deposit of fixed deposits with maturities of more than three months | 8,669,585,226.38 | 5,002,401,630.34 |
| Others | 58,869,441.84 | 177,313,317.98 |
| **Total** | **8,728,454,668.22** | **5,179,714,948.32** |
---
# (3) Cash relating to financing activities
## a. Other cash received relating to financing activities
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Security deposits for accounts of financing activities recovered | 1,000,000.00 | 1,005,669.72 |
| Equity investment payments received in advance | 4,200,000,000.00 | — |
| Others | — | 35,393,622.00 |
| **Total** | **4,201,000,000.00** | **36,399,291.72** |
## b. Other cash payments relating to financing activities
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Payment of consideration for business combination involving enterprises under common control | 11,961,058,100.00 | — |
| Payment of cash related to leases | 348,380,609.61 | 336,561,149.67 |
| Others | 8,906,700.76 | 8,972,900.98 |
| **Total** | **12,318,345,410.37** | **345,534,050.65** |
## c. Changes in liabilities arising from financing activities
| Item | Opening balance (Restated) | Increase during the year - Cash changes | Increase during the year - Non-cash changes | Decrease during the year - Cash changes | Decrease during the year - Non-cash changes | Closing balance |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Short-term loans | 17,734,748,583.43 | 58,933,451,367.79 | 4,788,672,846.89 | 39,305,752,848.18 | — | 42,151,119,949.93 |
| Other payables – dividends payable | 718,840,000.00 | — | 11,451,708,284.11 | 12,170,548,284.11 | — | — |
| Non-current liabilities due within one year – long-term loans | 18,575,799,883.35 | — | 48,654,186,769.37 | 36,598,219,864.58 | — | 30,631,766,788.14 |
| Non-current liabilities due within one year – lease liabilities | 290,437,869.59 | — | 37,409,447.39 | 39,180,378.34 | — | 288,666,938.64 |
| Non-current liabilities due within one year – bonds payable | 2,576,216,947.32 | — | 103,145,618.04 | 2,621,517,262.96 | — | 57,845,302.40 |
| Other current liabilities – short-term bonds payable | 2,522,489,178.08 | — | 11,690,000.00 | 2,534,179,178.08 | — | — |
| Long-term loans | 191,999,218,538.11 | 48,905,007,474.39 | 6,754,384,934.55 | 8,801,033,237.53 | 48,654,186,769.37 | 190,203,390,940.15 |
| Bonds payable | 2,396,804,008.97 | 7,226,821,988.68 | 134,741,644.02 | — | 91,969,783.51 | 9,666,397,858.16 |
| Lease liabilities | 856,786,358.07 | — | 1,349,575,017.41 | 1,103,027,600.77 | 346,643,491.99 | 756,690,282.72 |
| **Total** | **237,671,341,366.92** | **115,065,280,830.86** | **73,285,514,561.78** | **103,173,458,654.55** | **49,092,800,044.87** | **273,755,878,060.14** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 62. Supplementary information to cash flow statements
### (1) Supplementary information to cash flow statements
| Supplementary information | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| **(a) Reconciliation of net profit to cash flows from operating activities:** | | |
| Net profit | 14,731,144,165.00 | 17,468,130,646.66 |
| Add: Reversals of credit impairment | (36,990,594.36) | (164,096,533.21) |
| Asset impairment losses | 12,409,873.77 | 123,983,386.76 |
| Depreciation of fixed assets | 12,532,525,023.80 | 12,464,107,489.84 |
| Depreciation of right-of-use assets | 312,022,384.09 | 297,835,767.42 |
| Amortization of intangible assets | 694,934,750.25 | 650,734,294.54 |
| Amortization of long-term deferred expenses | 54,867,651.64 | 52,434,400.74 |
| Gains on disposal of fixed assets, intangible assets and other long-term assets | (22,852,022.34) | (11,390,954.31) |
| Depreciation of investment properties | 8,617,389.79 | 34,538,026.49 |
| Losses on retirement of fixed assets | 39,399,067.09 | 77,150,522.08 |
| (Gains)/losses from changes in fair value | (6,322,000.00) | 6,322,000.00 |
| Finance costs | 4,723,746,540.37 | 5,387,653,035.40 |
| Investment income | (2,353,145,464.96) | (1,932,890,838.93) |
| Increase in deferred tax assets | (112,122,032.56) | (112,626,546.11) |
| Increase in deferred tax liabilities | 102,239,373.83 | 37,356,092.20 |
| (Increase)/decrease in inventories | (2,075,529,114.70) | 145,470,307.87 |
| Decrease/(increase) in contract assets | 388,590,587.67 | 76,322,656.95 |
| Increase in contract liabilities | 811,848,437.88 | 3,105,712,912.32 |
| (Increase)/decrease in operating receivables | (2,186,360,610.41) | 358,105,187.92 |
| Increase/(decrease) in operating payables | 2,351,505,986.16 | (559,123,812.93) |
| **Net cash flows from operating activities** | **29,970,529,392.01** | **37,505,728,041.70** |
| | | |
| **(b) Net changes in cash and cash equivalents:** | | |
| Closing balance of cash | 13,450,015,508.74 | 9,133,709,620.39 |
| Less: Opening balance of cash | 9,133,709,620.39 | 10,720,185,732.03 |
| Add: Closing balance of cash equivalents | – | – |
| Less: Opening balance of cash equivalents | – | – |
| **Net increase/(decrease) in cash and cash equivalents** | **4,316,305,888.35** | **(1,586,476,111.64)** |
---
# (2) Information on acquisition or disposal of subsidiaries
## Information on acquisition of subsidiaries:
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Price of acquisition of subsidiaries | 11,961,058,100.00 | – |
| Cash or cash equivalents in current year for acquisition of subsidiaries in current year | 11,961,058,100.00 | – |
| Including: Taishan Second Nuclear | 1,203,875,600.00 | – |
| Huizhou Nuclear | 8,537,452,100.00 | – |
| Huizhou Second Nuclear | 2,119,730,400.00 | – |
| Huizhou Third Nuclear | 100,000,000.00 | – |
| Less: Cash and cash equivalents held by subsidiaries | – | – |
| Net cash paid for acquisition of subsidiaries | 11,961,058,100.00 | – |
| Including: Net cash paid for business combination involving enterprises under common control in current year which presented in “other cash payments relating to financing activities” | 11,961,058,100.00 | – |
## Information on disposal of subsidiaries:
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Cash or cash equivalents received in current year for disposal of subsidiaries in current year | – | 91,215,134.38 |
| Including: Guangdong Daya Bay Nuclear Power Environment Protection Company Co., Ltd. (廣東大亞灣核電環保有限公司) | – | 91,215,134.38 |
| Less: Cash and cash equivalents held by subsidiaries on the day of loss of control | – | 1,282.15 |
| Including: Guangdong Daya Bay Nuclear Power Environment Protection Company Co., Ltd. (廣東大亞灣核電環保有限公司) | – | 1,282.15 |
| Add: Cash or cash equivalents received in current year for disposal of subsidiaries in previous years | 2,252,840.76 | – |
| Including: Guangdong Daya Bay Nuclear Power Environment Protection Company Co., Ltd. (廣東大亞灣核電環保有限公司) | 2,252,840.76 | – |
| Net cash received from disposal of subsidiaries | 2,252,840.76 | 91,213,852.23 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (3) Composition of cash and cash equivalents
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| I. Cash | 13,450,015,508.74 | 9,133,709,620.39 |
| Including: Cash in hand | – | – |
| Bank deposits available on demand | 13,450,015,508.74 | 9,133,709,620.39 |
| II. Closing balance of cash and cash equivalents | 13,450,015,508.74 | 9,133,709,620.39 |
## (4) Cash at bank and in hand other than cash and cash equivalents
| Item | December 31, 2025 | December 31, 2024 (Restated) | Reason |
| :--- | :--- | :--- | :--- |
| Fixed deposits of more than three months | 7,142,678,749.79 | 7,268,736,126.57 | Have poor liquidity, cannot be easily converted into cash, and are not available on demand |
| Guarantee deposit | 205,465,355.43 | 391,077,219.94 | Have poor liquidity, cannot be easily converted into cash, and are not available on demand |
| Bank deposit interest accrued | 28,561,205.07 | 232,773,233.95 | Not actually received |
---
# 63. Assets with restricted ownership or right of use
| Item | December 31, 2025 | December 31, 2024 (Restated) | Reason for being restricted |
| :--- | :--- | :--- | :--- |
| Cash at bank and in hand (Note 1) | 205,465,355.43 | 391,077,219.94 | Various deposits, land reclamation deposits, restricted and frozen deposits |
| Accounts receivable (Note 2) | 3,016,903,563.92 | 3,782,816,752.87 | Pledged loans |
| Fixed assets (Note 3) | 12,727,310,470.45 | 13,442,977,641.20 | Restricted disposal |
| **Total** | **15,949,679,389.80** | **17,616,871,614.01** | |
**Note 1:** The various deposits were for the bank deposits of the Group according to the supply and purchase contract, the land reclamation deposits were deposited by Lufeng Nuclear to fulfill the obligations for land reclamation as required by the government, and the restricted and frozen deposits of our power sales companies.
**Note 2:** On August 22, 2005, Lingdong Nuclear entered into the Common Terms Agreement on Loans for Phase II of Guangdong Ling'ao NPP Construction Project with China Development Bank (the "CDB"), Agricultural Bank of China Shenzhen Branch and Industrial and Commercial Bank of China Shenzhen Branch, and acquired a total loan facility equivalent to USD2.585 billion from the banks for the construction of the Ling'ao NPP phase II project, with a maturity period ranged from 15 to 22 years. Lingdong Nuclear transferred its interest in the insurance contract of the phase II of the Ling'ao NPP project to CDB, and pledged the collection rights to all electricity sales income in the electricity sales income collection account to CDB.
Taishan Nuclear entered into the Common Terms Agreement on Phase I of Guangdong Taishan NPP Construction Project with seven financial institutions (syndicate) including the CDB and the Bank of China, and obtained a total loan facility of equivalent to not more than RMB57.2 billion from the aforementioned banks. The term of the loan shall not be more than 25 years from the date of signing the agreement, and the final maturity date will not be later than September 7, 2034. Taishan Nuclear transferred its interests in the insurance contract of the phase I of Guangdong Taishan NPP Construction Project to CDB, and pledged the collection rights to accounts receivable under the electricity sales contract to CDB.
On July 29, 2010, pledging the electricity sales receivables of Fangchenggang Phase I Construction Project and the interest in the insurance under the phase I construction project, Fangchenggang Nuclear entered into a series of syndicate agreements with various financial institutions including the CGN Finance (as the leader), China Construction Bank and CDB to obtain a comprehensive borrowing facilities equivalent to RMB22.671 billion and equivalent to USD0.4 billion in aggregate for the construction of its phase I project, with a term from the date of signing until September 29, 2031. In addition, Fangchenggang Nuclear pledged the electricity sales receivables from the phase II project and the interest in the insurance under the phase II construction project and signed a series of syndicate agreements with various financial institutions including China Construction Bank (as the leader), CDB and Export-Import Bank on February 16, 2016, obtaining comprehensive borrowing facilities equivalent to RMB28.529 billion and equivalent to USD246 million in aggregate for the construction of its phase II project, with a term from the date of the first withdrawal to the 25th anniversary after the date of the first withdrawal.
On April 18, 2008, pledging the collection rights to electricity sales receivables under the future power sales agreement of Ningde Phase I Construction Project, the interest in construction entrustment contract and the interest in the construction insurance, Ningde Nuclear signed the Common Terms Agreement with four financial institutions including Industrial and Commercial Bank of China to obtain a borrowing equivalent to RMB39.966 billion in aggregate, with a term of 20 to 25 years.
**Note 3:** According to the Commitment Letter on Land Use Rights and Equipment issued by Lingdong Nuclear to CDB, during the term of the loan contract, Lingdong Nuclear shall not, in any form, dispose of, including but not limited to sell, let or pledge, any of the equipment asset with an original value over USD500,000.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 64. Foreign currency monetary items
### (1) Foreign currency monetary items
| Item | Foreign currency balance (December 31, 2025) | Exchange rate (December 31, 2025) | RMB balance (December 31, 2025) |
| :--- | :--- | :--- | :--- |
| **Cash at bank and in hand** | | | |
| Including: USD | 513,845.21 | 7.0288 | 3,611,715.19 |
| EUR | 1,265,518.76 | 8.2355 | 10,422,179.76 |
| HKD | 238,185.51 | 0.9032 | 215,129.15 |
| GBP | 4,753,183.07 | 9.4346 | 44,844,380.98 |
| RMB | 4,097,384,175.59 | 1.0000 | 4,097,384,175.59 |
| **Accounts receivable** | | | |
| Including: USD | 50,000.00 | 7.0288 | 351,440.00 |
| EUR | 1,231,994.25 | 8.2355 | 10,146,088.65 |
| GBP | 16,925.61 | 9.4346 | 159,686.36 |
| RMB | 7,374,607.03 | 1.0000 | 7,374,607.03 |
| **Other receivables** | | | |
| Including: EUR | 5,940,407.60 | 8.2355 | 48,922,226.79 |
| GBP | 690,000.00 | 9.4346 | 6,509,874.00 |
| RMB | 538,571.74 | 1.0000 | 538,571.74 |
---
## December 31, 2025
| Item | Foreign currency balance | Exchange rate | RMB balance |
| :--- | :--- | :--- | :--- |
| **Accounts payable** | | | |
| Including: USD | 5,258,492.83 | 7.0288 | 36,960,894.40 |
| EUR | 18,014,081.50 | 8.2355 | 148,354,968.19 |
| HKD | 6,158,906.54 | 0.9032 | 5,562,724.39 |
| GBP | 147,741.46 | 9.4346 | 1,393,881.58 |
| CHF | 397,786.13 | 8.8510 | 3,520,805.04 |
| RMB | 600,555,055.43 | 1.0000 | 600,555,055.43 |
| **Other payables** | | | |
| Including: HKD | 25,200.00 | 0.9032 | 22,760.64 |
| GBP | 4,880.60 | 9.4346 | 46,046.51 |
| RMB | 413,899,565.49 | 1.0000 | 413,899,565.49 |
| **Taxes payable** | | | |
| Including: USD | 32,028.72 | 7.0288 | 225,123.47 |
| HKD | 456,425.80 | 0.9032 | 412,243.78 |
| GBP | 74,895.86 | 9.4346 | 706,612.48 |
| RMB | 18,231,669.79 | 1.0000 | 18,231,669.79 |
| **Employee benefits payable** | | | |
| Including: RMB | 1,071,793.40 | 1.0000 | 1,071,793.40 |
| **Non-current liabilities due within one year** | | | |
| Including: EUR | 97,306,319.52 | 8.2355 | 801,366,194.41 |
| RMB | 2,514,727.05 | 1.0000 | 2,514,727.05 |
| **Short-term loans** | | | |
| Including: RMB | 213,370,358.15 | 1.0000 | 213,370,358.15 |
| **Provisions** | | | |
| Including: RMB | 1,381,275,714.35 | 1.0000 | 1,381,275,714.35 |
| **Lease liabilities** | | | |
| Including: RMB | 3,302,673.77 | 1.0000 | 3,302,673.77 |
# (2) Description of overseas business entities:
The sales customers of GNPJVC are mainly GNIC and Hong Kong Nuclear Investment Co., Ltd. (**香港核電投資有限公司**) (“HKNIC”), and all of the sales are conducted in USD. During the period of preparation for the establishment of GNPJVC, the funds required for the construction of the NPP were mainly obtained from loans for financing, the funds from which were mainly long-term USD loans, and such loans from financing activities were repaid in USD. Therefore, GNPJVC selected USD as its reporting currency.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 65. Leases
### (1) Leases in which the Group as a lessee:
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Short-term lease expenses under simplified accounting treatment | 100,263,057.50 | 93,838,598.78 |
| Income from subletting right-of-use assets | 5,032,940.39 | 3,697,880.71 |
| Total cash outflow related to leases | 421,984,238.07 | 430,399,748.45 |
### (2) Leases in which the Group as a lessor:
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Rental income | 69,735,346.41 | 68,725,345.46 |
| Including: Income related to variable lease payments not included in lease receipts | — | — |
The undiscounted lease receipts that the Group will receive after the balance sheet date are as follows:
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Within 1 year (including 1 year) | 61,487,299.43 | 111,647,154.27 |
| 1 year to 2 years (including 2 years) | 34,027,456.35 | 95,824,722.11 |
| 2 years to 3 years (including 3 years) | 25,218,122.00 | 33,738,047.59 |
| 3 years to 4 years (including 4 years) | 23,859,766.82 | 25,112,381.25 |
| 4 years to 5 years (including 5 years) | 24,462,196.39 | 24,060,875.39 |
| More than 5 years | 98,198,803.12 | 119,784,803.79 |
| Total | 267,253,644.11 | 410,167,984.40 |
---
# (VI) R&D EXPENDITURE
## 1. Expenditure by nature
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Commissioning fees paid for R&D outsourcing, cooperation and others | 1,022,421,538.77 | 1,072,583,974.01 |
| Employees’ remuneration | 1,505,327,706.22 | 1,573,952,286.82 |
| Inspection expenses | 539,248,075.01 | 147,163,793.14 |
| Depreciation and amortization | 197,322,435.07 | 386,074,942.30 |
| Others | 798,804,960.36 | 1,013,906,350.32 |
| **Total** | **4,063,124,715.43** | **4,193,681,346.59** |
| Including: R&D expenditure recognized in profit or loss | 1,916,903,471.42 | 2,442,885,957.10 |
| R&D expenditure capitalized | 2,146,221,244.01 | 1,750,795,389.49 |
## 2. Development expenditure on R&D projects that meet capitalization conditions
| Item | January 1, 2025 | Increase during the year | Transfer to intangible assets during the year | December 31, 2025 |
| :--- | :--- | :--- | :--- | :--- |
| AP1000 | 455,121,510.98 | 83,632.29 | – | 455,205,143.27 |
| HPR/ACPR 1000 | 591,191,703.42 | 103,669,365.47 | 31,440,067.03 | 663,421,001.86 |
| Others | 6,300,119,718.93 | 2,042,468,246.25 | 1,102,288,644.89 | 7,240,299,320.29 |
| **Total** | **7,346,432,933.33** | **2,146,221,244.01** | **1,133,728,711.92** | **8,358,925,465.42** |
---
# (VII) CHANGES IN CONSOLIDATION SCOPE
## 1. Business combination involving enterprises under common control
### (1) Business combination involving enterprises under common control conducted during the year
| Acquiree | Proportion of equity acquired in business combination | Basis for constituting business combination involving enterprises under common control | Combination date | Basis for determining the combination date | Revenue (From the beginning of the year to the combination date) | Net profit (From the beginning of the year to the combination date) | Net cash inflow/(outflow) (From the beginning of the year to the combination date) | Revenue (2024) | Net profit (2024) |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Taishan Second Nuclear | 100% | Before the combination, both the Company and the acquiree were controlled by CGNPC | January 20, 2025 | The Company obtained control of the acquiree on January 20, 2025 | - | - | (1,536,475.42) | - | - |
| Huizhou Nuclear | 82% | Before the combination, both the Company and the acquiree were controlled by CGNPC | October 31, 2025 | The Company obtained control of the acquiree on October 31, 2025 | - | - | 228,154,573.45 | - | - |
| Huizhou Second Nuclear | 100% | Before the combination, both the Company and the acquiree were controlled by CGNPC | October 31, 2025 | The Company obtained control of the acquiree on October 31, 2025 | - | - | 325,529,469.17 | - | - |
| Huizhou Third Nuclear (Note 1) | 100% | Before the combination, both the Company and the acquiree were controlled by CGNPC | October 31, 2025 | The Company obtained control of the acquiree on October 31, 2025 | - | - | 41,012,262.61 | N/A | N/A |
Note 1: Huizhou Third Nuclear was established on February 16, 2025, and had no revenue or net profit in 2024.
---
# (2) Combination cost
| | Taishan Second Nuclear | Huizhou Nuclear (Note) | Huizhou Second Nuclear (Note) | Huizhou Third Nuclear (Note) |
|:---|:---|:---|:---|:---|
| **Combination cost** | | | | |
| Cash | 1,203,875,600.00 | 8,537,452,100.00 | 2,119,730,400.00 | 100,000,000.00 |
**Note:** In October 2025, the Company held a general meeting, at which the acquisition of 82% equity interest in Huizhou Nuclear, 100% equity interest in Huizhou Second Nuclear and 100% equity interest in Huizhou Third Nuclear held by CGNPC at a total transaction price of RMB9,375,432,500.00 in cash was approved. Pursuant to the share transfer agreement, during the transition period from the valuation benchmark date to the closing date, if CGNPC increases its capital in the target companies through a cash capital increase, an amount equivalent to the cash increase shall be paid in one lump sum to CGNPC by the Company when making the consideration payment to CGNPC.
During the transition period, CGNPC made cash capital increases to Huizhou Nuclear by RMB514,750,000.00, Huizhou Second Nuclear by RMB767,000,000.00, and Huizhou Third Nuclear by RMB100,000,000.00, totaling RMB1,381,750,000.00. In summary, the total consideration paid by the Company to CGNPC for the acquisition was RMB10,757,182,500.00.
# (3) Carrying value of the assets and liabilities of the acquirees on the combination date
| Assets: | Taishan Second Nuclear Combination date | Taishan Second Nuclear December 31, 2024 | Huizhou Nuclear Combination date | Huizhou Nuclear December 31, 2024 | Huizhou Second Nuclear Combination date | Huizhou Second Nuclear December 31, 2024 | Huizhou Third Nuclear (Note 1) Combination date | Huizhou Third Nuclear (Note 1) December 31, 2024 |
|:---|:---|:---|:---|:---|:---|:---|:---|:---|
| Cash at bank and in hand | 15,450,507.36 | 16,986,982.78 | 415,140,097.15 | 185,902,957.03 | 372,341,116.34 | 28,648,213.83 | 41,012,242.61 | N/A |
| Prepayments | - | - | 5,855,017.91 | 1,157,278.82 | - | - | - | N/A |
| Other receivables | 0.91 | 0.91 | 485,504,126.92 | 368,995,481.42 | 4,421,649.25 | 219.79 | - | N/A |
| Inventories | - | - | 132,521,977.05 | 46,687,437.21 | - | - | - | N/A |
| Investment properties | - | - | 11,440,815.63 | 11,934,250.73 | - | - | - | N/A |
| Fixed assets | - | - | 1,144,248,200.55 | 1,140,417,210.10 | 103,634,810.19 | 104,925,574.59 | - | N/A |
| Construction in progress | 1,179,028,291.30 | 1,099,662,733.27 | 37,350,310,007.84 | 33,609,406,186.17 | 7,790,899,500.40 | 5,511,569,540.74 | 68,867,293.05 | N/A |
| Right-of-use assets | - | - | - | 36,305.72 | - | - | - | N/A |
| Intangible assets | - | - | 500,417,611.46 | 509,635,978.21 | 43,617,570.57 | 44,285,677.74 | - | N/A |
| Other non-current assets | 243,988,552.33 | 239,111,946.26 | 6,450,463,023.44 | 5,055,493,538.15 | 1,437,980,582.94 | 510,473,114.21 | 466,549.04 | N/A |
| **Liabilities:** | | | | | | | | |
| Short-term loans | 83,109,638.01 | 82,947,865.20 | 1,164,194,427.03 | - | 512,958,544.70 | 471,003,124.44 | - | N/A |
| Accounts payable | 42,761,551.34 | 5,184,194.34 | 1,488,862,525.69 | 482,958,988.69 | 16,889,582.60 | 14,870,480.66 | - | N/A |
| Receipts in advance | - | - | 14,150.94 | - | - | - | - | N/A |
| Employee benefits payable | - | - | 665,947.53 | 891,449.38 | - | - | - | N/A |
| Taxes payable | - | - | 1,348,901.63 | 4,950,408.69 | - | - | - | N/A |
| Other payables | - | 5,632.00 | 840,408.03 | 133,860.22 | 120,512,298.03 | 108,294.86 | 10,346,104.70 | N/A |
| Non-current liabilities due within one year | 218,080.11 | 27,489.24 | 256,390,128.94 | 412,415,553.20 | 20,745,619.05 | 2,912,514.13 | - | N/A |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
| | Taishan Second Nuclear | Taishan Second Nuclear | Huizhou Nuclear | Huizhou Nuclear | Huizhou Second Nuclear | Huizhou Second Nuclear | Huizhou Third Nuclear (Note 1) | Huizhou Third Nuclear (Note 1) |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| | Combination date | December 31, 2024 | Combination date | December 31, 2024 | Combination date | December 31, 2024 | Combination date | December 31, 2024 |
| Long-term loans | 112,378,082.44 | 67,596,482.44 | 34,771,507,948.73 | 31,730,989,923.95 | 7,087,969,185.31 | 4,484,237,926.81 | - | N/A |
| Net assets | 1,200,000,000.00 | 1,200,000,000.00 | 8,812,076,439.43 | 8,297,326,439.43 | 1,993,770,000.00 | 1,226,770,000.00 | 100,000,000.00 | N/A |
| Less: Non-controlling interests | - | - | 1,484,666,964.38 | 1,484,662,759.10 | - | - | - | N/A |
| Net assets acquired | 1,200,000,000.00 | 1,200,000,000.00 | 7,327,409,475.05 | 6,812,663,680.33 | 1,993,770,000.00 | 1,226,770,000.00 | 100,000,000.00 | N/A |
**Note 1: Huizhou Third Nuclear was established on February 16, 2025, and had no carrying value of assets and liabilities as at December 31, 2024.**
## 2. Deregistration of subsidiaries
On June 6, 2025, Sansha Advanced Energy Co., Ltd. (三沙先進能源有限公司), a subsidiary of the Company, completed the industrial and commercial deregistration.
---
# 3. Establishment of subsidiaries
| Name of the newly established subsidiaries | Principal place of operation | Place of registration | Business nature | Time of establishment | Method of acquisition |
| :--- | :--- | :--- | :--- | :--- | :--- |
| CGN Intelligent Manufacturing Technology (Suzhou) Co., Ltd. (中廣核智造科技(蘇州)有限公司) | Suzhou, Jiangsu Province | Suzhou, Jiangsu Province | Technology research and experimental development | April 2025 | Establishment |
| CGN (Jieyang) Nuclear Power Co., Ltd. (中廣核(揭陽)核電有限公司) | Jieyang, Guangdong Province | Jieyang, Guangdong Province | Nuclear power generation | May 2025 | Establishment |
| Shandong Rizhao Dawang Clean Energy Co., Ltd. (山東日照大旺清潔能源有限公司) | Rizhao, Shandong Province | Rizhao, Shandong Province | Power generation business, heat production and supply | June 2025 | Establishment |
| Shandong Weifang Taolin Clean Energy Co., Ltd (山東濰坊桃林清潔能源有限公司) | Weifang, Shandong Province | Weifang, Shandong Province | Power generation business, heat production and supply | June 2025 | Establishment |
| CGN Huasheng Technology (Shenzhen) Co., Ltd. (中廣核華昇科技(深圳)有限公司) | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Technology development | July 2025 | Establishment |
| CGN Eastern Guangdong (Lufeng) Nuclear Co., Ltd. (中廣核粵東(陸豐)核電有限公司) | Shanwei, Guangdong Province | Shanwei, Guangdong Province | Nuclear power generation | October 2025 | Establishment |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (VIII) INTEREST IN OTHER ENTITIES
### 1. Interests in subsidiaries
#### (1) Constitution of the corporate group
| Name of subsidiary | Notes | Principal place of operation | Place of registration | Business nature | Registered capital: Currency | Registered capital: Unit: Yuan/Dollar | Shareholding: Direct | Shareholding: Indirect | Method of acquisition |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| GNIC | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Investment | RMB | 16,000,000,000.00 | 100.00% | - | Establishment |
| GNPJVC | Note 2 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Nuclear power generation | USD | 400,000,000.00 | - | 75.00% | Establishment |
| DNMC | Note 2 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Operation and management of NPPs | RMB | 250,000,000.00 | - | 87.50% | Establishment |
| CGN Nuclear Power Investment Co., Ltd. (中廣核核電投資有限公司) | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Investment | RMB | 100,000,000.00 | 77.78% | - | Establishment |
| Ninghe Investment | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Investment | RMB | 100,000,000.00 | 56.52% | - | Establishment |
| Ling’ao Nuclear | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Nuclear power generation | RMB | 3,323,224,000.00 | 70.00% | 30.00% | Establishment |
| Lingdong Nuclear | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Nuclear power generation | RMB | 5,348,000,000.00 | 25.00% | 75.00% | Establishment |
| Yangjiang Nuclear | Note 2 | Yangjiang, Guangdong Province | Yangjiang, Guangdong Province | Nuclear power generation | RMB | 15,506,000,000.00 | 34.00% | 25.00% | Establishment |
| CGN Operations | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Provision of management, technology and consultancy services | RMB | 150,000,000.00 | 100.00% | - | Establishment |
| CNPRI | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Nuclear power technology development | RMB | 4,135,550,000.00 | 100.00% | - | Establishment |
| Inspection Company | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Testing and maintenance of power stations | RMB | 230,000,000.00 | - | 100.00% | Establishment |
| Radiation Monitoring Company | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Radiation detection and evaluation, instrument verification | RMB | 20,000,000.00 | - | 100.00% | Establishment |
| SNPI | Note 1 | Suzhou, Jiangsu Province | Suzhou, Jiangsu Province | Nuclear power technology development | RMB | 513,950,000.00 | 100.00% | - | Business combination not under common control |
---
# Subsidiaries of CGN Power Co., Ltd.
| Name of subsidiary | Notes | Principal place of operation | Place of registration | Business nature | Registered capital Currency | Registered capital Unit: Yuan/Dollar | Shareholding Direct | Shareholding Indirect | Method of acquisition |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Ningde Nuclear | Note 1, Note 3 | Ningde, Fujian Province | Ningde, Fujian Province | Nuclear power generation | RMB | 11,177,500,000.00 | - | 46.00% | Business combination not under common control |
| Taishan Nuclear | Note 2 | Taishan, Guangdong Province | Taishan, Guangdong Province | Nuclear power generation | RMB | 28,600,000,000.00 | 12.50% | 57.50% | Business combination under common control |
| Taishan Investment | Note 1 | Taishan, Guangdong Province | Taishan, Guangdong Province | Investment | RMB | 30,000,000.00 | 60.00% | - | Business combination under common control |
| CGN Engineering | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Construction | RMB | 4,086,000,000.00 | 100.00% | - | Business combination under common control |
| CGN Design | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Construction design | RMB | 389,360,000.00 | - | 60.00% | Business combination under common control |
| Import & Export Company | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Import and export trade | RMB | 10,000,000.00 | - | 100.00% | Business combination under common control |
| Fangchenggang Nuclear | Note 1 | Fangchenggang, Guangxi | Fangchenggang, Guangxi | Nuclear power generation | RMB | 13,850,000,000.00 | - | 61.00% | Business combination under common control |
| Lufeng Nuclear | Note 1 | Shanwei, Guangdong Province | Shanwei, Guangdong Province | Nuclear power generation | RMB | 12,165,000,000.00 | 100.00% | - | Business combination under common control |
| CGN Power Sales Co., Ltd. (中廣核電力銷售有限公司) | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Sales of electricity | RMB | 730,000,000.00 | 100.00% | - | Business combination under common control |
| CGN Ocean Power Co., Ltd. (中廣核海洋能源有限公司) | Note 1 | Huizhou, Guangdong Province | Huizhou, Guangdong Province | Development, construction and operations of offshore power stations | RMB | 3,000,000,000.00 | 100.00% | - | Business combination under common control |
| Yangjiang Nuclear Power Co., Ltd. (陽江核電有限公司) | Note 1 | Yangjiang, Guangdong Province | Yangjiang, Guangdong Province | Investment, construction and operations of NPPs | RMB | 338,000,000.00 | - | 51.00% | Establishment |
| Fangchenggang Investment | Note 1 | Fangchenggang, Guangxi Province | Fangchenggang, Guangxi Province | Investment | RMB | 30,000,000.00 | 60.00% | - | Establishment |
| Hepeng Supervision Company | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Engineering supervision, engineering management and technical support service | RMB | 50,000,000.00 | 100.00% | - | Establishment |
| Fujian Ninghe Power Sales Co., Ltd. (福建寧核售電有限公司) | Note 1 | Fuzhou, Fujian Province | Fuzhou, Fujian Province | Power sales, electricity supply and power distribution network maintenance service | RMB | 200,000,000.00 | - | 100.00% | Establishment |
| Guangxi Fanghe Power Sales Co., Ltd. (廣西防核售電有限公司) | Note 1 | Fangchenggang, Guangxi | Fangchenggang, Guangxi | Electricity supply, power sales and power distribution network technical service | RMB | 201,000,000.00 | - | 100.00% | Establishment |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
| Name of subsidiary | Notes | Principal place of operation | Place of registration | Business nature | Registered capital: Currency | Registered capital: Unit: Yuan/Dollar | Shareholding: Direct | Shareholding: Indirect | Method of acquisition |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Zhaoyuan Nuclear | Note 1 | Yantai, Shandong Province | Yantai, Shandong Province | Nuclear power generation | RMB | 3,100,000,000.00 | 100.00% | - | Establishment |
| Guizhou Yuping Clean Thermal Energy Co., Ltd. (貴州玉屏清潔熱能有限公司) | Note 1 | Tongren, Guizhou Province | Tongren, Guizhou Province | Thermal power generation | RMB | 333,000,000.00 | 100.00% | - | Establishment |
| CGN Nanfang Technology Co., Ltd. (中廣核南方科技有限公司) | Note 1 | Zhongshan, Guangdong Province | Zhongshan, Guangdong Province | Nuclear power technology development | RMB | 2,200,000,000.00 | - | 100.00% | Establishment |
| Guangxi Fangchenggang Third Nuclear Power Co., Ltd. (廣西防城港第三核電有限公司) | Note 1 | Fangchenggang, Guangxi | Fangchenggang, Guangxi | Nuclear power generation | RMB | 850,000,000.00 | 61.00% | - | Establishment |
| CGN Clean Energy | Note 1 | Shanghai | Shanghai | Nuclear power technology development | RMB | 101,000,000.00 | 60.00% | - | Establishment |
| Huapeng Technology Energy (Guangdong) Co., Ltd. (華鵬科技能源(廣東)有限公司) | Note 1 | Huizhou, Guangdong Province | Huizhou, Guangdong Province | Thermal power generation | RMB | 104,000,000.00 | 100.00% | - | Establishment |
| Taishan Second Nuclear | Note 1 | Taishan, Guangdong Province | Taishan, Guangdong Province | Nuclear power generation | RMB | 1,740,000,000.00 | 100.00% | - | Business combination under common control |
| CGN (Jieyang) Nuclear Power Co., Ltd. (中廣核(揭陽)核電有限公司) | Note 1 | Jieyang, Guangdong Province | Jieyang, Guangdong Province | Nuclear power generation | RMB | 100,000,000.00 | 100.00% | - | Establishment |
| Shandong Rizhao Dawang Clean Energy Co., Ltd. (山東日照大旺清潔能源有限公司) | Note 1 | Rizhao, Shandong Province | Rizhao, Shandong Province | Power generation business, heat production and supply | RMB | 50,000,000.00 | 100.00% | - | Establishment |
| Shandong Weifang Taolin Clean Energy Co., Ltd (山東濰坊桃林清潔能源有限公司) | Note 1 | Weifang, Shandong Province | Weifang, Shandong Province | Power generation business, heat production and supply | RMB | 50,000,000.00 | 100.00% | - | Establishment |
| CGN Intelligent Manufacturing Technology (Suzhou) Co., Ltd. (中廣核智能科技(蘇州)有限公司) | Note 1 | Suzhou, Jiangsu Province | Suzhou, Jiangsu Province | Technology research and experimental development | RMB | 60,000,000.00 | - | 100.00% | Establishment |
| CGN Huasheng Technology (Shenzhen) Co., Ltd. (中廣核華昇科技(深圳)有限公司) | Note 1 | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Technology development | RMB | 100,000,000.00 | - | 51.00% | Establishment |
| Huizhou Nuclear | Note 1 | Huizhou, Guangdong Province | Huizhou, Guangdong Province | Nuclear power generation | RMB | 9,243,902,439.02 | 82.00% | - | Business combination under common control |
---
| Name of subsidiary | Notes | Principal place of operation | Place of registration | Business nature | Registered capital: Currency | Registered capital: Unit: Yuan/Dollar | Shareholding: Direct | Shareholding: Indirect | Method of acquisition |
|---|---|---|---|---|---|---|---|---|---|
| Huizhou Second Nuclear | Note 1 | Huizhou, Guangdong Province | Huizhou, Guangdong Province | Nuclear power generation | RMB | 7,612,000,000.00 | 100.00% | - | Business combination under common control |
| Huizhou Third Nuclear | Note 1 | Huizhou, Guangdong Province | Huizhou, Guangdong Province | Nuclear power generation | RMB | 1,800,000,000.00 | 100.00% | - | Business combination under common control |
| CGN Zhanjiang Nuclear Power Co., Ltd. (中廣核湛江核電有限公司) | Note 1 | Zhanjiang, Guangdong Province | Zhanjiang, Guangdong Province | Nuclear power generation | RMB | 20,000,000.00 | 100.00% | - | Acquisition under common control |
| CGN Eastern Guangdong (Lufeng) Nuclear Co., Ltd. (中廣核粵東(陸豐)核電有限公司) | Note 1 | Shanwei, Guangdong Province | Shanwei, Guangdong Province | Nuclear power generation | RMB | 100,000,000.00 | 100.00% | - | Establishment |
**Note 1:** The company is a limited liability company established in China.
**Note 2:** The company is a Sino-foreign joint venture with limited liability.
**Note 3: Basis for only holding half or less voting rights but still having control over the investees, as well as holding 50% or more voting rights but not having control over the investees:**
Ninghe Investment, a subsidiary of the Company, holds 46% equity interest in Ningde Nuclear. Datang International Power Generation Co., Ltd. (大唐國際發電股份有限公司) (“Datang International”) holds 44% equity interest in Ningde Nuclear. Fujian Funeng Co., Ltd. (福建福能股份有限公司) holds 10% equity interest in Ningde Nuclear. Ninghe Investment and Datang International entered into the Concerted Party Agreement, which became effective on January 1, 2017. Datang International agreed to act in concert with Ninghe Investment at the shareholders' meetings and the meetings of board of directors of Ningde Nuclear. Therefore, after entry into force of the Concerted Party Agreement, the Group can lead the relevant activities of Ningde Nuclear, and Ningde Nuclear has been changed from a joint venture of the Group to a subsidiary of the Group with unchanged shareholding.
GNIC, a subsidiary of the Company, holds 51% equity interest in Ningde Second Nuclear. China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) holds 39% equity interest in Ningde Second Nuclear. Fujian Funeng Co., Ltd. (福建福能股份有限公司) holds 10% equity interest in Ningde Second Nuclear. Pursuant to the articles of association of Ningde Second Nuclear and relevant documents such as the investment agreement, the rights enjoyed by the Group did not constitute control over Ningde Second Nuclear. The Group and China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) jointly control Ningde Second Nuclear, and the Group accounted for Ningde Second Nuclear as a joint venture of the Group.
**Note 4:** As at December 31, 2025, none of the subsidiaries had issued any debt securities.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Significant non-wholly-owned subsidiaries
| Name of subsidiary | Shareholding of non-controlling shareholders | 2025 Gains or losses attributable to non-controlling shareholders | 2025 Dividends announced to be distributed to non-controlling shareholders | December 31, 2025 Balance of non-controlling interests |
| :--- | :--- | :--- | :--- | :--- |
| Yangjiang Nuclear | 41.00% | 1,462,365,174.83 | 1,997,110,000.00 | 10,475,694,755.78 |
| Taishan Nuclear | 30.00% | 57,357,143.09 | – | 7,560,449,187.44 |
| GNPJVC | 25.00% | 937,004,842.94 | 75,906,714.22 | 2,330,950,716.99 |
| Ningde Nuclear | 54.00% | 1,412,611,021.07 | 1,503,641,776.19 | 8,806,880,942.36 |
| Fangchenggang Nuclear | 39.00% | 29,592,775.88 | 803,194,138.69 | 5,871,217,294.70 |
## (3) Significant financial information of significant non-wholly-owned subsidiaries
The following table sets out the significant financial information of the above subsidiaries which represents the amounts without offsetting internal transactions, but with the adjustments made in light of the fair value at the combination date and the adoption of consistent accounting policies:
### December 31, 2025
| Name of subsidiary | Current assets | Non-current assets | Total assets | Current liabilities | Non-current liabilities | Total liabilities |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Yangjiang Nuclear | 12,441,735,823.29 | 57,070,152,075.03 | 69,511,887,898.32 | 22,424,551,314.26 | 21,536,861,569.95 | 43,961,412,884.21 |
| Taishan Nuclear | 5,386,422,030.87 | 77,918,582,310.97 | 83,305,004,341.84 | 13,317,059,657.40 | 44,786,447,392.95 | 58,103,507,050.35 |
| GNPJVC | 9,340,948,864.63 | 4,716,935,101.38 | 14,057,883,966.01 | 1,933,102,385.20 | 2,800,978,712.86 | 4,734,081,098.06 |
| Ningde Nuclear | 6,481,230,940.95 | 34,077,196,541.63 | 40,558,427,482.58 | 9,779,077,520.63 | 14,468,582,211.20 | 24,247,659,731.83 |
| Fangchenggang Nuclear | 8,714,344,949.20 | 63,527,911,317.66 | 72,242,256,266.86 | 17,732,039,139.74 | 39,455,813,807.31 | 57,187,852,947.05 |
### December 31, 2024
| Name of subsidiary | Current assets | Non-current assets | Total assets | Current liabilities | Non-current liabilities | Total liabilities |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Yangjiang Nuclear | 10,482,837,347.93 | 59,376,157,735.56 | 69,858,995,083.49 | 18,354,691,712.45 | 24,659,706,338.67 | 43,014,398,051.12 |
| Taishan Nuclear | 6,268,529,846.29 | 80,520,461,257.76 | 86,788,991,104.05 | 9,480,669,227.40 | 52,307,415,667.67 | 61,788,084,895.07 |
| GNPJVC | 9,430,605,051.05 | 5,175,778,861.73 | 14,606,383,912.78 | 5,231,242,144.98 | 3,329,309,421.67 | 8,560,551,566.65 |
| Ningde Nuclear | 6,110,957,300.22 | 36,430,175,886.41 | 42,541,133,186.63 | 7,200,759,319.83 | 18,877,179,514.64 | 26,077,938,834.47 |
| Fangchenggang Nuclear | 7,436,530,494.26 | 65,808,500,065.58 | 73,245,030,559.84 | 15,699,457,555.60 | 40,516,602,107.99 | 56,216,059,663.59 |
---
| Name of subsidiary | 2025 Operating revenue | 2025 Net profit | 2025 Total comprehensive income | 2025 Cash flows from operating activities | 2024 Operating revenue | 2024 Net profit | 2024 Total comprehensive income | 2024 Cash flows from operating activities |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Yangjiang Nuclear | 16,471,446,046.50 | 3,566,744,328.85 | 3,566,744,328.85 | 6,336,354,826.56 | 17,768,639,369.87 | 4,160,782,595.85 | 4,160,782,595.85 | 8,748,680,514.45 |
| Taishan Nuclear | 8,487,939,923.99 | 191,190,476.96 | 191,190,476.96 | 5,937,254,668.58 | 8,717,155,797.63 | 107,835,240.60 | 107,835,240.60 | 6,241,249,958.39 |
| GNPJVC | 7,870,019,363.18 | 3,748,019,371.74 | 3,581,597,378.71 | 4,999,394,229.17 | 7,676,223,644.17 | 3,501,875,886.54 | 3,622,354,072.78 | 3,863,207,267.82 |
| Ningde Nuclear | 11,169,268,437.89 | 2,615,946,335.32 | 2,615,946,335.32 | 5,994,281,346.55 | 11,488,345,900.67 | 2,951,607,025.70 | 2,951,607,025.70 | 6,748,666,216.65 |
| Fangchenggang Nuclear | 7,984,025,382.94 | 75,878,912.50 | 75,878,912.50 | 5,396,064,675.38 | 9,841,105,235.74 | 2,278,083,550.59 | 2,278,083,550.59 | 5,735,796,969.48 |
(4) As at December 31, 2025 and December 31, 2024, there was no significant restriction on using the corporate group’s assets and settling the corporate group’s debts.
# 2. Interests in joint ventures or associates
## (1) Significant associates
| Name of associate | Principal place of operation | Place of registration | Business nature | Shareholding (%) Direct | Shareholding (%) Indirect | Accounting treatment for investment in associate |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Hongyanhe Nuclear | Dalian, Liaoning Province | Dalian, Liaoning Province | Nuclear power generation | – | 45.00 | Equity method |
| CGN Fund Phase I | Shenzhen, Guangdong Province | Beijing | Nuclear investment | 38.82 | – | Equity method |
| CGN Finance | Shenzhen, Guangdong Province | Shenzhen, Guangdong Province | Financial services | – | 30.00 | Equity method |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Significant financial information of significant associates
The following table sets out the significant financial information of the significant associates of the Group which represents the amounts following the adjustments made based on the fair value on investment and the adjustments following the adoption of consistent accounting policies. In addition, the following table also sets out the reconciliation of these financial information to the carrying amounts of investment in associates of the Group under the equity method:
| Item | December 31, 2025/2025: Hongyanhe Nuclear | December 31, 2025/2025: CGN Fund Phase I | December 31, 2025/2025: CGN Finance | December 31, 2024/2024: Hongyanhe Nuclear | December 31, 2024/2024: CGN Fund Phase I | December 31, 2024/2024: CGN Finance |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Current assets | 12,771,630,815.76 | 276,843,513.70 | 20,354,887,472.46 | 9,332,230,403.26 | 1,708,686.23 | 21,341,553,585.43 |
| Non-current assets | 62,384,372,630.25 | 9,169,286,626.22 | 21,417,939,452.46 | 63,893,589,482.28 | 10,045,308,024.42 | 18,077,974,962.72 |
| **Total assets** | **75,156,003,446.01** | **9,446,130,139.92** | **41,772,826,924.92** | **73,225,819,885.54** | **10,047,016,710.65** | **39,419,528,548.15** |
| Current liabilities | 17,151,171,929.16 | 251,534,906.40 | 34,870,354,537.51 | 12,292,316,787.18 | 775,869,473.68 | 32,628,869,947.19 |
| Non-current liabilities | 37,400,781,682.30 | - | 17,892,546.49 | 41,579,148,909.32 | - | 10,395,670.23 |
| **Total liabilities** | **54,551,953,611.46** | **251,534,906.40** | **34,888,247,084.00** | **53,871,465,696.50** | **775,869,473.68** | **32,639,265,617.42** |
| **Net assets** | **20,604,049,834.55** | **9,194,595,233.52** | **6,884,579,840.92** | **19,354,354,189.04** | **9,271,147,236.97** | **6,780,262,930.73** |
| Non-controlling interests | - | - | - | - | - | - |
| Equity attributable to shareholders of the parent company | 20,604,049,834.55 | 9,194,595,233.52 | 6,884,579,840.92 | 19,354,354,189.04 | 9,271,147,236.97 | 6,780,262,930.73 |
| Share of net assets calculated as per shareholding | 9,271,822,425.55 | 3,569,341,869.65 | 2,065,373,952.28 | 8,709,459,385.07 | 3,599,059,357.39 | 2,034,078,879.22 |
| Adjustments | | | | | | |
| - Goodwill occurred upon acquisition of investment | - | 146,080,985.55 | - | - | 146,080,985.55 | - |
| - Unrealized profit arising from internal transactions | (764,363,902.56) | (62,474,914.14) | (781,725.94) | (809,180,565.53) | (62,470,105.78) | - |
| **Book value of equity investment in associates** | **8,507,458,522.99** | **3,652,947,941.06** | **2,064,592,226.34** | **7,900,278,819.54** | **3,682,670,237.16** | **2,034,078,879.22** |
| Operating revenue | 15,811,329,897.24 | - | 1,027,482,883.90 | 14,624,977,115.63 | - | 979,838,693.47 |
| Net profit | 3,408,656,589.61 | 1,175,493,787.09 | 469,870,413.50 | 2,357,226,189.13 | 1,207,654,440.98 | 396,197,731.08 |
| **Total comprehensive income** | **3,408,656,589.61** | **1,175,493,787.09** | **469,870,413.50** | **2,357,226,189.13** | **1,207,654,440.98** | **396,197,731.08** |
| Dividends received from associates for the year | 969,024,242.38 | 487,562,872.00 | 106,981,984.09 | 729,354,150.33 | 399,832,610.00 | 89,359,273.01 |
---
## (3) Consolidated financial information of insignificant joint ventures and associates
| Item | December 31, 2025/ 2025 | December 31, 2024/ 2024 |
| :--- | :---: | :---: |
| Joint ventures: | | |
| Total book value of investment | 1,468,114,454.38 | 821,381,427.23 |
| Associates: | | |
| Total book value of investment | 1,738,020,678.22 | 1,198,048,305.81 |
| The sum of the following items calculated as per shareholding | | |
| – Net profit | 103,911,664.41 | 98,264,362.55 |
| – Other comprehensive income | (934,144.52) | (909,275.45) |
| – Total comprehensive income | 102,977,519.89 | 97,355,087.10 |
## (4) As at December 31, 2025 and December 31, 2024, there was no significant restriction on capacity of capital transfer from joint ventures or associates to the Group.
# (IX) RISKS RELEVANT TO FINANCIAL INSTRUMENTS
Major financial instruments of the Group include cash at bank and in hand, bills receivable, accounts receivable, other receivables, other investment in equity instruments, loans, bills payable, accounts payable, other payables, bonds payable etc. See Note (V) for details of the financial instruments. The following are risks relevant to these financial instruments and the risk management policies taken by the Group for reducing these risks. The management of the Group managed and supervised these risk exposures to keep the said risks under control.
The Group adopts sensitivity analysis method to analyze the potential impact of possible appropriate change in risk variables on current profits & losses or the shareholders' equity. As any risk variable seldom changes alone and correlation between variables greatly accounts for the final amount influenced by change of a certain risk variable, the following content is conducted under the assumption that change of each variable is independent.
## 1. Risk management objectives and policies
The Group's risk management objective is to achieve balance between risks and return, minimize the adverse effect of risks on the operating results of the Group and maximize the interests of shareholders and other equity investors. To achieve the said objective, the Group formulated a basic strategy of defining and analyzing various risks faced by the Group, setting a bottom line of risk tolerance and conducting timely and reliable supervision on the risks to keep them under control.
### (1) Foreign exchange risk
Foreign exchange risk represents the risk of loss due to exchange rate changes. The Group's exposure to foreign exchange risk is mainly related to USD, EUR and GBP. Except for the GNPJVC which mainly conducts transactions denominated in USD, the Group's other major business activities are denominated and settled in RMB. As at December 31, 2025 and December 31, 2024, except for the following balances of assets and liabilities, which are denominated in non-functional currency, the other assets and liabilities of the Group are functional currency balances.
The foreign exchange risk arising from the assets and liabilities of the foreign currency balances described below may have an impact on the Group's operating results.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (a) Foreign currency assets and liabilities of the Group denominated in RMB
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Cash at bank and in hand – USD | 3,611,715.19 | 3,548,908.42 |
| Cash at bank and in hand – EUR | 9,981,197.23 | 17,143,522.91 |
| Cash at bank and in hand – HKD | 192,202.24 | 197,803.24 |
| Cash at bank and in hand – GBP | 44,503,940.80 | 22,840,667.57 |
| Accounts receivable – USD | 351,440.00 | 359,420.00 |
| Accounts receivable – EUR | 10,146,088.65 | 14,486,253.87 |
| Accounts receivable – GBP | 159,686.36 | 3,903,339.57 |
| Other receivables – EUR | 48,922,226.79 | 44,240,590.41 |
| Other receivables – GBP | 6,509,874.00 | 6,262,785.00 |
| Accounts payable – USD | 36,960,894.40 | 84,173,482.80 |
| Accounts payable – EUR | 143,633,108.94 | 432,986,458.96 |
| Accounts payable – HKD | 5,562,724.39 | 4,461,943.26 |
| Accounts payable – GBP | 1,158,376.23 | 3,678,469.73 |
| Accounts payable – CHF | 3,520,805.04 | 6,436,395.32 |
| Other payables – EUR | – | 16,712,919.30 |
| Other payables – GBP | 46,046.51 | 308,650.10 |
| Non-current liabilities due within one year – EUR | 801,366,194.41 | 738,026,961.71 |
| Taxes payable – USD | 225,123.47 | 130,496.20 |
| Taxes payable – EUR | – | 2,566,995.88 |
| Taxes payable – HKD | 412,243.78 | 422,650.29 |
| Taxes payable – GBP | 706,612.48 | 693,004.03 |
| Long-term loans – EUR | – | 726,368,368.00 |
---
## (b) Foreign currency assets and liabilities of the Group denominated in USD
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Cash at bank and in hand – RMB | 4,097,384,175.59 | 4,112,442,816.21 |
| Cash at bank and in hand – EUR | 440,982.53 | 53,825.80 |
| Cash at bank and in hand – HKD | 22,926.91 | 26,442.03 |
| Cash at bank and in hand – GBP | 340,440.18 | 36,919.05 |
| Accounts receivable – RMB | 7,374,607.03 | 4,521,300.00 |
| Other receivables – RMB | 538,571.74 | 2,565,461.94 |
| Accounts payable – RMB | 600,555,055.43 | 3,277,306.47 |
| Accounts payable – EUR | 4,721,859.26 | 4,566,824.52 |
| Accounts payable – GBP | 235,505.35 | 231,230.01 |
| Other payables – RMB | 413,899,565.49 | 370,762,084.60 |
| Other payables – HKD | 22,760.64 | 30,374.65 |
| Employee benefits payable – RMB | 1,071,793.40 | 1,502,472.43 |
| Short-term loans – RMB | 213,370,358.15 | 803,468,877.21 |
| Long-term loans – RMB | – | 488,050,419.28 |
| Taxes payable – RMB | 18,231,669.79 | 4,520,781.38 |
| Non-current liabilities due within one year – RMB | 2,514,727.05 | 71,074,521.80 |
| Provisions – RMB | 1,381,275,714.35 | 1,238,436,456.90 |
| Lease liabilities – RMB | 3,302,673.77 | – |
The management of the Group pays close attention to the influence of exchange rate fluctuations on the foreign exchange risk of the Group, and would consider hedging significant foreign exchange risk when necessary.
### Sensitivity analysis of exchange rate risks
Assuming that all risk variables other than the exchange rate remain unchanged, as at December 31, 2025, if a foreign currency appreciated/depreciated by 5% against RMB as the reporting currency, profit before taxation of the Group would decrease or increase by RMB43,460,687.92 (December 31, 2024: decrease or increase by RMB95,199,175.23); if a foreign currency appreciated/depreciated by 5% against USD as the reporting currency, profit before taxation of the Group would increase or decrease by RMB73,345,001.07 (December 31, 2024: increase or decrease by RMB56,686,270.79).
## (2) Interest rate risk – risk of changes in cash flow
The Group’s risk of changes in cash flow of financial instruments which arise from changes in interest rates is mainly associated with bank loans at floating rate (see Note (V) 21, 29 and 31 for details). The Group continues to closely monitor the impact of interest rate changes on the Group’s interest rate risk. The policies of the Group aim at maintaining the floating rates of these loans and there is not any interest rate swap arrangement at present.
### Sensitivity analysis of interest rate risk
As at December 31, 2025, with other variables unchanged, if interest rate increased or decreased by 1%, profit before taxation of bank loans (including short-term loans, long-term loans and non-current liabilities due within one year) held by the Group would decrease or increase by RMB1,919,955,756.53 (December 31, 2024: decrease or increase by RMB1,860,074,192.99).
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (3) Credit risk
On the balance sheet date, the maximum exposure to credit risk that may cause financial losses to the Group mainly arises from the losses incurred to the financial assets of the Group due to the failure of the other party to perform its obligations, which specifically include:
The carrying amount of the financial assets recognized in the consolidated balance sheet. For financial instruments measured at fair value, the book value reflects its risk exposure, but it is not the maximum risk exposure, and its maximum risk exposure will vary in line with future changes in fair value.
In order to reduce credit risk, the Group reviews the collection of receivables on each balance sheet date to ensure that adequate provision for expected credit loss is made for relevant financial assets. As a result, the management of the Group believes that the credit risk assumed by the Group has been significantly reduced.
The Group had taken necessary measures to make sure all customers have a good credit record. Except the top five accounts receivables, the Group had no other significant credit risk exposure concentrated at a single financial asset or a portfolio of financial assets with similar characteristics.
### Accounts receivable from the top five customers for December 31, 2025
| Item | December 31, 2025 Carrying balance |
| :--- | ---: |
| Accounts receivable – Guangdong Power Grid Co., Ltd. (廣東電網有限責任公司) | 3,597,907,838.25 |
| Accounts receivable – State Grid Fujian Electric Power Co., Ltd. | 1,040,693,270.94 |
| Accounts receivable – Guangxi Power Grid Co., Ltd. | 779,912,000.00 |
| Accounts receivable – CGN Cangnan Second Nuclear Power Co., Ltd. (中廣核蒼南第二核電有限公司) | 406,036,704.83 |
| Accounts receivable – CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 367,458,743.26 |
| **Total** | **6,192,008,557.28** |
### Accounts receivable from the top five customers for December 31, 2024
| Item | December 31, 2024 Carrying balance |
| :--- | ---: |
| Accounts receivable – Guangdong Power Grid Co., Ltd. (廣東電網有限責任公司) | 3,977,344,339.89 |
| Accounts receivable – State Grid Fujian Electric Power Co., Ltd. | 1,194,286,638.94 |
| Accounts receivable – Guangxi Power Grid Co., Ltd. | 1,050,212,400.00 |
| Accounts receivable – CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 641,845,443.06 |
| Accounts receivable – CGN Shanwei New Energy Co., Ltd. (中廣核汕尾新能源有限公司) | 562,905,105.17 |
| **Total** | **7,426,593,927.06** |
---
# (4) Liquidity risk
In the management of the liquidity risk, the Group monitors and maintains a level of cash and cash equivalents deemed adequate by the management to finance the Group’s operations and mitigate the effects of fluctuations in cash flows. The management of the Group monitors the utilization of bank loans and ensures compliance with loan agreements.
As at December 31, 2025, the current liabilities of the Group exceeded the current assets by RMB39,870,700,371.90. The Group had unutilized loan facilities from banks and other financial institutions equivalent to RMB432,230,148,452.48 in total, including loan facilities with a term of more than 12 months of RMB265,856,789,140.66. The management of the Group is of the view that the Group would have adequate financial resources to settle the financial obligations and commitments in future. Therefore, the financial statements have been prepared on the basis of going concern.
The following is the maturity analysis for financial liabilities held by the Group which is based on undiscounted remaining contractual obligations:
| Item | Within 1 year (December 31, 2025) | 1 to 5 years (December 31, 2025) | More than 5 years (December 31, 2025) | Total (December 31, 2025) | Book value on the balance sheet |
| :--- | :--- | :--- | :--- | :--- | :--- |
| **Non-derivative financial liabilities:** | | | | | |
| Short-term loans | 42,823,636,345.56 | – | – | 42,823,636,345.56 | 42,151,119,949.93 |
| Bills payable | 6,686,401,730.25 | – | – | 6,686,401,730.25 | 6,686,401,730.25 |
| Accounts payable | 20,236,601,119.62 | – | – | 20,236,601,119.62 | 20,236,601,119.62 |
| Other payables | 9,551,632,550.49 | – | – | 9,551,632,550.49 | 9,551,632,550.49 |
| Non-current liabilities due within one year | 31,707,634,701.68 | – | – | 31,707,634,701.68 | 30,982,569,519.49 |
| Long-term loans | 4,536,018,417.36 | 91,019,755,365.90 | 131,402,855,637.05 | 226,958,629,420.31 | 190,203,390,940.15 |
| Bonds payable | 109,538,630.14 | 5,123,051,835.62 | 4,951,013,698.63 | 10,183,604,164.39 | 9,666,397,858.16 |
| Lease liabilities | – | 559,668,047.38 | 290,051,267.78 | 849,719,315.16 | 756,690,282.72 |
## 2. Transfer of financial assets
1. As at December 31, 2025, the Group did not have financial assets that have been transferred but not derecognized.
2. As at December 31, 2025, the Group did not have financial assets that have been derecognized but continued its involvement in transferred financial assets.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (X) DISCLOSURE OF FAIR VALUE
### 1. Closing fair value of assets and liabilities measured at fair value
**December 31, 2025**
| Item | Level 1 fair value measurement | Level 2 fair value measurement | Level 3 fair value measurement | Total |
| :--- | :--- | :--- | :--- | :--- |
| **Recurring fair value measurement** | | | | |
| Other investment in equity instruments | -- | 696,969,300.00 | 132,067,370.13 | 829,036,670.13 |
| **Total assets continuously measured at fair value** | -- | 696,969,300.00 | 132,067,370.13 | 829,036,670.13 |
**December 31, 2024**
| Item | Level 1 fair value measurement | Level 2 fair value measurement | Level 3 fair value measurement | Total |
| :--- | :--- | :--- | :--- | :--- |
| **Recurring fair value measurement** | | | | |
| Other investment in equity instruments | -- | 529,649,700.00 | 132,067,370.13 | 661,717,070.13 |
| **Total assets continuously measured at fair value** | -- | 529,649,700.00 | 132,067,370.13 | 661,717,070.13 |
| Foreign currency forward contracts | -- | (6,322,000.00) | -- | (6,322,000.00) |
| **Total liabilities continuously measured at fair value** | -- | (6,322,000.00) | -- | (6,322,000.00) |
---
# 2. Qualitative and quantitative information of valuation techniques and important parameters adopted for recurring level 2 fair value measurements
| Item | Fair value at December 31, 2025 | Fair value at December 31, 2024 | Valuation technique | Inputs |
| :--- | :--- | :--- | :--- | :--- |
| Other investment in equity instruments | 696,969,300.00 | 529,649,700.00 | Market method | Net profit attributable to the parent company during the reporting period, non-operational assets, average price-earnings ratio of comparable companies, liquidity discount ratio of the investee |
| Foreign currency forward contracts | - | (6,322,000.00) | Income approach | Forward exchange rate |
# 3. Qualitative and quantitative information of valuation techniques and important parameters adopted for recurring level 3 fair value measurements
| Item | Fair value at December 31, 2025 | Fair value at December 31, 2024 | Valuation technique | Inputs |
| :--- | :--- | :--- | :--- | :--- |
| Other investment in equity instruments | 132,067,370.13 | 132,067,370.13 | Cost method | Investment costs |
# 4. Reconciliation between the opening and closing carrying amount for recurring level 3 fair value measurements
There was no transfer in or out between different levels for the above-mentioned assets and liabilities continuously measured at fair value of the Group during the year.
# 5. Fair value of financial assets and financial liabilities not measured at fair value
The management of the Group believes that the book values of financial assets and financial liabilities measured at amortized cost in the financial statements are close to the fair values of the same.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (XI) RELATED PARTIES AND RELATED PARTY TRANSACTIONS
### 1. Parent company of the Company
| Name of parent company | Place of registration | Business nature | Registered capital | Shareholding of the parent company in the Company | Voting rights of the parent company in the Company |
| :--- | :--- | :--- | :--- | :--- | :--- |
| CGNPC | Shenzhen | Nuclear power industry | RMB14,917.514829 million | 58.89% | 58.89% |
The parent company of the Company is CGNPC. The ultimate actual controlling shareholder is the SASAC.
### 2. Subsidiaries of the Company
Details of the subsidiaries of the Company are set out in Note (VIII) 1.
### 3. Joint ventures and associates of the Company
Details of the significant associates of the Company are set out in Note (VIII) 2.
Other joint ventures or associates which conduct related party transactions with the Group, or have balance arising from related party transactions with the Group in prior periods are as follows:
| Name of company | Relationship with the Company |
| :--- | :--- |
| Ningde Second Nuclear | Joint venture |
| Hongyanhe Nuclear | Associate |
| China Nuclear Industry Second and Third Construction Co., Ltd. (中國核工業二三建設有限公司) | Associate |
| CIECC Engineering Company Limited (中諮工程有限公司) | Associate |
| CGN Finance | Associate, under the control of the same party |
| CGN Fund Phase I | Associate, a non-controlling shareholder with significant influence on subsidiaries |
---
# 4. Other related parties
| Name of other related parties | Relationship with the Company |
| :--- | :--- |
| CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | Under the control of the same party |
| CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | Under the control of the same party |
| CGNPC International Limited (中廣核國際有限公司) and its subsidiaries | Under the control of the same party |
| CGN Services Group Co., Ltd. (中廣核服務集團有限公司) (“CGN Services Group”) and its subsidiaries | Under the control of the same party |
| CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | Under the control of the same party |
| CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | Under the control of the same party |
| CGN Cangnan Second Nuclear Power Co., Ltd. (中廣核蒼南第二核電有限公司) | Under the control of the same party |
| CGN Capital Holdings Co., Ltd. (中廣核資本控股有限公司) and its subsidiaries | Under the control of the same party |
| Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | Under the control of the same party |
| CGNPC Uranium Resources Co., Ltd. and its subsidiaries | Under the control of the same party |
| CGN Wind Energy Co., Ltd. and its subsidiaries | Under the control of the same party |
| Xianning Nuclear Power Co., Ltd. (咸寧核電有限公司) | Under the control of the same party |
| Lingwan Nuclear Power Co., Ltd. (嶺灣核電有限公司) | Under the control of the same party |
| Anhui Wuhu Nuclear Power Co., Ltd. (安徽蕪湖核電有限公司) | Under the control of the same party |
| CGN Yuanhang Investment (Shenzhen) Partnership (Limited Partnership) (中廣核遠航投資(深圳)合夥企業(有限合夥)) | Under the control of the same party |
| CGN Shared Services (Shenzhen) Co., Ltd. (中廣核共享服務(深圳)有限公司) | Under the control of the same party |
| HKNIC | Non-controlling shareholders with significant influence on subsidiaries |
| China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | Non-controlling shareholders with significant influence on subsidiaries |
| EDF International and its subsidiaries | Non-controlling shareholders with significant influence on subsidiaries |
| Datang International and its subsidiaries | Non-controlling shareholders with significant influence on subsidiaries |
| Hualong Pressurized Water Reactor Technology Corporation, Ltd. (華龍國際核電技術有限公司) | A joint venture of the ultimate controlling party |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 5. Related party transactions
### (1) Related party transactions for purchase and sale of goods, rendering and acceptance of services:
**Purchase of goods/Acceptance of services:**
| Related party | Related party transaction | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| CGNPC Uranium Resources Co., Ltd. and its subsidiaries | Purchase of goods/acceptance of services | 9,892,804,305.29 | 9,293,341,987.93 |
| CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | Purchase of goods/acceptance of services | 2,894,807,611.46 | 2,432,725,375.94 |
| China Nuclear Industry Second and Third Construction Co., Ltd. (中國核工業二三建設有限公司) | Purchase of goods/acceptance of services | 2,396,332,153.55 | 2,266,438,916.00 |
| CGN Services Group and its subsidiaries | Purchase of goods/acceptance of services | 2,036,453,284.49 | 1,878,145,589.13 |
| EDF International and its subsidiaries | Purchase of goods/acceptance of services | 1,185,239,134.38 | 1,432,360,073.23 |
| Hualong Pressurized Water Reactor Technology Corporation, Ltd. (華龍國際核電技術有限公司) | Purchase of goods/acceptance of services | 271,579,245.30 | 229,361,802.90 |
| CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | Purchase of goods/acceptance of services | 230,590,357.68 | 157,308,838.34 |
| Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | Purchase of goods/acceptance of services | 226,268,102.40 | 146,407,581.67 |
| Datang International and its subsidiaries | Purchase of goods/acceptance of services | 140,364,208.96 | 116,921,090.32 |
| CIECC Engineering Company Limited (中諮工程有限公司) | Purchase of goods/acceptance of services | 100,192,896.56 | 58,751,196.50 |
| China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | Purchase of goods/acceptance of services | 36,583,320.02 | 35,415,188.68 |
| CGN Shared Services (Shenzhen) Co., Ltd. (中廣核共享服務(深圳)有限公司) | Purchase of goods/acceptance of services | 30,914,348.08 | – |
| CGN Wind Energy Co., Ltd. and its subsidiaries | Purchase of goods/acceptance of services | 30,789,832.38 | 18,153,513.73 |
| CGNPC | Purchase of goods/acceptance of services | 24,431,671.82 | – |
| Hongyanhe Nuclear | Purchase of goods/acceptance of services | 23,721,835.12 | 27,339,240.67 |
| Others | Purchase of goods/acceptance of services | 7,538,109.03 | 10,245,052.35 |
| **Total** | | **19,528,610,416.52** | **18,102,915,447.39** |
---
# Sale of goods/Rendering of services:
| Related party | Related party transaction | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| HKNIC | Sales of electricity | 6,194,685,126.90 | 6,052,830,098.86 |
| Hongyanhe Nuclear | Sale of goods/rendering of services | 1,001,953,715.42 | 976,441,687.40 |
| CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | Sale of goods/rendering of services | 196,734,117.48 | 107,304,702.58 |
| CGN Wind Energy Co., Ltd. and its subsidiaries | Sale of goods/rendering of services | 129,970,348.89 | 94,607,536.93 |
| CGNPC Uranium Resources Co., Ltd. and its subsidiaries | Sale of goods/rendering of services | 76,121,833.46 | 79,667,528.66 |
| CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | Sale of goods/rendering of services | 60,560,652.93 | 14,330,293.75 |
| Ningde Second Nuclear | Sale of goods/rendering of services | 23,090,974.95 | 14,094,504.38 |
| CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | Sale of goods/rendering of services | 22,473,139.64 | 5,646,452.11 |
| CGNPC International Limited (中廣核國際有限公司) and its subsidiaries | Sale of goods/rendering of services | 20,665,874.55 | 10,578,171.31 |
| Others | Sale of goods/rendering of services | 27,056,120.68 | 21,544,458.45 |
| **Total** | | **7,753,311,904.90** | **7,377,045,434.43** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## Provision of construction, installation and design services:
| Related party | Related party transaction | 2025 | 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | Provision of construction, installation and design services | 6,741,457,289.86 | 9,154,341,058.69 |
| CGN Cangnan Second Nuclear Power Co., Ltd. (中廣核蒼南第二核電有限公司) | Provision of construction, installation and design services | 1,967,932,692.37 | 87,549,808.84 |
| Ningde Second Nuclear | Provision of construction, installation and design services | 1,580,028,924.79 | 981,078,198.97 |
| China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | Provision of construction, installation and design services | 329,369,782.51 | – |
| CGN Wind Energy Co., Ltd. and its subsidiaries | Provision of construction, installation and design services | 317,297,927.96 | 120,807,664.07 |
| CGNPC International Limited (中廣核國際有限公司) and its subsidiaries | Provision of construction, installation and design services | 20,659,909.23 | – |
| Hongyanhe Nuclear | Provision of construction, installation and design services | 20,070,756.93 | 178,427,181.83 |
| Others | Provision of construction, installation and design services | 2,783,859.02 | 4,163,593.79 |
| **Total** | | **10,979,601,142.67** | **10,526,367,506.19** |
---
# (2) Related party transactions for leasing
## The Group as lessor:
| Name of lessee | Type of leased assets | Rental income recognized in 2025 | Rental income recognized in 2024 |
| :--- | :--- | :--- | :--- |
| CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | Buildings | 18,018,928.27 | 3,910,616.17 |
| CGN Services Group and its subsidiaries | Buildings | 5,653,539.80 | 3,543,388.30 |
| Hongyanhe Nuclear | Buildings | 521,203.53 | 1,612,335.61 |
| Others | Buildings | 131,225.94 | 143,222.39 |
| **Total** | | **24,324,897.54** | **9,209,562.47** |
## The Group as lessee:
| Name of lessor | Type of leased assets | Transaction amount recognized in 2025 (Note) | Transaction amount recognized in 2024 (Note) (Restated) |
| :--- | :--- | :--- | :--- |
| CGNPC | Buildings | 94,429,996.25 | 85,486,648.57 |
| CGN Services Group and its subsidiaries | Buildings | 49,144,278.26 | 66,193,825.94 |
| CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | Buildings | 13,191,679.82 | 3,966,582.92 |
| Others | Buildings | 4,159,018.08 | 1,333,931.86 |
| **Total** | | **160,924,972.41** | **156,980,989.29** |
Note: Transaction amount includes the lease principal paid, handling fees and interest.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (3) Related party transactions for funds lending
| Related party | Amount borrowed | Start date | Expiry date |
| :--- | :--- | :--- | :--- |
| **Borrowing from** | | | |
| CGN Finance | 20,780,990,435.37 | Irregular | Irregular |
| CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | 750,000,000.00 | Irregular | Irregular |
| CGNPC | 5,776,040,000.00 | 2024-10-25 | 2026-09-27 |
| CGN Yuanhang Investment (Shenzhen) Partnership (Limited Partnership) (中廣核遠航投資(深圳)合夥企業(有限合夥)) | 3,592,210,000.00 | 2025-06-10 | 2035-06-09 |
| **Total** | **30,899,240,435.37** | | |
| Related party | Amount repaid | Repayment date |
| :--- | :--- | :--- |
| **Repayment to** | | |
| CGN Finance | 17,956,164,887.17 | Irregular |
| CGNPC | 1,122,760,000.00 | Irregular |
| CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | 8,465,810.12 | Irregular |
| **Total** | **19,087,390,697.29** | |
## (4) Related party transactions for asset transfer
| Related party | Related party transaction | 2025 | 2024 |
| :--- | :--- | :--- | :--- |
| CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | Disposal of subsidiaries | - | 93,467,975.14 |
| CGNPC | Acquisition of equity interest in subsidiaries | 11,961,058,100.00 | - |
## (5) Emoluments for key management
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Emoluments for key management | 10,311,849.48 | 10,934,800.00 |
---
The remuneration of each director in 2025 is as follows:
| | Directors' salaries | Wages and allowances | Bonus | Retirement benefits | Total |
| :--- | :---: | :---: | :---: | :---: | :---: |
| **Chairman and non-executive director** | | | | | |
| Yang Changli | — | — | — | — | — |
| **Executive director** | | | | | |
| Gao Ligang (Note 1 Note 1: Resigned on December 11, 2025.) | — | 326,142.18 | 1,477,354.00 | 123,648.34 | 1,927,144.52 |
| Pang Songtao (Note 2 Note 2: Re-designated from non-executive director to executive director on December 11, 2025.) | — | 31,996.67 | 27,188.00 | 11,615.33 | 70,800.00 |
| **Non-executive directors** | | | | | |
| Li Li | — | — | — | — | — |
| Feng Jian | — | — | — | — | — |
| Liu Huanbing | — | — | — | — | — |
| **Independent non-executive directors** | | | | | |
| Wong Ming Fung | 100,000.00 | — | — | — | 100,000.00 |
| Li Fuyou | 100,000.00 | — | — | — | 100,000.00 |
| Xu Hua | 100,000.00 | — | — | — | 100,000.00 |
| **Total** | 300,000.00 | 358,138.85 | 1,504,542.00 | 135,263.67 | 2,297,944.52 |
**Note 1: Resigned on December 11, 2025.**
**Note 2: Re-designated from non-executive director to executive director on December 11, 2025.**
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## The remuneration of each director in 2024 is as follows:
| | Directors’ salaries | Wages and allowances | Bonus | Retirement benefits | Total |
|---|---|---|---|---|---|
| **Chairman and non-executive director** | | | | | |
| Yang Changli | – | – | – | – | – |
| **Executive director** | | | | | |
| Gao Ligang | – | 382,845.00 | 705,916.00 | 141,308.00 | 1,230,069.00 |
| **Non-executive directors** | | | | | |
| Li Li | – | – | – | – | – |
| Pang Songtao | – | – | – | – | – |
| Feng Jian | – | – | – | – | – |
| Liu Huanbing | – | – | – | – | – |
| **Independent non-executive directors** | | | | | |
| Wong Ming Fung | 70,000.00 | – | – | – | 70,000.00 |
| Li Fuyou | 100,000.00 | – | – | – | 100,000.00 |
| Xu Hua | 70,000.00 | – | – | – | 70,000.00 |
| **Total** | 240,000.00 | 382,845.00 | 705,916.00 | 141,308.00 | 1,470,069.00 |
## The remuneration of each member of senior management in 2025 is as follows:
| | Senior management’s salaries | Wages and allowances | Bonus | Retirement benefits | Total |
|---|---|---|---|---|---|
| **Senior management** | | | | | |
| Yin Engang | – | 682,121.52 | 1,206,789.00 | 130,817.88 | 2,019,728.40 |
| Qin Yuxin | – | 715,933.52 | 1,126,655.00 | 135,095.64 | 1,977,684.16 |
| Zhou Jianping | – | 716,886.52 | 1,247,094.00 | 135,118.68 | 2,099,099.20 |
| Liu Haijun | – | 715,956.52 | 1,066,318.00 | 135,118.68 | 1,917,393.20 |
| **Total** | – | 2,830,898.08 | 4,646,856.00 | 536,150.88 | 8,013,904.96 |
## The remuneration of each member of senior management in 2024 is as follows:
| | Senior management’s salaries | Wages and allowances | Bonus | Retirement benefits | Total |
|---|---|---|---|---|---|
| **Senior management** | | | | | |
| Yin Engang | – | 679,536.00 | 447,329.00 | 123,900.00 | 1,250,765.00 |
| Qin Yuxin | – | 705,926.00 | 1,409,975.00 | 129,349.00 | 2,245,250.00 |
| Zhou Jianping | – | 714,041.00 | 481,854.00 | 128,201.00 | 1,324,096.00 |
| Liu Haijun | – | 714,613.00 | 881,420.00 | 128,201.00 | 1,724,234.00 |
| **Total** | – | 2,814,116.00 | 3,220,578.00 | 509,651.00 | 6,544,345.00 |
---
For the years 2025 and 2024, the five highest paid individuals were not the directors of the Group:
The remuneration of five highest paid individuals is as follows:
Unit: RMB
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Wages and allowances | 3,978,258.90 | 4,092,955.23 |
| Bonus | 8,623,263.50 | 8,397,687.70 |
| Retirement benefits | 683,961.60 | 622,684.97 |
| **Total** | **13,285,484.00** | **13,113,327.90** |
The above wages and allowances mainly include basic salaries and comprehensive subsidies. Bonuses are determined based on the performance of the Group and individuals.
The remuneration of five highest paid individuals by band:
| HKD (dollar) Lower limit | HKD (dollar) Upper limit | Equivalent to RMB (yuan) Lower limit | Equivalent to RMB (yuan) Upper limit | Number of individuals in 2025 | Number of individuals in 2024 |
| :--- | :--- | :--- | :--- | :--- | :--- |
| 2,000,001.00 | 2,500,000.00 | 1,806,400.00 | 2,258,100.00 | - | 1 |
| 2,500,001.00 | 3,000,000.00 | 2,258,100.00 | 2,709,700.00 | 4 | 3 |
| 3,000,001.00 | 3,500,000.00 | 2,709,700.00 | 3,161,300.00 | 1 | 1 |
| **Total** | | | | **5** | **5** |
In 2025 and 2024, the Group did not pay any directors or the five highest paid individuals as incentives or resignation compensation for joining the Group or when joining the Group. No director had waived any remuneration.
# (6) Other related party transactions
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Interest income – CGN Finance | 213,354,460.64 | 265,989,031.88 |
| Interest income – others | 30,396.48 | 775.63 |
| **Total** | **213,384,857.12** | **265,989,807.51** |
| Interest expenses – CGN Finance | 523,773,555.53 | 379,422,470.59 |
| Interest expenses – CGNPC | 88,222,048.14 | 38,184,240.20 |
| Interest expenses – CGN Yuanhang Investment (Shenzhen) Partnership (Limited Partnership) (中廣核遠航投資(深圳)合夥企業(有限合夥)) | 50,116,318.69 | - |
| Interest expenses – CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | 131,875.00 | 12,845.61 |
| Interest expenses – CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | 2,714.09 | - |
| Interest expenses – Hualong Pressurized Water Reactor Technology Corporation, Ltd. (華龍國際核電技術有限公司) | - | 1,921,111.10 |
| **Total** | **662,246,511.45** | **419,540,667.50** |
| Fee expenses – CGN Finance | 393,637.51 | 816,306.06 |
| Fee rebate – CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | 4,911.60 | 11,576.39 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 6. Amounts due from/due to related parties
### (1) Receivables
| Item name | Related party | Carrying balance (December 31, 2025) | Bad debt provisions (December 31, 2025) | Carrying balance (December 31, 2024 (Restated)) | Bad debt provisions (December 31, 2024 (Restated)) |
| :--- | :--- | :--- | :--- | :--- | :--- |
| Cash at bank and in hand | CGN Finance | 20,469,994,598.37 | - | 16,656,849,676.88 | - |
| | CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | 37,486,099.32 | - | 31,686,736.11 | - |
| **Total** | | **20,507,480,697.69** | **-** | **16,688,536,412.99** | **-** |
| Accounts receivable | CGN Wind Energy Co., Ltd. and its subsidiaries | 678,156,203.02 | 4,372,822.81 | 866,402,293.97 | 4,823,829.30 |
| | CGN Cangnan Second Nuclear Power Co., Ltd. (中廣核蒼南第二核電有限公司) | 406,036,704.83 | 1,218,110.11 | 12,650,631.11 | 37,951.89 |
| | CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 367,458,743.26 | 1,339,695.76 | 641,845,443.06 | 2,145,378.67 |
| | HKNIC | 344,604,042.65 | 1,033,812.13 | 410,886,569.24 | 1,232,659.65 |
| | Hongyanhe Nuclear | 334,376,611.91 | 6,716,997.67 | 471,011,811.58 | 6,635,682.31 |
| | CGNPC Uranium Resources Co., Ltd. and its subsidiaries | 48,861,545.25 | 2,749,818.34 | 57,918,587.33 | 1,891,572.04 |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 28,596,096.80 | 953,057.73 | 19,269,555.39 | 825,298.88 |
| | CGNPC International Limited (中廣核國際有限公司) and its subsidiaries | 23,853,541.68 | 229,778.31 | 28,841,015.49 | 1,815,128.53 |
| | CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | 21,004,959.40 | 197,001.52 | 5,236,621.44 | 38,302.70 |
| | Ningde Second Nuclear | 20,245,016.01 | 552,779.30 | 106,301,741.53 | 318,905.23 |
| | CGN Services Group and its subsidiaries | 9,505,081.34 | 119,694.25 | 9,636,194.66 | 232,446.69 |
| | CGNPC | 6,626,200.00 | 19,053.60 | 12,127,069.69 | 1,521,381.21 |
| | Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | 6,581,971.44 | 282,047.95 | 11,586,564.34 | 67,316.54 |
| | China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | 4,836,109.75 | 14,508.31 | - | - |
| | Others | 3,213,800.49 | 9,641.39 | 3,144,180.68 | 9,432.55 |
| **Total** | | **2,303,956,627.83** | **19,808,819.18** | **2,656,858,279.51** | **21,595,286.19** |
---
| Item name | Related party | December 31, 2025 Carrying balance | December 31, 2025 Bad debt provisions | December 31, 2024 (Restated) Carrying balance | December 31, 2024 (Restated) Bad debt provisions |
| :--- | :--- | :--- | :--- | :--- | :--- |
| **Prepayments** | CGNPC Uranium Resources Co., Ltd. and its subsidiaries | 13,091,612,303.14 | - | 10,058,861,726.44 | - |
| | EDF International and its subsidiaries | 406,116,238.62 | - | 348,798,302.13 | - |
| | China Nuclear Industry Second and Third Construction Co., Ltd. (中國核工業二三建設有限公司) | 279,563,370.82 | - | 450,827,273.90 | - |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 200,722,697.93 | - | 175,122,650.21 | - |
| | CGN Services Group and its subsidiaries | 41,058,466.18 | - | 35,347,346.97 | - |
| | China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | 10,188,679.25 | - | 4,560,630.00 | - |
| | Others | 6,057,075.48 | - | 2,813,995.56 | - |
| | **Total** | **14,035,318,831.42** | **-** | **11,076,331,925.21** | **-** |
| **Contract assets** | CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 1,206,967,697.82 | 3,547,915.27 | 233,418,650.94 | 700,255.95 |
| | Xianning Nuclear Power Co., Ltd. (咸寧核電有限公司) | 138,694,377.66 | 416,083.13 | 138,681,326.42 | 416,043.98 |
| | CGN Wind Energy Co., Ltd. and its subsidiaries | 128,312,961.16 | 403,355.49 | 403,707,883.18 | 1,211,123.64 |
| | China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | 27,106,837.28 | 81,320.51 | 302,400.00 | 907.20 |
| | Hongyanhe Nuclear | 613,947.55 | 1,841.84 | 1,082,644,600.61 | 3,247,933.80 |
| | Others | 417,344.82 | 1,252.03 | 2,188,081.90 | 6,564.24 |
| | **Total** | **1,502,113,166.29** | **4,451,768.27** | **1,860,942,943.05** | **5,582,828.81** |
| **Other receivables** | CGN Services Group and its subsidiaries | 8,619,545.92 | 295,826.00 | 10,901,173.05 | 490,208.31 |
| | CIECC Engineering Company Limited (中諮工程有限公司) | 3,842,791.68 | 447,317.71 | 3,842,791.68 | 192,139.58 |
| | Hongyanhe Nuclear | 1,784,976.03 | 5,354.93 | - | - |
| | CGN Shared Services (Shenzhen) Co., Ltd. (中廣核共享服務(深圳)有限公司) | 1,479,087.60 | 4,437.26 | - | - |
| | CGN Fund Phase I | - | - | 300,922,562.40 | 902,767.69 |
| | Others | 2,859,128.50 | 41,410.81 | 3,045,852.51 | 8,854.26 |
| | **Total** | **18,585,529.73** | **794,346.71** | **318,712,379.64** | **1,593,969.84** |
| **Other non-current assets** | CGNPC Uranium Resources Co., Ltd. and its subsidiaries | 1,047,408,000.00 | - | 1,977,362,700.12 | - |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 8,629,307.68 | - | 11,472,112.60 | - |
| | CGN Services Group and its subsidiaries | 7,160,941.45 | - | 714,156.48 | - |
| | Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | 1,302,653.86 | - | 6,708,224.72 | - |
| | CGN Wind Energy Co., Ltd. and its subsidiaries | 666,700.60 | - | - | - |
| | **Total** | **1,065,167,603.59** | **-** | **1,996,257,193.92** | **-** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Payables
| Item name | Related party | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| **Accounts payable** | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 1,183,796,885.54 | 780,136,399.27 |
| | CGN Services Group and its subsidiaries | 663,439,209.06 | 502,664,207.42 |
| | CGNPC Uranium Resources Co., Ltd. and its subsidiaries | 422,948,683.29 | 712,428,818.05 |
| | China Nuclear Industry Second and Third Construction Co., Ltd. (中國核工業二三建設有限公司) | 310,304,311.85 | 349,090,202.08 |
| | EDF International and its subsidiaries | 246,292,527.11 | 467,742,672.88 |
| | Hualong Pressurized Water Reactor Technology Corporation, Ltd. (華龍國際核電技術有限公司) | 224,418,867.93 | 140,849,056.59 |
| | Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | 123,514,297.79 | 104,364,296.25 |
| | CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | 91,766,457.93 | 79,359,732.97 |
| | CGNPC | 38,304,009.31 | 64,244,600.06 |
| | CIECC Engineering Company Limited (中諮工程有限公司) | 27,642,742.52 | 21,633,395.13 |
| | Datang International and its subsidiaries | 23,580,298.98 | 19,559,001.21 |
| | CGN Shared Services (Shenzhen) Co., Ltd. (中廣核共享服務(深圳)有限公司) | 14,522,838.65 | – |
| | CGN Wind Energy Co., Ltd. and its subsidiaries | 12,288,427.59 | 9,419,305.65 |
| | China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | 12,134,945.33 | 27,239,384.61 |
| | Hongyanhe Nuclear | 6,769,931.97 | 11,177,941.25 |
| | CGNPC International Limited (中廣核國際有限公司) and its subsidiaries | 6,113,846.49 | 9,140,495.86 |
| | Others | 110,640.00 | 7,229,462.82 |
| | **Total** | **3,407,948,921.34** | **3,306,278,972.10** |
| **Contract liabilities** | CGN Cangnan Second Nuclear Power Co., Ltd. (中廣核蒼南第二核電有限公司) | 2,480,764,048.31 | 771,530,945.11 |
| | Ningde Second Nuclear | 1,750,187,134.43 | 2,227,134,345.99 |
| | Hongyanhe Nuclear | 361,260,624.29 | 326,739,969.26 |
| | CGN Wind Energy Co., Ltd. and its subsidiaries | 151,520,984.01 | 466,841,823.18 |
| | CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 119,399,991.58 | 104,307,733.72 |
| | Xianning Nuclear Power Co., Ltd. (咸寧核電有限公司) | 40,185,949.97 | 40,237,729.01 |
| | CGNPC | 26,955,915.07 | 37,169,523.57 |
| | CGNPC Uranium Resources Co., Ltd. and its subsidiaries | 11,667,726.43 | 838,617.89 |
| | Lingwan Nuclear Power Co., Ltd. (嶺灣核電有限公司) | 8,560,246.21 | 12,085,554.04 |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 3,691,673.32 | – |
| | CGNPC International Limited (中廣核國際有限公司) and its subsidiaries | 3,644,665.87 | 26,308,392.90 |
| | Others | 293,788.44 | 317,576.36 |
| | **Total** | **4,958,132,747.93** | **4,013,512,211.03** |
---
| Item name | Related party | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| **Short-term loans** | CGN Finance | 4,570,006,605.78 | 6,333,783,505.86 |
| | CGNPC | 3,788,386,866.00 | 92,954,892.98 |
| | CGNPC Huasheng Investment Limited (中廣核華盛投資有限公司) | 750,131,875.00 | – |
| | **Total** | **9,108,525,346.78** | **6,426,738,398.84** |
| **Long-term loans** | CGN Finance | 15,262,333,122.66 | 11,177,123,695.64 |
| | CGNPC | 1,910,000,000.00 | 1,000,000,000.00 |
| | CGN Yuanhang Investment (Shenzhen) Partnership (Limited Partnership) (中廣核遠航投資(深圳)合夥企業(有限合夥)) | 3,592,210,000.00 | – |
| | **Total** | **20,764,543,122.66** | **12,177,123,695.64** |
| **Other payables** | CGN Wind Energy Co., Ltd. and its subsidiaries | 140,110,095.07 | 140,766,774.36 |
| | China Energy Construction Group Guangdong Electric Power Design and Research Institute Co. Ltd. (中國能源建設集團廣東省電力設計研究院有限公司) | 65,836,684.05 | 130,674,453.32 |
| | CGNPC | 50,218,629.76 | 40,584,100.85 |
| | CGN Services Group and its subsidiaries | 29,592,200.93 | 32,008,542.55 |
| | EDF International and its subsidiaries | 6,315,684.07 | 7,562.00 |
| | China Nuclear Industry Second and Third Construction Co., Ltd. (中國核工業二三建設有限公司) | 4,182,661.18 | 3,432,661.18 |
| | CGNPC Uranium Resources Co., Ltd. and its subsidiaries | 1,444,937.28 | 1,430,927.75 |
| | CGN Environmental Protection Industry Co., Ltd. (中廣核環保產業有限公司) and its subsidiaries | 1,144,442.56 | 9,636,347.32 |
| | Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | 1,026,811.62 | 1,015,856.62 |
| | Hongyanhe Nuclear | 1,010,908.79 | 1,128,057.20 |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 644,936.24 | 708,973.26 |
| | CIECC Engineering Company Limited (中諮工程有限公司) | 125,500.00 | 125,500.00 |
| | HKNIC | – | 718,846,994.17 |
| | Others | 1,064,055.38 | 1,812,533.21 |
| | **Total** | **302,717,546.93** | **1,082,179,283.79** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
| Item name | Related party | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- | :--- |
| Lease liabilities | CGNPC | 41,939,097.85 | 186,691,251.69 |
| | CGN Services Group and its subsidiaries | 5,032,016.39 | 8,995,247.22 |
| | Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | 1,007,055.05 | – |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 660,138.38 | 34,182,595.98 |
| | Hongyanhe Nuclear | 527,136.76 | – |
| | Others | – | 301,019.88 |
| | **Total** | **49,165,444.43** | **230,170,114.77** |
| Non-current liabilities due within one year | CGNPC | 1,102,767,788.73 | 1,032,154,932.36 |
| | CGN Finance | 1,081,476,017.30 | 575,375,572.05 |
| | CGN Services Group and its subsidiaries | 15,178,454.61 | 8,763,217.51 |
| | CGN Digital Technology Co., Ltd. (中廣核數字科技有限公司) and its subsidiaries | 8,931,144.63 | 21,926,518.65 |
| | Shenzhen Nengzhihui Investment Co., Ltd. (深圳市能之匯投資有限公司) and its subsidiaries | 4,644,785.05 | – |
| | CGN Yuanhang Investment (Shenzhen) Partnership (Limited Partnership) (中廣核遠航投資(深圳)合夥企業(有限合夥)) | 2,689,168.32 | – |
| | Hongyanhe Nuclear | 449,446.13 | – |
| | CGN Wind Energy Co., Ltd. and its subsidiaries | 407,771.04 | – |
| | Others | 153,062.20 | 147,957.68 |
| | **Total** | **2,216,697,638.01** | **1,638,368,198.25** |
# (XII) COMMITMENTS AND CONTINGENCIES
## 1. Important commitments
### Capital commitments
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Commitment of acquisition and construction of long-term assets | 19,055,991,021.94 | 18,243,147,627.16 |
| Large-amount contracts | 141,875,930,248.66 | 81,542,971,134.40 |
| **Total** | **160,931,921,270.60** | **99,786,118,761.56** |
---
## 2. Contingencies
There are no important contingencies that should be disclosed by the Group.
# (XIII) EVENTS AFTER THE BALANCE SHEET DATE
## 1. Profit distribution after the balance sheet date
### Proposed dividends on ordinary shares after the balance sheet date
On March 25, 2026, the Board proposed the Company to distribute cash dividends of RMB0.086 (tax inclusive) per share (2024: RMB0.095 (tax inclusive) per share) to the holders of ordinary shares and it is expected to distribute RMB4,342,880,554.60 (2024: RMB4,797,368,054.50). The proposal is subject to approval at the general meeting. The cash dividends proposed after the balance sheet date were not recognized as liabilities on the balance sheet date.
## 2. Other matters after the balance sheet date
On January 5, 2026, GNIC, a subsidiary of the Company, and China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) entered into the Concerted Party Agreement. China Datang Group Nuclear Power Co., Ltd. (中國大唐集團核電有限公司) agreed to act in concert with GNIC at the shareholders' meetings and the meetings of board of directors of Ningde Second Nuclear. The Group can lead the relevant activities of Ningde Second Nuclear.
The Concerted Party Agreement has taken effect from the date of signing and shall remain in effect for the duration of Ningde Second Nuclear. The Group acquired control of Ningde Second Nuclear from January 5, 2026, and included it in the scope of consolidated financial statements. Ningde Second Nuclear also changed from a joint venture of the Group to a subsidiary of the Group.
# (XIV) OTHER IMPORTANT MATTERS
## 1. Segment report
### (1) Basis and accounting policies of reporting segments
According to the internal organization structure, management requirements and internal reporting system of the Group, the Group's business is divided into 2 reporting segments, namely nuclear power business operation, sales of electricity and related technical services segment, and engineering, construction and related technical services segment. These reporting segments are recognized based on income, nature, business model, etc. The major products and services provided by the reporting segments of the Group are electricity sales, engineering, construction and technical services. The Group's management regularly evaluates the operating results of these segments to determine the resources to be allocated and evaluates its results.
Segment reporting information is disclosed in accordance with the accounting policies and measurement basis adopted for reporting to the management by each segment, which are consistent with the accounting policies and measurement basis for preparing the financial statements.
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (2) Financial information of reporting segments
| Item | Nuclear power business operation, sales of electricity and related technical services segment | Engineering, construction and related technical services segment | Inter-segment eliminations | December 31, 2025/ 2025 |
| :--- | :--- | :--- | :--- | :--- |
| Operating revenue | 64,619,220,734.84 | 33,441,265,244.60 | (22,363,927,005.91) | 75,696,558,973.53 |
| Revenue from external customers | 63,626,848,656.93 | 12,069,710,316.60 | – | 75,696,558,973.53 |
| Revenue from internal segments | 992,372,077.91 | 21,371,554,928.00 | (22,363,927,005.91) | – |
| Operating costs | 40,724,219,449.78 | 32,697,059,853.00 | (21,942,315,574.92) | 51,478,963,727.86 |
| Total assets | 482,036,212,082.30 | 41,529,513,490.24 | (17,909,607,508.63) | 505,656,118,063.91 |
| Total liabilities | 307,055,879,951.33 | 33,328,254,904.25 | (10,942,343,992.09) | 329,441,790,863.49 |
| Income from investment in joint ventures and associates | 1,976,956,628.45 | 238,642,070.53 | 47,490,857.16 | 2,263,089,556.14 |
| Long-term equity investment accounted by using the equity method | 14,507,042,721.39 | 3,237,448,536.92 | (313,357,435.32) | 17,431,133,822.99 |
| Operating profit | 18,400,179,097.02 | 370,735,964.95 | (345,469,457.79) | 18,425,445,604.18 |
| Income tax expenses | 3,895,083,982.70 | 38,741,219.73 | (62,254,214.06) | 3,871,570,988.37 |
| Net profit | 14,690,738,277.96 | 323,621,130.77 | (283,215,243.73) | 14,731,144,165.00 |
| Item | Nuclear power business operation, sales of electricity and related technical services segment (Restated) | Engineering, construction and related technical services segment (Restated) | Inter-segment eliminations (Restated) | December 31, 2024/ 2024 (Restated) |
| :--- | :--- | :--- | :--- | :--- |
| Operating revenue | 68,492,176,270.01 | 30,435,986,597.95 | (19,983,493,244.91) | 78,944,669,623.05 |
| Revenue from external customers | 67,681,727,867.72 | 11,262,941,755.33 | – | 78,944,669,623.05 |
| Revenue from internal segments | 810,448,402.29 | 19,173,044,842.62 | (19,983,493,244.91) | – |
| Operating costs | 39,269,934,160.50 | 29,696,996,073.23 | (19,571,094,152.77) | 49,395,836,080.96 |
| Total assets | 453,914,095,842.20 | 38,236,629,595.69 | (20,618,126,936.63) | 471,532,598,501.26 |
| Total liabilities | 271,480,679,868.53 | 30,638,817,632.11 | (13,531,640,054.04) | 288,587,857,446.60 |
| Income from investment in joint ventures and associates | 1,555,017,999.22 | 256,151,152.28 | 24,715,596.38 | 1,835,884,747.88 |
| Long-term equity investment accounted by using the equity method | 13,029,224,799.68 | 2,977,578,773.79 | (370,345,904.51) | 15,636,457,668.96 |
| Operating profit | 21,835,305,480.62 | 567,403,861.65 | (397,360,257.04) | 22,005,349,085.23 |
| Income tax expenses | 4,222,587,889.81 | 29,148,025.62 | (92,249,733.80) | 4,159,486,181.63 |
| Net profit | 17,226,896,333.80 | 546,344,836.10 | (305,110,523.24) | 17,468,130,646.66 |
---
# Revenue from external customers by location of revenue sources and non-current assets by location of assets
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Revenue from external customers in the PRC | 69,214,369,465.70 | 72,729,038,473.94 |
| Revenue from external customers in other countries | 6,482,189,507.83 | 6,215,631,149.11 |
| **Total** | **75,696,558,973.53** | **78,944,669,623.05** |
| Item | December 31, 2025 | December 31, 2024 (Restated) |
| :--- | :--- | :--- |
| Non-current assets in the PRC | 427,747,174,592.81 | 398,799,493,235.68 |
| Non-current assets in other countries | 17,488,449.42 | 21,735,406.22 |
| **Total** | **427,764,663,042.23** | **398,821,228,641.90** |
# Dependence on major customers
| Item | Operating revenue of 2025 | Percentage to the operating revenue of the Group | Operating revenue of 2024 | Percentage to the operating revenue of the Group (Restated) |
| :--- | :--- | :--- | :--- | :--- |
| Guangdong Power Grid Co., Ltd. (廣東電網有限責任公司) | 36,520,290,214.50 | 48.25% | 38,646,499,750.41 | 48.95% |
| State Grid Fujian Electric Power Co., Ltd. | 11,130,822,264.00 | 14.70% | 11,447,271,548.09 | 14.50% |
| Guangxi Power Grid Co., Ltd. | 7,911,316,557.54 | 10.45% | 9,785,710,543.33 | 12.40% |
| CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司) | 6,938,191,407.34 | 9.17% | 9,261,645,761.27 | 11.73% |
| Hong Kong Nuclear Investment Co., Ltd. (香港核電投資有限公司) | 6,194,685,126.90 | 8.18% | 6,052,830,098.86 | 7.67% |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## (XV) NOTES TO MAJOR ITEMS IN THE FINANCIAL STATEMENTS OF THE PARENT COMPANY
### 1. Accounts receivable
**(1) Accounts receivable disclosed by category**
| Category | December 31, 2025 Carrying balance Amount | December 31, 2025 Carrying balance Percentage | December 31, 2025 Bad debt provisions Amount | December 31, 2025 Bad debt provisions percentage | December 31, 2025 Carrying value | December 31, 2024 Carrying balance Amount | December 31, 2024 Carrying balance Percentage | December 31, 2024 Bad debt provisions Amount | December 31, 2024 Bad debt provisions percentage | December 31, 2024 Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **Accounts receivable for which provision for bad debts has been made by group** | 429,416,780.60 | 100.00% | 7,808,388.27 | 1.82% | 421,608,392.33 | 428,300,991.38 | 100.00% | 6,863,129.85 | 1.60% | 421,437,861.53 |
| Including: Accounts receivable by subsidiaries within the scope of consolidation | 331,977,907.69 | 77.31% | - | - | 331,977,907.69 | 302,190,225.23 | 70.56% | - | - | 302,190,225.23 |
| Group 1 | 97,383,372.91 | 22.68% | 7,780,638.27 | 7.99% | 89,602,734.64 | 123,021,887.23 | 28.72% | 6,557,477.15 | 5.33% | 116,464,410.08 |
| Group 2 | 55,500.00 | 0.01% | 27,750.00 | 50.00% | 27,750.00 | 3,088,878.92 | 0.72% | 305,652.70 | 9.90% | 2,783,226.22 |
| **Total** | 429,416,780.60 | 100.00% | 7,808,388.27 | 1.82% | 421,608,392.33 | 428,300,991.38 | 100.00% | 6,863,129.85 | 1.60% | 421,437,861.53 |
As part of the Company's credit risk management, the Company uses the age of accounts receivable to assess the impairment loss by grouping of accounts receivable with the same risk characteristics. The credit risk and expected credit loss of each group of accounts receivable are as follows:
**Accounts receivable by subsidiaries within the scope of consolidation:**
| Aging | December 31, 2025 Expected credit loss rate | December 31, 2025 Carrying balance | December 31, 2025 Bad debt provisions | December 31, 2025 Carrying value | December 31, 2024 Expected credit loss rate | December 31, 2024 Carrying balance | December 31, 2024 Bad debt provisions | December 31, 2024 Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Within 1 year | - | 129,596,706.09 | - | 129,596,706.09 | - | 161,656,935.26 | - | 161,656,935.26 |
| 1 to 2 years | - | 83,845,231.60 | - | 83,845,231.60 | - | 72,364,215.21 | - | 72,364,215.21 |
| 2 to 3 years | - | 55,760,870.00 | - | 55,760,870.00 | - | 68,169,074.76 | - | 68,169,074.76 |
| 3 to 4 years | - | 62,775,100.00 | - | 62,775,100.00 | - | - | - | - |
| **Total** | | 331,977,907.69 | - | 331,977,907.69 | | 302,190,225.23 | - | 302,190,225.23 |
---
### Group 1:
| Aging | December 31, 2025 Expected credit loss rate | December 31, 2025 Carrying balance | December 31, 2025 Bad debt provisions | December 31, 2025 Carrying value | December 31, 2024 Expected credit loss rate | December 31, 2024 Carrying balance | December 31, 2024 Bad debt provisions | December 31, 2024 Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Within 1 year | 0.30% | 55,362,571.77 | 166,087.72 | 55,196,484.05 | 0.30% | 71,284,064.30 | 213,852.19 | 71,070,212.11 |
| 1 to 2 years | 5.00% | 15,006,791.14 | 750,339.55 | 14,256,451.59 | 5.00% | 27,027,784.95 | 1,351,389.24 | 25,676,395.71 |
| 2 to 3 years | 20.00% | 12,399,920.00 | 2,479,984.00 | 9,919,936.00 | 20.00% | 24,207,756.67 | 4,841,551.33 | 19,366,205.34 |
| 3 to 4 years | 30.00% | 14,614,090.00 | 4,384,227.00 | 10,229,863.00 | 30.00% | 502,281.31 | 150,684.39 | 351,596.92 |
| **Total** | | **97,383,372.91** | **7,780,638.27** | **89,602,734.64** | | **123,021,887.23** | **6,557,477.15** | **116,464,410.08** |
### Group 2:
| Aging | December 31, 2025 Expected credit loss rate | December 31, 2025 Carrying balance | December 31, 2025 Bad debt provisions | December 31, 2025 Carrying value | December 31, 2024 Expected credit loss rate | December 31, 2024 Carrying balance | December 31, 2024 Bad debt provisions | December 31, 2024 Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Within 1 year | 0.30% | - | - | - | 0.30% | 147,785.41 | 443.35 | 147,342.06 |
| 1 to 2 years | 10.00% | - | - | - | 10.00% | 2,885,593.51 | 288,559.35 | 2,597,034.16 |
| 2 to 3 years | 30.00% | - | - | - | 30.00% | 55,500.00 | 16,650.00 | 38,850.00 |
| 3 to 4 years | 50.00% | 55,500.00 | 27,750.00 | 27,750.00 | 50.00% | - | - | - |
| **Total** | | **55,500.00** | **27,750.00** | **27,750.00** | | **3,088,878.92** | **305,652.70** | **2,783,226.22** |
## (2) Changes in provisions for bad debts of accounts receivable
| Item | December 31, 2025 |
| :--- | :--- |
| Opening balance | 6,863,129.85 |
| Provisions for the year | 4,203,903.90 |
| Recovered or reversed during the year | (3,258,645.48) |
| **Closing balance** | **7,808,388.27** |
## (3) Top five debtors with the largest closing balances of accounts receivable
| Name of entity | Carrying balance | Percentage to total accounts receivable (%) | Closing balance of provisions for bad debts |
| :--- | :--- | :--- | :--- |
| Taishan Nuclear | 66,194,137.18 | 15.41% | - |
| Yangjiang Nuclear | 63,432,415.87 | 14.77% | - |
| Ningde Nuclear | 46,595,174.40 | 10.85% | - |
| Hongyanhe Nuclear | 42,970,368.13 | 10.01% | 4,310,825.24 |
| Fangchenggang Nuclear | 35,558,531.72 | 8.28% | - |
| **Total** | **254,750,627.30** | **59.32%** | **4,310,825.24** |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 2. Other receivables
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Dividends receivable | 2,960,018,580.04 | 2,234,577,608.22 |
| Others | 32,913.34 | 7,580,985.05 |
| **Total** | **2,960,051,493.38** | **2,242,158,593.27** |
### (1) Dividends receivable
#### (a) Dividends receivable
**Debtors with closing balances**
| Investee | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Ling’ao Nuclear | 2,525,761,364.95 | 997,239,228.16 |
| Lingdong Nuclear | 430,861,741.12 | 780,861,741.12 |
| CIECC Engineering Company Limited (中諮工程有限公司) | 3,842,791.68 | 3,842,791.68 |
| CGN Engineering | – | 152,806,192.13 |
| CGN Fund Phase I | – | 300,922,562.40 |
| **Total** | **2,960,465,897.75** | **2,235,672,515.49** |
| Less: Bad debt provisions | 447,317.71 | 1,094,907.27 |
| **Carrying value** | **2,960,018,580.04** | **2,234,577,608.22** |
#### (b) As at December 31, 2025, significant dividends receivable aged over 1 year of the Company are as follows:
| Investee | Closing balance | Aging | Reason for being not recovered | Whether an impairment occurred and the basis for its judgment |
| :--- | :--- | :--- | :--- | :--- |
| Lingdong Nuclear | 430,861,741.12 | 2 to 3 years | Fund arrangement in the Group | No impairment occurred and Lingdong Nuclear maintained sound operation |
---
# (2) Others
## (a) Disclosed by category
| Category | December 31, 2025 Carrying balance Amount | December 31, 2025 Carrying balance Percentage | December 31, 2025 Bad debt provisions Amount | December 31, 2025 Bad debt provisions Provisions percentage | December 31, 2025 Carrying value | December 31, 2024 Carrying balance Amount | December 31, 2024 Carrying balance Percentage | December 31, 2024 Bad debt provisions Amount | December 31, 2024 Bad debt provisions Provisions percentage | December 31, 2024 Carrying value |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| **Provision for bad debts made by group** | 65,826.69 | 100.00% | 32,913.35 | 50.00% | 32,913.34 | 7,607,491.58 | 100.00% | 26,506.53 | 0.35% | 7,580,985.05 |
| – Other receivables by subsidiaries within the scope of consolidation | – | – | – | – | – | 5,288,824.13 | 69.52% | – | – | 5,288,824.13 |
| – Group 1 | – | – | – | – | – | 2,252,840.76 | 29.61% | 6,758.52 | 0.30% | 2,246,082.24 |
| – Group 2 | 65,826.69 | 100.00% | 32,913.35 | 50.00% | 32,913.34 | 65,826.69 | 0.87% | 19,748.01 | 30.00% | 46,078.68 |
| **Total** | 65,826.69 | 100.00% | 32,913.35 | 50.00% | 32,913.34 | 7,607,491.58 | 100.00% | 26,506.53 | 0.35% | 7,580,985.05 |
## (b) Changes in bad debt provisions
| Item | Phase 1 Expected credit losses within 12 months (2025) | Phase 2 Expected credit losses during the whole life (no credit impairment occurred) (2025) | Phase 3 Expected credit losses during the whole life (credit impairment occurred) (2025) | Total (2025) |
| :--- | :--- | :--- | :--- | :--- |
| January 1, 2025 | 6,758.52 | 19,748.01 | – | 26,506.53 |
| Provisions for the year | – | 13,165.34 | – | 13,165.34 |
| Recovered or reversed during the year | (6,758.52) | – | – | (6,758.52) |
| December 31, 2025 | – | 32,913.35 | – | 32,913.35 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
**(c) Disclosed by nature**
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Related party payments | – | 7,541,664.89 |
| Others | 65,826.69 | 65,826.69 |
| Total | 65,826.69 | 7,607,491.58 |
| Less: Bad debt provisions | 32,913.35 | 26,506.53 |
| Carrying value | 32,913.34 | 7,580,985.05 |
## 3. Other current assets
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Loans entrusted to subsidiaries | 11,798,930,734.15 | 17,614,499,999.99 |
| VAT retained at the end of the year | 255,078,248.56 | 191,966,398.06 |
| Interest receivable for entrusted loans | 8,609,388.42 | 12,421,456.95 |
| Total | 12,062,618,371.13 | 17,818,887,855.00 |
## 4. Debt investments
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Entrusted loans | 5,080,000,000.00 | 6,835,000,000.00 |
| Others | 59,785,414.49 | 59,767,538.42 |
| Less: Debt investments due within one year | – | 2,870,000,000.00 |
| Total | 5,139,785,414.49 | 4,024,767,538.42 |
---
# 5. Long-term equity investments
## (1) Long-term equity investments are classified as follows:
| Item | Carrying balance (December 31, 2025) | Impairment provision (December 31, 2025) | Carrying value (December 31, 2025) | Carrying balance (December 31, 2024) | Impairment provision (December 31, 2024) | Carrying value (December 31, 2024) |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Investments in subsidiaries | 107,716,239,293.78 | - | 107,716,239,293.78 | 89,851,555,613.45 | - | 89,851,555,613.45 |
| Investments in associates | 3,867,124,708.59 | - | 3,867,124,708.59 | 3,891,875,539.96 | - | 3,891,875,539.96 |
| **Total** | **111,583,364,002.37** | **-** | **111,583,364,002.37** | **93,743,431,153.41** | **-** | **93,743,431,153.41** |
## (2) Investment in subsidiaries
| Name of entity | Balance at January 1, 2025 | Changes in the current year: Additional investment | Changes in the current year: Reduced investment | Changes in the current year: Other changes | Balance at December 31, 2025 | Impairment provision | Cash dividends announced to be distributed for the year |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| GNIC | 22,734,177,521.54 | - | - | - | 22,734,177,521.54 | - | 7,300,000,000.00 |
| Ling'ao Nuclear | 6,883,160,867.23 | - | - | - | 6,883,160,867.23 | - | 2,508,522,136.79 |
| Lingdong Nuclear | 2,195,503,954.06 | - | - | - | 2,195,503,954.06 | - | - |
| Yangjiang Nuclear | 6,162,481,639.48 | - | - | - | 6,162,481,639.48 | - | 1,656,140,000.00 |
| CGN Operations | 282,339,557.09 | - | - | - | 282,339,557.09 | - | 827,000,000.00 |
| CNPRI | 4,210,682,040.74 | 500,000,000.00 | - | - | 4,710,682,040.74 | - | - |
| CGN Nuclear Power Investment Co., Ltd. (中廣核核電投資有限公司) | 9,562,835,909.32 | - | - | - | 9,562,835,909.32 | - | 2,411,180,000.00 |
| Ninghe Investment | 3,306,159,962.85 | - | - | - | 3,306,159,962.85 | - | 1,396,044,000.00 |
| SNPI | 1,061,032,900.00 | - | - | - | 1,061,032,900.00 | - | - |
| Taishan Nuclear | 3,600,022,661.30 | - | - | - | 3,600,022,661.30 | - | - |
| Taishan Investment | 8,769,244,739.87 | - | - | - | 8,769,244,739.87 | - | - |
| CGN Engineering | 5,305,562,399.05 | - | - | - | 5,305,562,399.05 | - | - |
| Lufeng Nuclear | 8,184,000,000.00 | 3,301,000,000.00 | - | - | 11,485,000,000.00 | - | - |
| Fangchenggang Investment | 4,655,911,100.00 | - | - | - | 4,655,911,100.00 | - | 753,766,807.08 |
| CGN Ocean Power Co., Ltd. (中廣核海洋能源有限公司) | 725,347,205.02 | 100,000,000.00 | - | - | 825,347,205.02 | - | - |
| CGN Power Sales Co., Ltd. (中廣核電力銷售有限公司) | 554,754,017.55 | 180,000,000.00 | - | - | 734,754,017.55 | - | - |
| Hepeng Supervision Company | 3,039,138.35 | - | - | - | 3,039,138.35 | - | - |
| Zhaoyuan Nuclear | 820,000,000.00 | 2,100,000,000.00 | - | - | 2,920,000,000.00 | - | - |
| Guizhou Yuping Clean Thermal Energy Co., Ltd. (貴州玉屏清潔熱能有限公司) | 449,700,000.00 | 25,000,000.00 | - | - | 474,700,000.00 | - | - |
| Guangxi Fangchenggang Third Nuclear Power Co., Ltd. (廣西防城港第三核電有限公司) | 305,000,000.00 | 213,500,000.00 | - | - | 518,500,000.00 | - | - |
| CGN Clean Energy | 60,600,000.00 | - | - | - | 60,600,000.00 | - | - |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
| Name of entity | Balance at January 1, 2025 | Additional investment | Reduced investment | Other changes | Balance at December 31, 2025 | Impairment provision | Cash dividends announced to be distributed for the year |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| Huapeng Technology Energy (Guangdong) Co., Ltd. (華鵬科技能源(廣東)有限公司) | 20,000,000.00 | 84,000,000.00 | – | – | 104,000,000.00 | – | – |
| Taishan Second Nuclear | – | 1,740,000,000.00 | – | – | 1,740,000,000.00 | – | – |
| Huizhou Nuclear | – | 7,327,413,680.33 | – | – | 7,327,413,680.33 | – | – |
| Huizhou Second Nuclear | – | 1,993,770,000.00 | – | – | 1,993,770,000.00 | – | – |
| Huizhou Third Nuclear | – | 100,000,000.00 | – | – | 100,000,000.00 | – | – |
| CGN (Jieyang) Nuclear Power Co., Ltd. (中廣核(揭陽)核電有限公司) | – | 100,000,000.00 | – | – | 100,000,000.00 | – | – |
| Shandong Rizhao Dawang Clean Energy Co., Ltd. (山東日照大旺清潔能源有限公司) | – | 50,000,000.00 | – | – | 50,000,000.00 | – | – |
| Shandong Weifang Taolin Clean Energy Co., Ltd (山東濰坊桃林清潔能源有限公司) | – | 50,000,000.00 | – | – | 50,000,000.00 | – | – |
| CGN Zhanjiang Nuclear Power Co., Ltd. (中廣核湛江核電有限公司) | – | – | – | – | – | – | – |
| CGN Eastern Guangdong (Lufeng) Nuclear Co., Ltd. (中廣核粵東(陸豐)核電有限公司) | – | – | – | – | – | – | – |
| **Total** | **89,851,555,613.45** | **17,864,683,680.33** | **–** | **–** | **107,716,239,293.78** | **–** | **16,852,652,943.87** |
**Other explanation:**
As at December 31, 2024 and December 31, 2025, the Company pledged its long-term equity investment in Taishan Nuclear for its subsidiaries’ loans, and thus the ownership of which was restricted. The Company’s net long-term equity investment with restricted ownership in Taishan Nuclear was RMB3,600,022,661.30.
---
## (3) Investment in associates
| Investee | Balance at January 1, 2025 | Additional investment | Reduced investment | Changes in the current year: Investment income recognized under the equity method | Changes in the current year: Adjustment of other comprehensive income | Changes in the current year: Declared cash dividends or profits | Balance at December 31, 2025 | Closing balance of impairment provisions |
| :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- | :--- |
| CGN Fund Phase I | 3,830,054,294.72 | - | - | 456,311,406.73 | 1,529,169.17 | (487,562,872.00) | 3,800,331,998.62 | - |
| Xiong’an Xingrong Nuclear Power Innovation Center Co., Ltd. (雄安興融核電創新中心有限公司) | 20,128,592.85 | - | - | 17,698.80 | - | - | 20,146,291.65 | - |
| CIECC Engineering Company Limited (中諮工程有限公司) | 41,692,652.39 | - | - | 4,953,765.93 | - | - | 46,646,418.32 | - |
| **Total** | **3,891,875,539.96** | **-** | **-** | **461,282,871.46** | **1,529,169.17** | **(487,562,872.00)** | **3,867,124,708.59** | **-** |
## 6. Short-term loans
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Credit loans | 3,000,000,000.00 | - |
| Short-term loans interest payable | 1,800,000.00 | - |
| **Total** | **3,001,800,000.00** | **-** |
## 7. Long-term loans
| Item | December 31, 2025 | December 31, 2024 |
| :--- | :--- | :--- |
| Credit loans | 3,636,000,000.00 | 1,210,000,000.00 |
| **Total** | **3,636,000,000.00** | **1,210,000,000.00** |
| Less: Long-term loans due within one year | - | 950,000,000.00 |
| **Long-term loans due after one year** | **3,636,000,000.00** | **260,000,000.00** |
## 8. Operating revenue and operating costs
| Item | 2025 Revenue | 2025 Cost | 2024 Revenue | 2024 Cost |
| :--- | :--- | :--- | :--- | :--- |
| From other operations | 169,757,963.74 | 123,275,148.16 | 144,157,801.24 | 71,900,366.83 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
## 9. Investment income
Details of investment income
| Item | 2025 | 2024 |
| :--- | :--- | :--- |
| Income from long-term equity investments accounted for using the cost method | 16,852,652,943.87 | 2,584,830,116.85 |
| Income from long-term equity investments accounted for using the equity method | 461,282,871.46 | 474,340,242.57 |
| Interest income from entrusted loans | 377,691,252.97 | 474,350,051.49 |
| Investment losses from disposal of long-term equity investments | – | (6,134,330.58) |
| Others | 4,516,542.22 | 5,198,847.51 |
| **Total** | **17,696,143,610.52** | **3,532,584,927.84** |
## 10. Supplementary information to cash flow statements
| Supplementary information | 2025 | 2024 |
| :--- | :--- | :--- |
| **1. Reconciliation of net profit to cash flows from operating activities:** | | |
| Net profit | 16,704,297,036.75 | 2,559,163,330.60 |
| Add: Losses from credit impairment | 304,075.68 | 5,094,713.94 |
| Depreciation of fixed assets | 21,342,135.09 | 107,712,653.74 |
| Amortization of intangible assets | 202,382,174.12 | 102,302,290.03 |
| Depreciation of right-of-use assets | 59,903,165.04 | 59,084,587.72 |
| Losses on retirement of fixed assets | 121,329.25 | – |
| Finance costs | 258,194,496.59 | 238,193,138.51 |
| Investment income | (17,696,143,610.52) | (3,532,584,927.84) |
| Increase in operating receivables | (173,641,435.93) | (79,848,043.51) |
| Increase in operating payables | 163,125,432.59 | 139,534,362.89 |
| **Net cash flows used in operating activities** | **(460,115,201.34)** | **(401,347,893.92)** |
| **2. Net changes in cash and cash equivalents:** | | |
| Closing balance of cash and cash equivalents | 6,306,478,918.66 | 7,620,333,054.12 |
| Less: Opening balance of cash and cash equivalents | 7,620,333,054.12 | 7,823,758,262.55 |
| **Net decrease in cash and cash equivalents** | **(1,313,854,135.46)** | **(203,425,208.43)** |
---
# (XVI) SUPPLEMENTARY INFORMATION
## 1. Breakdown of non-recurring gains or losses
| Item name | 2025 |
| :--- | :--- |
| Gains or losses from disposal of non-current assets | 22,852,022.34 |
| Government grants recognized in profit or loss for the current period (except for those closely related to the Company’s normal business operations, in compliance with national policies, conform with established standards and have a lasting impact on the Company’s profits or losses on an ongoing basis) | 469,912,280.33 |
| Except for the effective hedging transactions related to the normal operation of the Company, the gains or losses from changes in fair value arising from holding financial assets and liabilities by non-financial enterprises, as well as the gains or losses from disposal of financial assets and liabilities | 55,074,792.10 |
| Reversal of provision for impairment of receivables subject to individual impairment tests | 1,030,756.69 |
| Other non-operating income and expenses other than the items above, net | 177,269,549.19 |
| **Subtotal** | **726,139,400.65** |
| Income tax effect | 43,736,254.60 |
| Effect on non-controlling shareholders (after tax) | 30,082,467.04 |
| **Total** | **652,320,679.01** |
## 2. Return on equity and earnings per share
The statements for return on equity and earnings per share have been prepared by the Company in accordance with the relevant requirements under the Rules on the Preparation and Report of Information Disclosure for Companies Publicly Issuing Securities No. 9 – Calculation and Disclosure of Return on Equity and Earnings Per Share (2010 Revision) issued by the CSRC.
| Profit for the reporting period (2025) | Weighted average return on equity | Basic earnings per share | Diluted earnings per share |
| :--- | :---: | :---: | :---: |
| Net profit attributable to holders of ordinary shares of the Company | 9.11% | 0.193 | 0.192 |
| Net profit attributable to holders of ordinary shares of the Company (excluding the non-recurring gains or losses) | 7.60% | 0.180 | 0.179 |
---
# Notes to the Financial Statements
(All amounts in RMB unless otherwise stated)
| Profit for the reporting period (2024) (Restated) | Weighted average return on equity | Basic earnings per share | Diluted earnings per share |
| :--- | :---: | :---: | :---: |
| Net profit attributable to holders of ordinary shares of the Company | 9.76% | 0.215 | 0.215 |
| Net profit attributable to holders of ordinary shares of the Company (excluding the non-recurring gains or losses) | 8.59% | 0.213 | 0.213 |
**Note:** In 2024, the Group did not have any dilutive potential ordinary shares. Therefore, diluted earnings per share was the same as the basic earnings per share.
## (1) Calculation of basic earnings per share
### (a) Basic earnings per share
Please refer to Note (V) 59 for details of the calculation of basic earnings per share.
### (b) Basic earnings per share (excluding non-recurring gains or losses)
Basic earnings per share (excluding non-recurring gains or losses) is calculated by dividing the consolidated net profit attributable to holders of ordinary shares of the Company (excluding non-recurring gains or losses) by the weighted average number of ordinary shares of the Company in issue:
| | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company | 9,765,358,959.88 | 10,838,120,422.43 |
| Non-recurring gains or losses attributable to holders of ordinary shares of the Company | 652,320,679.01 | 101,049,220.86 |
| Consolidated net profit attributable to holders of ordinary shares of the Company (excluding non-recurring gains or losses) | 9,113,038,280.87 | 10,737,071,201.57 |
| Weighted average number of ordinary shares of the Company in issue | 50,498,611,100.00 | 50,498,611,100.00 |
| **Basic earnings per share (excluding non-recurring gains or losses) (RMB/share)** | **0.180** | **0.213** |
### (c) Diluted earnings per share
Please refer to Note (V) 59 for details of the calculation of diluted earnings per share.
### (d) Diluted earnings per share (excluding non-recurring gains or losses)
Diluted earnings per share (excluding non-recurring gains or losses) is calculated by dividing the consolidated net profit attributable to holders of ordinary shares of the Company (excluding non-recurring gains or losses) (diluted) by the weighted average number of ordinary shares of the Company in issue (diluted):
---
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company (diluted) | 9,798,692,062.89 | 10,838,120,422.43 |
| Non-recurring gains or losses attributable to holders of ordinary shares of the Company | 652,320,679.01 | 101,049,220.86 |
| Consolidated net profit attributable to holders of ordinary shares of the Company (excluding non-recurring gains or losses) (diluted) | 9,146,371,383.88 | 10,737,071,201.57 |
| Weighted average number of ordinary shares of the Company in issue (diluted) | 51,054,923,543.23 | 50,498,611,100.00 |
| Diluted earnings per share (excluding non-recurring gains or losses) (RMB/share) | 0.179 | 0.213 |
## (2) Calculation of weighted average return on equity
### (a) Weighted average return on equity
Weighted average return on equity is calculated by dividing the consolidated net profit attributable to holders of ordinary shares of the Company by the weighted average consolidated net assets attributable to holders of ordinary shares of the Company:
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Consolidated net profit attributable to shareholders of ordinary shares of the Company | 9,765,358,959.88 | 10,838,120,422.43 |
| Weighted average consolidated net assets attributable to holders of ordinary shares of the Company | 107,246,583,326.63 | 111,036,612,772.47 |
| Weighted average return on equity | 9.11% | 9.76% |
### (b) Weighted average return on equity (excluding non-recurring gains or losses)
Weighted average return on equity (excluding non-recurring gains or losses) is calculated by dividing the consolidated net profit attributable to holders of ordinary shares of the Company (excluding non-recurring gains or losses) by the weighted average consolidated net assets attributable to holders of ordinary shares of the Company:
| Item | 2025 | 2024 (Restated) |
| :--- | :--- | :--- |
| Consolidated net profit attributable to holders of ordinary shares of the Company (excluding non-recurring gains or losses) | 9,113,038,280.87 | 10,737,071,201.57 |
| Weighted average consolidated net assets attributable to holders of ordinary shares of the Company | 119,961,511,743.98 | 124,972,290,685.19 |
| Weighted average return on equity (excluding non-recurring gains or losses) | 7.60% | 8.59% |
---
# Definitions
| Terms | Explanation |
| :--- | :--- |
| A-share convertible corporate bonds | the A-share convertible corporate bonds issued and listed by the Company on the SZSE on July 25, 2025 |
| Articles of Association | Articles of Association of CGN Power Co., Ltd. |
| Cangnan Nuclear | CGN Cangnan Nuclear Power Co., Ltd. (中廣核蒼南核電有限公司), an enterprise controlled by CGNPC |
| Cangnan Phase I Project | Cangnan Unit 1 and Unit 2 Project |
| Cangnan Phase II Project | Cangnan Unit 3 and Unit 4 Project |
| CEC | the China Electricity Council |
| CGN Engineering | China Nuclear Power Engineering Co., Ltd. (中廣核工程有限公司), a wholly-owned subsidiary of the Company |
| CGN Finance | CGN Finance Co., Ltd. (中廣核財務有限責任公司), an enterprise controlled by CGNPC, and held as to 30% by CGN Engineering |
| CGN Fund Phase I | CGN Industry Investment Fund Phase I Co., Ltd. (中廣核一期產業投資基金有限公司), an associate directly held as to 38.82% by the Company |
| CGN Group | CGNPC and its subsidiaries (excluding the Group) |
| CGN Investment | CGN Nuclear Power Investment Co., Ltd. (中廣核核電投資有限公司), a subsidiary directly held as to 77.78% by the Company |
| CGN Operations | China Nuclear Power Operations Co., Ltd. (中廣核核電運營有限公司), a wholly-owned subsidiary of the Company |
| CGN Uranium | CGNPC Uranium Resources Co., Ltd., an enterprise controlled by CGNPC |
| CGNPC | China General Nuclear Power Corporation (中國廣核集團有限公司), the controlling shareholder and a substantial shareholder of the Company |
| CNNC | China National Nuclear Corporation (中國核工業集團有限公司) |
---
| Term | Definition |
| :--- | :--- |
| CNPRI | China Nuclear Power Technology Research Institute Co., Ltd. (中廣核研究院有限公司), a wholly-owned subsidiary of the Company |
| CSRC | the China Securities Regulatory Commission |
| DNMC | Daya Bay Nuclear Power Operations and Management Co., Ltd. (大亞灣核電運營管理有限責任公司), a subsidiary indirectly held as to 87.5% by the Company |
| ESG | environmental, social, and governance |
| Fangchenggang Nuclear | Guangxi Fangchenggang Nuclear Power Co., Ltd. (廣西防城港核電有限公司), a subsidiary indirectly held as to 36.6% by the Company |
| Fangchenggang Phase II Project | Fangchenggang Unit 3 and Unit 4 Project |
| Fangchenggang Phase III Project | Fangchenggang Unit 5 and Unit 6 Project |
| FCD | the First Concrete Day of the main plant of the nuclear reactor |
| GNIC | Guangdong Nuclear Power Investment Co., Ltd., a wholly-owned subsidiary of the Company |
| Hengjian Investment | Guangdong Hengjian Investment Holding Co., Ltd. (廣東恒健投資控股有限公司) |
| HKNIC | Hong Kong Nuclear Investment Co., Ltd. (香港核電投資有限公司), a connected person in terms of H shares of the Group |
| Hong Kong Stock Exchange | The Stock Exchange of Hong Kong Limited |
| Hongyanhe Nuclear | Liaoning Hongyanhe Nuclear Power Co., Ltd. (遼寧紅沿河核電有限公司), an associate of the Company |
| Huizhou Second Nuclear | CGN Huizhou Second Nuclear Power Co., Ltd. (中廣核惠州第二核電有限公司), which was acquired by the Company from CGNPC in October 2025, and is a wholly-owned subsidiary of the Company |
---
# Definitions
| Term | Definition |
| :--- | :--- |
| **Huizhou Third Nuclear** | CGN Huizhou Third Nuclear Power Co., Ltd. (中廣核惠州第三核電有限公司), which was acquired by the Company from CGNPC in October 2025, and is a wholly-owned subsidiary of the Company |
| **Huizhou Nuclear** | CGN Huizhou Nuclear Power Co., Ltd. (中廣核惠州核電有限公司), which was acquired by the Company from CGNPC in October 2025, and is a subsidiary held as to 82% by the Company |
| **Huizhou Phase I Project** | Huizhou Unit 1 and Unit 2 Project |
| **IIR** | the International Integrated Reporting framework (now part of the International Financial Reporting Standards of the International Sustainability Standards Board) at www.integratedreporting.org |
| **IPO** | initial public offering |
| **INES** | the International Nuclear and Radiological Event Scale (《國際核事件分級表》) set by the International Atomic Energy Agency (IAEA) |
| **Ling’ao Nuclear** | Ling’ao Nuclear Power Co., Ltd. (嶺澳核電有限公司), a wholly-owned subsidiary directly and indirectly held as to 100% by the Company |
| **Lingdong Nuclear** | Lingdong Nuclear Power Co., Ltd. (嶺東核電有限公司), a subsidiary directly and indirectly held as to 93.88% by the Company |
| **Lufeng Nuclear** | CGN Lufeng Nuclear Power Co., Ltd. (中廣核陸豐核電有限公司), a wholly-owned subsidiary of the Company |
| **Ningde Nuclear** | Fujian Ningde Nuclear Power Co., Ltd. (福建寧德核電有限公司), a subsidiary indirectly held as to 33.76% by the Company |
| **Ningde Second Nuclear** | Fujian Ningde Second Nuclear Power Co., Ltd. (福建寧德第二核電有限公司), a joint venture of the Company |
| **GNPJVC** | Guangdong Nuclear Power Joint Venture Co., Ltd. (廣東核電合營有限公司), a subsidiary indirectly held as to 75% by the Company |
| **nuclear power generating units under construction** | nuclear power generating units approved and pending for FCD and under construction |
---
**SASAC**: the State-Owned Assets Supervision and Administration Commission of the State Council
**SCS**: standardization, centralization and specialization
**SNPI**: Suzhou Nuclear Power Research Institute (蘇州熱工研究院有限公司), a wholly-owned subsidiary of the Company
**SZSE**: Shenzhen Stock Exchange
**Taishan Second Nuclear**: CGN Taishan Second Nuclear Power Co., Ltd. (中廣核台山第二核電有限公司), which was acquired by the Company from CGNPC in January 2025, and is a wholly-owned subsidiary of the Company
**Taishan Nuclear**: Taishan Nuclear Power Joint Venture Co., Ltd. (台山核電合營有限公司), a subsidiary directly and indirectly held as to 51% by the Company
**the Company, our Company, CGN Power, we, us**: CGN Power Co., Ltd.
**the Group**: CGN Power Co., Ltd. and its subsidiaries
**Third Plenary Session of the 20th CPC Central Committee**: the third plenary session of the 20th Central Committee of the Communist Party of China
**Three Wastes**: radioactive gas waste, radioactive liquid waste and radioactive solid waste
**WANO**: the World Association of Nuclear Operators
**Yangjiang Nuclear**: Yangjiang Nuclear Power Co., Ltd. (陽江核電有限公司), a subsidiary directly and indirectly held as to 61.72% by the Company
**Zhanjiang Nuclear**: CGN Zhanjiang Nuclear Power Co., Ltd. (中廣核湛江核電有限公司), which was acquired by the Company from CGNPC in October 2025, and is a subsidiary held as to 100% by the Company
**2024 Annual Report**: the 2024 Annual Report of the Company available on the website of the Hong Kong Stock Exchange at www.hkexnews.hk and our website at www.cgnp.com.cn on April 11, 2025
---
# Definitions
**2025 Annual Report, this report** the report presents the audited consolidated results of the Group for the year ended December 31, 2025 together with the comparative figures for 2024, and summarizes the progress in implementing our development strategy
**2025 ESG Report** the 2025 Environmental, Social, and Governance Report of the Company available on the website of the Hong Kong Stock Exchange at www.hkexnews.hk and our website at www.cgnp.com.cn on March 25, 2026
**annual cap(s)** the cap(s) of annual transaction amount(s) approved by the Board or general meeting of the Company during the term of continuing connected transaction agreement(s) entered into (and renewed from time to time) between the Company and the connected person(s) as defined under the Listing Rules
**Procedural Rules of General Meeting** the Procedural Rules of General Meeting of CGN Power Co., Ltd. (with its Chinese name as《中國廣核電力股份有限公司股東大會議事規則》prior to the amendments on October 16, 2025 and《中國廣核電力股份有限公司股東會議事規則》after such amendments) of the Company
**independent non-executive Director(s), independent Director(s)** independent non-executive Director(s) and independent Director(s) have the same meaning
**general meeting, shareholders' meeting** general meeting and shareholders' meeting have the same meaning
**Yuan** Renminbi Yuan, the lawful currency of the PRC, unless the context otherwise requires
**"14th Five-Year"** 2021 to 2025
**"15th Five-Year"** 2026 to 2030
---
# Company Information
## Joint Company Secretaries
Mr. Yin Engang
Ms. Ng Sau Mei
## Auditor
**KPMG Huazhen LLP**
8/F, Tower E2, Oriental Plaza,
1 Chang’an Avenue,
Dongcheng District, Beijing, the PRC
## Legal Advisors
### Hong Kong Law
**King & Wood**
13/F, Gloucester Tower, The Landmark,
15 Queen’s Road Central, Central, Hong Kong
### PRC Law
**King & Wood**
28/F, China Resources Tower, 2666 Keyuan South Road,
Nanshan District, Shenzhen, the PRC
## Principal Bankers
**China Development Bank (Shenzhen Branch)**
CDB Financial Center Building,
2003 Fuzhong 3rd Road,
Futian District, Shenzhen,
Guangdong Province, the PRC
**Agricultural Bank of China Limited (Shenzhen Branch)**
ABC Building,
5008 Shennan East Road, Luohu District, Shenzhen,
Guangdong Province, the PRC
**Bank of China Limited (Shenzhen Branch)**
1/F, International Finance Building,
2022 Jianshe Road, Luohu District, Shenzhen,
Guangdong Province, the PRC
**Postal Savings Bank of China Co., Ltd. (Shenzhen Branch)**
2/F and 41-43/F, Postal Information Complex Building,
48 Yitian Road, Futian District, Shenzhen,
Guangdong Province, the PRC
**Industrial and Commercial Bank of China Limited (Shenzhen Branch)**
Shenzhen ICBC Building,
No. 1255 Haide 3rd Road, Yuehai Sub-district,
Nanshan District, Shenzhen,
Guangdong Province, the PRC
---
# Company Information
## Availability of Annual Report
This report was available on the website of the SZSE at www.szse.cn, the website of the Hong Kong Stock Exchange at www.hkexnews.hk and the investors relations column on our website at www.cgnp.com.cn by April 20, 2026.
Those Shareholders who (a) received this report electronically and would like to receive a printed copy or vice versa; or (b) received a printed copy of this report in either English or Chinese language only and would like to receive a printed copy of the other language version or to receive printed copies of both language versions in the future, are requested to contact the Company's H Share Registrar.
Shareholders may at any time change their choice of the language version or means of receipt of the Company's corporate communications by contacting the Company's H Share Registrar.
### H Share Registrar
Computershare Hong Kong Investor Services Limited
17M Floor, Hopewell Centre,
183 Queen's Road East, Wan Chai,
Hong Kong
Telephone: (852) 2862 8688, (852) 2862 8555
Email: cgnpower.ecom@computershare.com.hk
## Annual General Meeting
The 2025 AGM is scheduled to be held in May 2026. The circular setting out the relevant details (including shareholders' right to demand a poll) together with a proxy form to the Shareholders will be available on the website of the Hong Kong Stock Exchange at www.hkexnews.hk and the investors relationship column on our website at www.cgnp.com.cn in due course.
## Transfer of Shares
For the purposes of receiving final cash dividends and attending the AGM, the details of the procedures of registration of shares and book closure dates are set out in the circular to be available on the website of the Hong Kong Stock Exchange at www.hkexnews.hk and the investors relationship column on our website at www.cgnp.com.cn.
## Share Registrar
### H Shares
Computershare Hong Kong Investor Services Limited
Address: Shops 1712-1716, 17th Floor, Hopewell Centre, 183 Queen's Road East, Wan Chai, Hong Kong
### A Shares
Shenzhen Branch of China Securities Depository and Clearing Corporation Limited
Address: 25th Floor, Shenzhen Stock Exchange Building, 2012 Shennan Boulevard, Lianhua Sub-district, Futian District, Shenzhen, Guangdong Province, the PRC
## Our Stock Name and Stock Code
### H Shares
**Stock Name:** CGN Power
**Stock Code:** HKSE 1816
### A Shares
**Stock Name:** CGN
**Stock Code:** SZSE 003816
## Contact Details
**Headquarters in the PRC:** 18/F, South Tower, CGN Building, No.2002 Shennan Road, Shenzhen, Guangdong Province, the PRC
**Postal Code:** 518026
**Hong Kong:** 31/F, Tower Two, Times Square, 1 Matheson Street, Causeway Bay, Hong Kong
## Investor Inquiry
**Telephone:** (86) 755 84430888
**Facsimile:** (86) 755 83699089
**Email:** IR@cgnp.com.cn
**Website:** www.cgnp.com.cn
---
# FEEDBACK FORM
**Dear Reader:**
Thank you for reading the 2025 Annual Report published by CGN Power. For our continuous improvement in preparation of such report in future, we highly value and look forward to hearing your comments on our 2025 Annual Report.
You are welcomed to complete the following form and return the same to us by e-mail, fax or post. We would like to express our deepest gratitude for your valuable comments!
## 1. Feedback Form (please tick “√” where appropriate)
| | I can easily understand the contents | | | | I can get useful information | | | |
| :--- | :---: | :---: | :---: | :---: | :---: | :---: | :---: | :---: |
| | **Strongly agree** | **Agree** | **Disagree** | **Strongly disagree** | **Strongly agree** | **Agree** | **Disagree** | **Strongly disagree** |
| Business at a Glance for the Year | | | | | | | | |
| Chairman’s Statement | | | | | | | | |
| President’s Review | | | | | | | | |
| Shareholder Value | | | | | | | | |
| **Finance, Assets and Investments** | | | | | | | | |
| Financial Performance and Analysis | | | | | | | | |
| Assets and Investments | | | | | | | | |
| **Business Performance and Outlook** | | | | | | | | |
| Industry Overview | | | | | | | | |
| Business Performance and Analysis | | | | | | | | |
| Future Outlook | | | | | | | | |
| **Capitals** | | | | | | | | |
| Production Capital | | | | | | | | |
| Intellectual Capital | | | | | | | | |
| Human Capital | | | | | | | | |
| Financial Capital | | | | | | | | |
| Environmental Capital | | | | | | | | |
| Social and Relationship Capital | | | | | | | | |
| **Corporate Governance** | | | | | | | | |
| Board of Directors and Senior Management | | | | | | | | |
| Corporate Governance Report | | | | | | | | |
| Directors’ Report | | | | | | | | |
| Audit and Risk Management Committee Report | | | | | | | | |
| Remuneration Committee Report | | | | | | | | |
| Nomination Committee Report | | | | | | | | |
| Nuclear Safety Committee Report | | | | | | | | |
| Risk Management Report | | | | | | | | |
| Financial Report | | | | | | | | |
| Definitions | | | | | | | | |
| Company Information | | | | | | | | |
| Overall Rating of the Annual Report | | | | | | | | |
---
2. Which parts of the Annual Report are you most interested in?
3. What additional information do you expect to be provided in the Annual Report?
4. Any other comments/suggestions?
**Please provide your information* below if you so wish:**
**Name:**
**Work Unit:**
**Tel:**
**E-mail:**
\* Your personal data provided in this form may be used in connection with our management of your request, inquiry, comments or suggestions, or conducting or publishing statistical and data analysis. The provision of personal data is on a voluntary basis. However, we may not be able to follow up on your request or inquiry unless you provide us with your personal data.
Your personal data will not be transferred to any third party.
Your personal data will be retained for such period as may be necessary for the above purposes and its directly related purpose(s) and will be destroyed within two years after the date of receipt of your personal data.
# Our Contact Details:
**Address:** 18/F, South Tower, CGN Building, No. 2002 Shennan Road, Shenzhen, Guangdong Province, the PRC
**Postal Code:** 518026
**Tel:** (86) 755 84430888
**Fax:** (86) 755 83699089
**E-mail:** IR@cgnpc.com.cn
# MAILING LABEL 郵寄標籤
Please cut the mailing label and stick this on the envelope to return this Change Request Form to us.
**No postage stamp necessary if posted in Hong Kong.**
閣下寄回此更改回條時,請將郵寄標籤剪貼於信封上。
如在本港投寄毋須貼上郵票。
**Computershare Hong Kong Investor Services Limited**
香港中央證券登記有限公司
Freepost No. 37 簡便回郵號碼
Hong Kong 香港
---
# CGN Power
A world-class nuclear power supplier and service provider with international competitiveness
本年度報告以環保紙張印製。
This Annual Report is printed on environmentally friendly paper.